STATUS OF SAFE SITE CONSTRUCTION COSTS

Document Type: 
Collection: 
Document Number (FOIA) /ESDN (CREST): 
CIA-RDP86-01019R000200050027-0
Release Decision: 
RIPPUB
Original Classification: 
K
Document Page Count: 
5
Document Creation Date: 
December 16, 2016
Document Release Date: 
July 28, 2005
Sequence Number: 
27
Case Number: 
Publication Date: 
March 18, 1981
Content Type: 
MF
File: 
AttachmentSize
PDF icon CIA-RDP86-01019R000200050027-0.pdf206.03 KB
Body: 
Approved pr Release 2005/08/03 : CIA-RDP86-0 19R000200050027-0 19 M1k 1981 MEMORANDUM FOR: Chief, Consolidated SAFE Project Office, ODP FROM: Chief, Real Estate and Construction Division, OL SUBJECT: Statu6s of SAFE Site Construction Costs 1. lie ardin telephone conversations among Messrs. I and the undersigned, the -o owing is a review of how the General Services Admin- istration (GSA) has used the funds provided for the site preparation work for Project SAFE. bidding a.dnilriistration $ 56,900 b. GSA travel in connection with paragraph a. above $ 305 c. GSA printing costs for construction plans, specifications, and bidding documents - $ 4,666 d. AYB cost for preparing plans and specifications $ 128,262 e. Construction Contract Award price a. GSA design management and contract 980,000 36,701 c.o.1 Requirement for security mesh above partitions $ 4,000 c.o.2 Route electrical riser from "D" Vault in stairwell instead of in existing electrical riser because of congestion in the present closets $ 3,297 f, GSA construction supervision g. Change Orders OL 1 1018 r, Approved For Release 2005/08/03 : CIA-RDP86-01019R000200050027-0 Approvedgr Release 2005/08/03 : CIA-RDP86-019R000200050027-0 SUBJECT: Status of SAFE Construction Costs c.o.3 Same as c.o. 2 above but for service from Vaults "A" and "C" and for some electrical changes in "A" Vault $ 9,054 c.o,4 Additional demolition not shown on the drawings including office walls in Battery Room area, sinks, fire hose cabinet, electrical closet and panels $ 12,494 c.o.5 Change in acid drain in Battery Room $ 2,600 c.o.6 Change in chilled water line routing due to conflict with "C" Vault construction $ 14,116 c.0.7 Reduce quantity of acid drain including demolition and repairs - Credit $ (1,694) c.o.8 Change in electrical. riser from "B" Vault as was done in other risers $ 3,852 c.o.9 The electrical in-floor ducts were found to be more extensive than shown on the drawings causing additional cost for removal and repair $ 2,855 c.o.10 Alter elevations of chilled water lines at 3 crossings to pass one line beneath the other $ 4,059 c.o. 11 Change air conditioning supply and return ducts at the Escalator Room $ 1,046 f ? Approved For Release 2005/08/03 : CIA-RDP86-01019R000200050027-0 Approved-Epr Release 2005/08/03 : CIA-RDP86-0I9R000200050027-0 SUBJECT: Status of SAFE Construction Costs h. Reserve funds to reimburse the McLean Field Office for the expenses in- curred for construction support such as draining and filling chilled water system during contractor connection work 3 900 $T2 i' f- ,-413- 2. In addition to the expenditures above, there are the following additional changes pending. These changes are not yet numbered and the prices are not firm. a. Revision to accoustical ceiling for a credit $ (2,000) b. Raise plaster height from exist- ing point to new coiling height, approx. 6 inches in majority of Phase I area $ 5, 000 c. Patch plaster at columns in Battery Room $ 2,000 d. Increase depth of acid pit $ S,000 e. Raise existing electrical conduit passing through contract area $ 1,650 f. Claim by contractor to accomplish repairs to underfloor duct $ 10,000 g. Changes to explosion proofing the Battery Room $ 10'C00 h. Bring UPS into UPS Room $ 5,000 i. Install bus duct from "C" Vault to UPS including service for Phase II $ 100,000 J. Lower ceiling in E corridor to aeconmodate piping needs $ 3 000 r 650 Approved For Release 2005/08/03 : CIA-RDP86-01019R000200050027-0 Approved,Lpr Release 2005/08/03 : CIA-RDP86-019R000200050027-0 SUBJECT: Status of SAFE Construction Costs 3. Summary Funds transferred to GSA FY77 101,200 1,02 ,000 FY80 7,000 5,500 516,600 (400,000). FY81 I55`004 $1,419,300 Funds used or identified to be used by GSA as of 27 February 1981 1,266,413 139j 650 $1 406 063 Contingency Remaining 4. The ongoing nature of construction work will be that additional.changes will be needed and that the cost of estimated changes may vary. As examples of this, the following is forecast from GSA for your information* a. The actual change order cost for the bus duct work has been negotiated down from $100,000 to approximately $89,000. b. The explosion proofing work for the Battery Room has been reexamined and redesigned. The final cost for this work is now expected to drop from $10,000 down to the $2,000 - $3,000 range. c. The need to increase the depth of the acid drain pit now appears to be unnecessary and may not become a change. -4- Approved For Release 2005/08/03 : CIA-RDP86-01019R000200050027-0 Approved,r Release 2005/08/03 : CIA-RDP86-019R000200050027-0 SUBJECT: Status of SAFE Construction Costs d. An areaway shown on the drawings to be existing does not in fact exist. To construct the areaway is estimated to be in the $4000 - $6,000 range. e. A temporary wall may be required around the air handler that is installed to serve Phase II on a temporary basis to reduce the impact-of Phase II construction on an operational Phase I area, S. I hope that this information will be helpful to you in tracking the site preparation increment of Project SAFE. If you desire, I can provide you with an updated accounting on a quarterly basis for the remainder of the site preparation work for Phase I and for Phase II. The update would be in essentially the sane format as this ne,noraaiadu -. Should you need further information, please advise. Distribution: Orig - Adse I - 0L/RECD/13EB Official 1 - OL/RECD/HEB Chrono 1 - OL, Reader OL/RECD/1 _Sm. (16 March 81) r' Approved For Release 2005/08/03 : CIA-RDP86-01019R000200050027-0