SAFE/ADSTAR MEETING WITH GENERAL SERVICES ADMINISTRATION (GSA)

Document Type: 
Collection: 
Document Number (FOIA) /ESDN (CREST): 
CIA-RDP86-01019R000200050045-0
Release Decision: 
RIPPUB
Original Classification: 
K
Document Page Count: 
2
Document Creation Date: 
December 9, 2016
Document Release Date: 
June 8, 2000
Sequence Number: 
45
Case Number: 
Publication Date: 
November 16, 1978
Content Type: 
MFR
File: 
AttachmentSize
PDF icon CIA-RDP86-01019R000200050045-0.pdf83.84 KB
Body: 
Approved For Release 2000/09/14: CIA-RDP86-01019R000200050045-0 NOV 1?3 ShTATINTL I StATINTL MEMORANDUM FOR THE RECORD SUBJECT: SAFE/ADSTAR Meeting with General Services Administration (GSA) 1. On 8 November 1978 a meeting was held at GSA to discuss the SAFE and ADSTAR Projects. Attendees were: ank Miles - GSA technical questions as follows; a.. What is precise division between SAFE I an SAFE II? The purpose of the meeting was to discuss the status of the SAFE design and to present information upon which the firm of could submit a proposal to GSA for design of the ADS' AR facility. 2. In regards to SAFE, the A-f had a list of minor b. What is status of telephone closets in the entire SAFE area? c. Which wire closets are to have new power risers? d. What is exact division between the UPS and battery room? e. What is the requirement for a computer control console? f. What is the makeup of each power panel? Approved For Release 2000/09/14: CIA-RDP86-01019R000200050045-0 Approved For Release.2000/09/14: CIA-RDP86-01019R000200050045-0 SUBJECT: SAFE/ADSTAR Meeting with General Services Administration (GSA) g. Does the Agency prefer a wet or dry pipe sprinkler system? S ATINTL stated that based upon the A-8's inter- mediate submission, which is due 30 November 1978, GSA will make a determination as to the total project cost including GSA fees. He expressed some concern that design for a phased construction sequence might cost more than for just one straight project. Answers to those questions noted above will be formu- fated after consultation with SAFE project personnel. 3. The ADSTAR project was discussed. The A-E was given drawin s of the GE0424 and IH112S areas. and the STATINTL A?E will be at Headquarters on 13 November to survey the area. S ATINTL instructed the A-B to have his proposal ready by 1 Novem er 1978 The A-E requested additional copies of the drawings. A request will be made to ADSTAR personnel for ad- ditional layout drawings. STATINTL Distribution: Orig OL/RECD/HEB Official iX - OL/RECD 1 ? OL/RECD/HEB Chrono ATINTL OL/RECD/HEB,, .'mj/7543 (15 Nov 78) Approved For Release 2000/09/14: CIA-RDP86-01019R000200050045-0