STATUS OF SAFE SITE CONSTRUCTION COSTS

Document Type: 
Collection: 
Document Number (FOIA) /ESDN (CREST): 
CIA-RDP86-01019R000200050022-5
Release Decision: 
RIPPUB
Original Classification: 
K
Document Page Count: 
7
Document Creation Date: 
December 16, 2016
Document Release Date: 
July 28, 2005
Sequence Number: 
22
Case Number: 
Publication Date: 
June 19, 1981
Content Type: 
MF
File: 
AttachmentSize
PDF icon CIA-RDP86-01019R000200050022-5.pdf307.92 KB
Body: 
Approved,Gor Release 2005/08/03 : CIA-RDP86-9i819R000200050022-5 9 JUNE 1981 MEMORANDUM FOR: Chief, Consolidated SAFE Project Office, ODP Chief, Real Estate and Construction Division, OL SUBJECT: Status of SAFE Site Construction Costs REFERENCE: Memo for CSPO fm C/RECD, dtd 10 June 81, subject: Additional Funding for Construction of Phase I, Project SAFE 1. The following is the second quarterly report on the expenditure of funds by the GSA for the SAFE Phase I site preparation work. The following data is based on the latest information received from GSA and on construction changes re- quired or projected to date. The prices on the change orders (c.o.) listed below are reasonably accurate, although GSA has 41 not completed final negotiations on all of them. a. GSA design management and contract bidding administration $ 56,900 b. GSA travel in connection with paragraph a. above $ 305 c. GSA printing costs for con- struction plans, specifications, and bidding documents 4,666 d. A&E cost for preparing plans and specifications $ 128,262 e. Construction Contract Award price. $ 980,000 f. GSA construction supervision $ 36,901 g. Change Orders c.o.1 Requirement for secur- rity mesh above partitions $ 4,000 0L 1 2546 Approved For Release 2005/08/03 : CIA-RDP86-01019R000200050022-5 Approved.For Release 2005/08/03 : CIA-RDP86019R000200050022-5 SUBJECT: Status of SAFE Site Construction Costs c.o.2 Route electrical riser from "D" Vault in stairwell instead of in existing electrical riser because of congestion in the present closets $ 2,180 c.o.3 Same as c.o. 2 above but for service from Vaults "A" and "C" and for some electrical changes in "A" Vault $ 9,054 c.o.4 Additional demolition not shown on the drawings includ- ing office walls in Battery Room area, sinks, fire hose cabinet, electrical closet and panels $ 12,494 c.o.S Change in acid drain in Battery Room c.o.6 Change in chilled water line routing due to conflict with "C" Vault construction c.o.7 Reduce quantity of acid drain including demolition and repairs - Credit c.o.8 Change in electrical riser from "B" Vault as was done in other risers c.o.9 The electrical in-floor ducts were found to be more exten- sive than shown on the drawings causing additional cost for re- moval and repair $ 2,855 Approved For Release 2005/08/03 : CIA-RDP86-01019R000200050022-5 Approved. or Release 2005/08/03 : CIA-RDP86-@ 819R000200050022-5 SUBJECT: Status of SAFU Site Construction Costs c.o. 10 Alter elevations of chilled water lines at 3 crossings to pass one line beneath the other V 3,444 c.o. 11 Change air conditioning supply and return ducts at the Escalator Room 3,028 c.o. 12 Install bus duct from "C" Vault to UPS including service for Phase II $ 89,360 c.o. 13 Accelerate completion of the UPS Battery Room to allow battery installation and prevent impact on battery contract .$ 5,000 c.o. 14 Revision to acoustical ceiling - Credit $ (1,280) c.o. 15 Raise plaster height from existing point to new ceiling height, approximately 6 inches in majority of Phase I area; install 30 amp service to allow UPS battery charging $ 3,092 c.o. 16 Raise existing electri- cal conduit passing through contract area $ 1,560 c.o. 17 Plaster around Phase I area windows. and columns to accommo- date new ceiling height $ 3,199 c.o. 18 Remove 400IIz power panels and relocate power panel CP-1 $ 778 Approved For Release 2005/08/03 : CIA-RDP86-01019R000200050022-5 Approved,lFor Release 2005/08/03 : CIA-RDP86-0 19R000200050022-5 SUBJECT: Status of SAFE Site Construction Costs c.o. 19 Revise E corridor ceiling height to allow chilled water line run $ 702 C.O. 20 Run temporary electri- cal service to AC-7 to allow operation prior to completion of "C" Vault work $ c.o. 21 Install paper