FUNDS FOR NEW AIR HANDLERS

Document Type: 
Collection: 
Document Number (FOIA) /ESDN (CREST): 
CIA-RDP86-01019R000100240007-2
Release Decision: 
RIPPUB
Original Classification: 
K
Document Page Count: 
4
Document Creation Date: 
December 14, 2016
Document Release Date: 
May 16, 2003
Sequence Number: 
7
Case Number: 
Publication Date: 
August 29, 1974
Content Type: 
MF
File: 
AttachmentSize
PDF icon CIA-RDP86-01019R000100240007-2.pdf190.1 KB
Body: 
Approved For Release 2003/06/20 : CIA-RDP86-01019R000100240007-2 2.9 AUl 74 MEMORANDUM FOR: Director of Logistics THROUGH Chief, Real Estate and Construction Division, OL SUBJECT : Funds for New Air Handlers REFERENCE Computer Systems Planning Report dtd 6 Jun 74 by OJCS A request for guidance in the funding of $14,000 for the procurement and installation of new air handlers in room GC03, office of Joint Computer Support (OJCS), is requested in para- graph 6. 2. The referent report identified a matrix of generalized space and utility requirements against various computer configura- tion assumptions through FY 1978. Specific equipment locations were not included in the report. 3. The specific equipment location for Milestone No. I of the report, the installation of the IBM 370/158-2, has now been identified. The unit is scheduled to be located in the southwest quadrant of GCO3 served by perimeter air handler Nos. b and 7. 4. As previously identified, the underfloor congestion and multiple heating, ventilating, and air conditioning (HVAC) systems serving the GC03 area present indeterminacy in HVAC designs. Within the constraints of this indeterminacy, analysis indicates that the existing air handlers may not have the capacity to meet the increased requirements of the 370/158-2 installation. In lieu of an indepth engineering study and relatively extensive modifica- tions in the instrumentations and control of the HVAC systems, the only sure alternative to insure an acceptable environment will exist to support the installation in the area is to aerate air handler Nos. 6 and 7 from a 10-ton rating to a 20-ton rating. This will be an ad hoc action to insure adequate results for a specific installation in a specific area. This action will not contribute to the resolution of the overall HVAC problems in the OJCS Computer Center, nor will it necessarily be effective if the location of the 370/158-2 is altered to a new location in a different quadrant of the Center. 5. OJCS representatives are in agreement that uprated air handlers are necessary, but advises that OJCS STAT OL 4 4410 Approved For Release 2003/06/20 : CIA-RDP86-01019R000100240007-2 Approved For Release 2003/06/20 : CIA-RDP86-01019R000100240007-2 SUBJECT: Funds for New Air Handlers PY 1975 funds are not available for this unanticipated requirement. The budgetary cost estimate for procurement and installation of the uprated units is $14,000. 6. There is mutual agreement between Real Estate and Construction Division and OJCS that air handier Nos. 6 and 7 must be uprated to insure that an adequate environment will exist to support the new 370/158-2 computer. Neither QJCS nor OL has pro- grammed funds in PY 1975 for this unanticipated requirement. OJCS has advised that funds are not available, and has requested OL to identify funds. Guidance is requested in the identification of approximately $14,000 for the uprating of air handler Nos. 6 and 7. STAT e.. Headquarters Engineering Branch, RECD/OL Approved For Release 2003/06/20 : CIA-RDP86-01019R000100240007-2 [~ ~ UMCLAS$)IFOEgied Fo(HelWf3 3/06/20: CIA-RDP86 0101H9NFQ 0 1p7-2 ^ SECRET ROUTING AND RECORD SHEET SUBJECT: (Optional) Funds for New Air Handlers FROM: C/HEB/RECD/OL EXTENSION NO, 2F42 Hqs. 0 DATE --- --- - ST TO: (Officer designation, room number, and building) DATE OFFICER'S COMMENTS (Number each comment to show from whom RECEIVED FORWARDED INITIALS to whom. Draw a line across column after each comment.) 1 C/RECD/OL AUG 1 74 RE : Paragraph 6 906 Ames 2. Glenn: Assume RECD would recommend 3. OL funds under policy that planning and control of utilit systems may be achieved onl 4. y if RECD is the sole source of funding utility-related pro- jects. Possible we should 5. include a relatively large but redefined line item in FY 76 for unanticipated projects 6. like this and the GJ56 9K ex- penditure. As I see it, there re four alternatives a 7? s follows listed in order of my perception of desirability: B? a. OL fund out of 1121 funds 9. b. OL reprogram and fund 10. C. OL advise OJCS to reprogram through DD 11. d. Chance it and try to get adequate air int th l i e ocat on from 12. spare capacity in other air handlers. 13. To meet the Oct. installati date, procurement must be S i iti d n ate in the immediate 14. future. This memo has been coordinated with f OJCS o . 15. Approved For Releas 2003/0 /20 : CIA -RDP86- 1019R000100240'2 FORM 610 USE EDITIO PREVIOUS F-] SECRET ^ CONFIDENTIAL E:] USEE ONLY ^ UNCLASSIFIED 3-62 n T %T STAT Approved For Release 2003/06/20 : CIA-RDP86-01019R000100240007-2 Next 3 Page(s) In Document Exempt Approved For Release 2003/06/20 : CIA-RDP86-01019R000100240007-2