UTILITIES FOR ODP COMPUTER CENTERS

Document Type: 
Collection: 
Document Number (FOIA) /ESDN (CREST): 
CIA-RDP86-01019R000200030006-5
Release Decision: 
RIPPUB
Original Classification: 
K
Document Page Count: 
2
Document Creation Date: 
December 16, 2016
Document Release Date: 
July 5, 2005
Sequence Number: 
6
Case Number: 
Publication Date: 
August 3, 1981
Content Type: 
MF
File: 
AttachmentSize
PDF icon CIA-RDP86-01019R000200030006-5.pdf89.85 KB
Body: 
/& A APLI BS!L&) P: J-' H E C 6 (-'~ f q 44S C C C / f rovedrl3r Release 2005/07/12 :CIA-RDP86-O~iifir19R0002'~0 0006-5 -5 CAM 03AUG1981 IEX MEMORANDUM FOR: Director of Logistics FROM: Bruce T. Johnson Director of Data Processing SUBJECT: Utilities for ODP Computer Centers 1. Action Requested: C/ R-EB 810 C/FEngB C/HEB FILE We request that the office of Logistics take the necess:iry;y steps to lower the rate of utility failures to no more than one per year for each of the ODP computer centers. As an immediate measure scheduled maintenance and scheduled repair should be conducted on ODP utilities outside of prime time working hours. 2. Background: OJ)P has made a concentrated effort during the lass. 24 months to increase the time that the ODP facilities are available to our customers. Needless to say, the quality of the utiliti=es that drive the computer centers greatly affects our ability to keep our systems operating. Unfortunately, the number of failures during the last two years suggest that there is a serious problem with the quality of this service. During this time frame, ODP has experienced 20 Failures due to utility outages. Ten of these failures have occurred since 31. March 1981. With each of these failures we have lost an average of four hours of processing. What is even more important, however, is that we have experienced a significant increase in the rate of equipment failure. A recent analysis ha shown that for two weeks following an unscheduled power outage, the rate of equipment failure is two to three times the normal rate. When you consider that we had 20 failures in two years, the ODP Approved For Release 2005/07/12 : CIA-RDP86-01019R000200030 gl5 s-y~ Approved 76r Release 2005/07/12 : CIA-RDP86-04&19R000200030006-5 computer centers have been operating in degraded mode at best Eor over one-third of the time because of power failures (20 x 2 weeks divided. by 108 weeks). We cannot expect our users to continue to tolerate such a situation. We must have more dependable power, and I earnestly request the Office of Logistics to design utility systems such that we experience no more than one failure per year. As an immediate measure, I must ask that all scheduled maintenance on ODP utilities be accomplished outside of the hours of 0700-2000, Monday-Friday to avoid the high risk of inadvertently disrupting essential service when maintenance is performed during the prime shift. Undoubtedly there will be resource issues raised by this request. We will be happy to work with you to resolve these issues and to obtain the necessary funds. Approved For Release 2005/07/12 : CIA-RDP86-01019R000200030006-5