SAFE/ADSTAR MEETING WITH GENERAL SERVICES ADMINISTRATION (GSA)
Document Type:
Collection:
Document Number (FOIA) /ESDN (CREST):
CIA-RDP86-01019R000200050045-0
Release Decision:
RIPPUB
Original Classification:
K
Document Page Count:
2
Document Creation Date:
December 9, 2016
Document Release Date:
June 8, 2000
Sequence Number:
45
Case Number:
Publication Date:
November 16, 1978
Content Type:
MFR
File:
Attachment | Size |
---|---|
![]() | 83.84 KB |
Body:
Approved For Release 2000/09/14: CIA-RDP86-01019R000200050045-0
NOV 1?3
ShTATINTL
I
StATINTL
MEMORANDUM FOR THE RECORD
SUBJECT: SAFE/ADSTAR Meeting with General Services
Administration (GSA)
1. On 8 November 1978 a meeting was held at GSA to discuss
the SAFE and ADSTAR Projects. Attendees were:
ank Miles - GSA
technical questions as follows;
a.. What is precise division between SAFE I an
SAFE II?
The purpose of the meeting was to discuss the status
of the SAFE design and to present information upon which the
firm of could submit a proposal to
GSA for design of the ADS' AR facility.
2. In regards to SAFE, the A-f had a list of minor
b. What is status of telephone closets in the
entire SAFE area?
c. Which wire closets are to have new power risers?
d. What is exact division between the UPS and
battery room?
e. What is the requirement for a computer
control console?
f. What is the makeup of each power panel?
Approved For Release 2000/09/14: CIA-RDP86-01019R000200050045-0
Approved For Release.2000/09/14: CIA-RDP86-01019R000200050045-0
SUBJECT: SAFE/ADSTAR Meeting with General Services
Administration (GSA)
g. Does the Agency prefer a wet or dry pipe
sprinkler system?
S ATINTL stated that based upon the A-8's inter-
mediate submission, which is due 30 November 1978, GSA will
make a determination as to the total project cost including
GSA fees. He expressed some concern that design for a phased
construction sequence might cost more than for just one straight
project. Answers to those questions noted above will be formu-
fated after consultation with SAFE project personnel.
3. The ADSTAR project was discussed. The A-E was given
drawin s of the GE0424 and IH112S areas. and the STATINTL
A?E will be at Headquarters on 13 November to survey the area.
S ATINTL instructed the A-B to have his proposal ready by
1 Novem er 1978 The A-E requested additional copies of the
drawings. A request will be made to ADSTAR personnel for ad-
ditional layout drawings.
STATINTL
Distribution:
Orig OL/RECD/HEB Official
iX - OL/RECD
1 ? OL/RECD/HEB Chrono
ATINTL OL/RECD/HEB,, .'mj/7543 (15 Nov 78)