backing on acoustical panels to be installed in the computer room to prevent potential flaking of fiberglass; reduce size of underfloor chilled water stubs for future from 3 inches to 2 inches - Credit $ (2,409) h. Reserve funds to reimburse the McLean Field Office for the expenses in- curred for construction support such as draining and filling chilled water system during contractor connection work $ 3,900 $1,364,366- 2. In addition to the expenditures above, there are the following additional changes pending. These changes are not yet numbered and the prices are estimates received from GSA. a. Change to have the contractor rather than Emerson install the UPS units in the UPS room; delete acid pit in the UPS battery room $ 5,000 b. Claim by contractor to accomplish repairs to underfloor duct $ 6,598 Approved For Release 2005/08/03 : C1A-46P86-01019R000200050022-5 ApprovedFor Release 2005/08/03 : CIA-RDP86=W019R000200050022-5 SUBJECT: Status of SAFE Site Construction Costs c. Install doginflow type air handling units in the UPS roori in lieu of upflow type as approved by the A-1,-', $ 15,000 d. Electrical modification required to install modular power units (P:PU) 24,000 e. Removal of existing power Panels CP-l throuw-h CP-10 not required due to MPU installation $ 8,000 6 f. Installation of a dust barrier between Phase I and Phase II under Phase I rather than Phase II construction; eliminate exhaust fan duct chase in Phase I area to recover raised floor space $ 11,000 g. Replace the raised floor stop in the Phase I area with a ramp 2,500 h. Seal the raised flooring sub- floor $ 3,000 i. Modify the tie-in of the new "A" and "B" Vault risers to preclude an outage to the CDP computer centers (ODP has agreed to fund this change) S 3,000 8, 9:i 3. - -Summary Funds transferred to GSA FY 77 108,200 1,027,000 Approved For Release 2005/08/03 : CIA-RDP86-01019R000200050022-5 Approved.tor Release 2005/08/03 : CIA-RDP86-00019R000200050022-5 SUBJECT: Status of SAFE Site Construction Costs FY 30 7,000 5,500 516,(00 (400,000) FY 31 155,000 Funds used or identified to be used by GS1! as of 27 February 31 1,364,366 7$,393 Contingency emaining-Deficit f3 , 4',,, 4. The following iteus nentioned, in the 19 March quarterly report as potential change orders have been deleted or found not being needed.: a. Construction of an areaway for the UPS battery room fans (4,000 - ~6,000) b. Increase depth of acid pit ($5,000) C. Explosion proofing work for the battery room ($10,000) d. Patch plaster at columns in battery room $2,000) 5. As you are aware, the referent nemorandun requested an additional $60,000 for five specific proposed charge orders to the Phase I project. Although the estimated project costs to date (including these five change orders) indicate a $23,464 deficit, the 60,000 is still required. GSA has in 3icated-? that the change orders in the reference are for chances to the scope of the project rather than true contin encies. There- Approved For Release 2005/08/03 : CIA-RDP86-01019R000200050022-5 $1,413,300 1,442,764 Approved.Ioor Release 2005/08/03 : CIA-RDP86-0#619R000200050022-5 SUBJECT: Status of-.SAFE Site Construction Costs fore, given the facts that the project is not yet conplete and the ongoing= nature of construction work will require additional changes combined with the shortage of remaining contingency funds, GSA has indicated that they will not apply remaining funds to any of the changes listed in reference 1. As indicated earlier, any funds remaining at the conclusion of Phase I will be applied to the Phase II contract. Additional architect-engineer funds will be required to redesign, parts of the Phase II area to accommodate new requirements. STAT 6. If further information is re 113-red an any of the, it listed in this report, please contact A quarterly report in this format wit continue to be so. -It you throughout the remainder of the Phase I project to assist you in tracking project costs. If I can be of assistance, please give me a call. STAT STAT Distribution: Orig - Adse 1 - OL/RECD/IiEB Official 1 - OL/RECD/HEB Chrono 1 - 0 OL/RECD/HE (18 June 1981) -Approved ForrRetewse,200W 8f03-:,.CtX-,RDP86'= Jri1 '19R 0020 t9'22=5-- _