Body:
Approved For Release 20004Q;8/10 : CIA-RDP86-01019R000200030021-8
nr'T 1977
ML 4 i ND1 4 FOR: Director of Data Processing.
Jawcs H. Mciaald
3irector of Logisti
SWJECT. Facilities Support for Proje
Memo dtd 23 Aug 77 to L/L fm 1)/01W,
subject: Summary of Space and Utility
Requirements (01W 1631-77## OL 7 3549)
1. Pursuant to your verbal presentation on 2 August
and the subsequent referenced meworandw , this aiemorand ,,
addresses the Office of Logistics' OL) sup{ :port for both
the interim and separate CA: S facilities. A 1 ea .quarter_
Building location has been assumed because of ttie rang
unknowns associated with other Government-owned 'Metropolitan
Washington area locations and the high cost of dupli.cati. -
the CAMS communication links already available here at
headquarters.
?47) b3' March 197
a. The availability of the physical site
wit ein G C47 is entirely controlled by OD1' and
is already envirounen.tally conditioned s-)ace.
Only minor mechanical modifications will be
required and adequate 60 ha electrical per can
be supplied frcaai the GJ16 60 z UPS sy*ste, .. The
required 415 Hz MPS power is to be supplied by
the 415 i Teledyne frequency converters ,)o ere
by the 60 Hz O DP UPS system. A backup 415 i s
motor generator set is also required. It soul
be noted that total power from the 60 Nz UPS system
is limited to 1,300 YA. (i.e., the total combination
b. It is estimated that $Jj7,79' is required
the i.s terii CA renovations assuming t at
led water and 41 six power are required for the
Approved For Release 2000/08/10 : CIA-RDP86-01019R00020003002
7 4SS;.
Approved For Release 2000/08/10 : CIA-RDP86-01019R000200030021,,-8
SUBJECT: Facilities Support for Project
CPU selected (see attachment A for cost estimate
details). These funds are required on or before
1 November 1977.
Se arate C.kyiS facility b y November 1)7:x:
a. Potential C:kN-,S sites within the ?eadquarters
Building are limited by the lack of available porker
to the northwest quadrant (1) Vault) only. A ma cimu~i
of 300 kV'A of electrical power is available f5r MI"Ming al owance for Project A ; user area support
wit lout further major electrical expansions. The
major variable in meeting your iNov-bor 1979 req
meat is the availability of additional now-lease
space outside of the Headquarters Building to vacate
the future CAMS site prior to construction. While
efforts within OL are directed to coazpletta$ constria;-
tion by 1 August 1:179, these efforts are constrained
by the GSA?Cspace acquisition cycle.
b. Approximately 9,000 sq. ft. of renovations
are required (6,500 sq. ft.. + 2,500 sq. ft* for
utilities including separate 60 11z and 413 nlz UPz3
systems) ost estimate for this
portion ailed on attache- ent A).
An initi MOMM. 00 is required early iai
FY 73 for the architect-engineer design. The
major construction funds of $1,336,000 will be
required in FY 79 (1 October 1978).
4.
look forward to working with you oa t`tis interestin .
Data
RECD/OL
ities sup
Project CA'iS.
T. r7cD-.,.r,44
..mod: Jam: James H. McDonald.
Distribution:
Orig. - Addressee, w/att 1 - D/L Chrono, w/att
1~- OL/RECD/i#EB Official, w/att 1 - OL Files, w/att
4 ? OL/RECD, w/att I ? OL/RECD/HEB Chrono, w/att
ST TINTL
Ap9W - 84'11O(4RA0120 021-8
rocessing effort. The Headquart rs Engiauering
will continue to be the focal point for facil-
25X1A