NOTICE: In the event of a lapse in funding of the Federal government after 14 March 2025, CIA will be unable to process any public request submissions until the government re-opens.

PROJECT SAFE COORDINATION MEETING

Document Type: 
Collection: 
Document Number (FOIA) /ESDN (CREST): 
CIA-RDP86-01019R000200050056-8
Release Decision: 
RIPPUB
Original Classification: 
K
Document Page Count: 
4
Document Creation Date: 
December 9, 2016
Document Release Date: 
June 8, 2000
Sequence Number: 
56
Case Number: 
Publication Date: 
July 21, 1978
Content Type: 
MFR
File: 
AttachmentSize
PDF icon CIA-RDP86-01019R000200050056-8.pdf223.28 KB
Body: 
Approved For Release 2Q(9/09/14 : CIA-RDP86-01019R000200Q Q056-8 2 1 JUL 1978 SUBJECT: Project SAFE Coordination Meeting 1. On 18 July 1978, a meeting was held with - SPS/ODP, to discuss a possible two-phase construction sequence for the SAFE Computer Center. Phase I of construc- tion is to provide 3,700 square feet of UPS space and approx- imately 8,800 square feet of computer space. 2. Since the UPS space is fixed in the Gil-'0424 area, it would be most desirable to locate the first 8,100 square feet of computer space in the area immediately adjacent to the UPS space. This will allow the major utility lines (power and chilled water) to be run directly to the computer area without traversing space occupied by another component and disru sing their activities. In addition to the 3,700 square feet in GE0424 now occupied by DDA/ODD/PEAS, Phase I construction would require obtaining the following space: a. GL0438 - 965 square feet, DCI/IC/OPEI b. GE0440 - 640 square feet, NFAC/OWI c. Gf0444 - 1,123 square feet, NFAC/OGCR U. GE40 - 497 square feet, DDA/OS C. GESO - 600 square feet, NFAC/OCR f. G1i58 - 4,598 square feet, DDO STATINTL g. G130425 - 1,000 square feet, NFAC/OCR TOTAL 9,428 square feet 3. Although the 9,428 square feet is 628 square feet more than the 8,800 square feet required by ODP, it fits nicely into existing office boundaries. Anotlv.er option would be to obtain approximately the 8,800 square feet figure by allowing DDO, to keep 1,000 square feet in this area, or as another option, move DDO, out and use they 1,000 square STATINTL Approved For Release 2000/09/14: CIA-RDP86-01019R000200050056-8 Approved For Release 2(10 /09/14: CIA-RDP86-01019R00020005Q.0-56-8 SUBJECT: Project SAFE Coordination Meeting feet as turn around space until Phase II is required. This latter option appears more practical since it is felt that DDO/ISS cannot go from 4,598 square feet to 1,000 square feet and carry on a meaningful level of operation. 4. Phase II construction would require the remainder of the space in the GE corridor area and is currently occu- pied by DDO/ISS and NFAC/OCR components. S. OUP feels that a July 1980 beneficial occupancy date (ROD) for Phase I is required. A ROD for Phase II would be June 1932 This type of schedule means that GSA should be alerted to have the SAFE A-E prepare documents for two sepa- rate SAFE construction projects and that the design should provide for a smooth transition from Phase I to Phase II without disrupting computer operations. In a related Matter, since DOD for ADSTAR is now scheduled for August 1979 and since ADSTAR utilities are dependent upon the SAFE desi ;n, we are now looking at three construction projects in the following order: a. ADSTAR . August 1979 b. SAFE Phase I - July 1980 c. SAFE Phase II - June 1982 6. Additional questions were raised by regarding the halon sprinkler and water detection systems. At this time, the design is incomplete for these systems and we will withhold our coixiients until the A?E presents his updated design proposals. 7. The following summarizes the discussion of 18 July a. SAFE will probably require a two phase construction approach. b. Phase I ROD July 1980 c. Phase II BOD June 1982 d. Phase I would have two options: (1) Option A - Take 9,428 square feet (2) Option B - Take 8,428 square feet and return excess 1,000 square feet to DIJO/ISS Approved For Release 2000/09/14: CIA-RD P86-01019R000200050056-8 Approved For Release 2000/09/14: CIA-RDP86-01019R00020005Q056-8 SUBJECT: Project SAFE Coordination Meeting or use it as turn around space. e. The ir:tpact of AvSTAR (August 197:J) nears we must have ti SA provide for three separate con- struction projects (ADSiAIR, SAFE Phase 1, and SAFE Phase II). ' 3. In order that the construction deadline for ADS'TA R may be met and that the A-E can Intelligently proceed wit s his design, a decision must be made by 15 August 1978 as to which option the Agency wis, Chief, Electrical Secti Headquarters Engineering Brancli. RE cc: CLADS/LSD/OL SPS/ODP Distribution: Orig. - OLf RECi/f-HI,;j Official X - OL/RECD I - OL/ tECD/1-IL Chrono 1 - OL Reader OL/R iCD/IHEB ms/7543 (21 Jul 7 Approved For Release 2000/09/14: CIA-RDP86-01019R000200050056-8 3 ^ SECRET ROUTING AND RECORD SHEET SUBJECT: (Optional) FROM: EXTENSION NO. DATE 71761,78 TO: (Officer designation, room number, and building) DATE - OFFICER'S COMMENTS (Number each comment to show from whop RECEIVED _ FORWARDED INITIALS to whom. Draw a line across column after each comment. 2. G S~i 3. 4. 5. ILUC~ i7_ Fedt4-'nO8 -1wt U06 d. ~ ~ `~- c ~+ c fill 14E K 7 J 8. X CP4 9. AT LPA 1l- MMfZLi ES3- _ T49--T tU CANMD 1 o. & I Se__ c~ . S'A -~We A*e -e &V uHt TO rgy T 12 13. I ! - 14 . 15 Approved For Release 2000/09/ 4 : CIA- DP86-0 019R000 00050056-8 FORM 3-C2 USE vcEYIOUS INTERNAL 610 EDITIONS ^ SECRET ^ CONFIDENTIAL ^ USE ONLY ^^ UNCLASSIFIED ved i-or1I eTease rKNAL 0 N~114-RDP86-010198000 DENTIAL