FACILITIES SUPPORT FOR PROJECT CAMS

Document Type: 
Collection: 
Document Number (FOIA) /ESDN (CREST): 
CIA-RDP86-01019R000200030021-8
Release Decision: 
RIPPUB
Original Classification: 
K
Document Page Count: 
3
Document Creation Date: 
November 17, 2016
Document Release Date: 
June 8, 2000
Sequence Number: 
21
Case Number: 
Publication Date: 
October 12, 1977
Content Type: 
MF
File: 
AttachmentSize
PDF icon CIA-RDP86-01019R000200030021-8.pdf189.85 KB
Body: 
Approved For Release 20004Q;8/10 : CIA-RDP86-01019R000200030021-8 nr'T 1977 ML 4 i ND1 4 FOR: Director of Data Processing. Jawcs H. Mciaald 3irector of Logisti SWJECT. Facilities Support for Proje Memo dtd 23 Aug 77 to L/L fm 1)/01W, subject: Summary of Space and Utility Requirements (01W 1631-77## OL 7 3549) 1. Pursuant to your verbal presentation on 2 August and the subsequent referenced meworandw , this aiemorand ,, addresses the Office of Logistics' OL) sup{ :port for both the interim and separate CA: S facilities. A 1 ea .quarter_ Building location has been assumed because of ttie rang unknowns associated with other Government-owned 'Metropolitan Washington area locations and the high cost of dupli.cati. - the CAMS communication links already available here at headquarters. ?47) b3' March 197 a. The availability of the physical site wit ein G C47 is entirely controlled by OD1' and is already envirounen.tally conditioned s-)ace. Only minor mechanical modifications will be required and adequate 60 ha electrical per can be supplied frcaai the GJ16 60 z UPS sy*ste, .. The required 415 Hz MPS power is to be supplied by the 415 i Teledyne frequency converters ,)o ere by the 60 Hz O DP UPS system. A backup 415 i s motor generator set is also required. It soul be noted that total power from the 60 Nz UPS system is limited to 1,300 YA. (i.e., the total combination b. It is estimated that $Jj7,79' is required the i.s terii CA renovations assuming t at led water and 41 six power are required for the Approved For Release 2000/08/10 : CIA-RDP86-01019R00020003002 7 4SS;. Approved For Release 2000/08/10 : CIA-RDP86-01019R000200030021,,-8 SUBJECT: Facilities Support for Project CPU selected (see attachment A for cost estimate details). These funds are required on or before 1 November 1977. Se arate C.kyiS facility b y November 1)7:x: a. Potential C:kN-,S sites within the ?eadquarters Building are limited by the lack of available porker to the northwest quadrant (1) Vault) only. A ma cimu~i of 300 kV'A of electrical power is available f5r MI"Ming al owance for Project A ; user area support wit lout further major electrical expansions. The major variable in meeting your iNov-bor 1979 req meat is the availability of additional now-lease space outside of the Headquarters Building to vacate the future CAMS site prior to construction. While efforts within OL are directed to coazpletta$ constria;- tion by 1 August 1:179, these efforts are constrained by the GSA?Cspace acquisition cycle. b. Approximately 9,000 sq. ft. of renovations are required (6,500 sq. ft.. + 2,500 sq. ft* for utilities including separate 60 11z and 413 nlz UPz3 systems) ost estimate for this portion ailed on attache- ent A). An initi MOMM. 00 is required early iai FY 73 for the architect-engineer design. The major construction funds of $1,336,000 will be required in FY 79 (1 October 1978). 4. look forward to working with you oa t`tis interestin . Data RECD/OL ities sup Project CA'iS. T. r7cD-.,.r,44 ..mod: Jam: James H. McDonald. Distribution: Orig. - Addressee, w/att 1 - D/L Chrono, w/att 1~- OL/RECD/i#EB Official, w/att 1 - OL Files, w/att 4 ? OL/RECD, w/att I ? OL/RECD/HEB Chrono, w/att ST TINTL Ap9W - 84'11O(4RA0120 021-8 rocessing effort. The Headquart rs Engiauering will continue to be the focal point for facil- 25X1A Approved For Release 2000/08/10 : CIA-RDP86-01019R000200030021-8 Approved For Release 2000/08/10 : CIA-RDP86-01019R000200030021-8