IMPACT OF PROJECT SAFE ON TELEPHONE FACILITIES

Document Type: 
Collection: 
Document Number (FOIA) /ESDN (CREST): 
CIA-RDP86-01019R000200050084-7
Release Decision: 
RIPPUB
Original Classification: 
U
Document Page Count: 
2
Document Creation Date: 
December 9, 2016
Document Release Date: 
June 8, 2000
Sequence Number: 
84
Case Number: 
Publication Date: 
May 12, 1977
Content Type: 
MF
File: 
AttachmentSize
PDF icon CIA-RDP86-01019R000200050084-7.pdf80.33 KB
Body: 
Approved For Releasa?U& :-C8 00200050084-7 OCD-M77 -/4 Y 12 ;W4"1977 STATINTL MEMORANDUM FOR: Chief, Real Estate and Construction Division, OL SUBJECT Impact of Project SAFE on Telephone Facilities STATINTL REFERENCE Memorandum from C/RE&CD/OL dated 24 April 1977, same subject STATINTL 1. A meeting was held on 9 May 1977 with Chesapeake STATINTL and Potomac Telephone Com an ersonnel, OC/-TFB and Mr. of your sta to discuss STATINTL referenced memorandu . STATINTL ! 2. pointed out that a firm decision had not been ma e as w ether the Point Area will be located in the north or the south end of the Computer Center. closet via the underfloor duct system. For each telephone expansion joint will be served from the GE0436 satellite I ; 3. If the Point Area is located on the south end of the Computer Center, the GE50, GE66 and GE78 satellite closets R'I may be removed. The Point Area is bisected by an expansion joint and as a result, the telephones located south of the ;Z'rl; located north of the expansion joint and in the Computer Center a one-inch conduit will be required from the GE0436 closet to the telephone location. 4. Should the Point Area be located on the north end of the Computer Center, the GE0436, GE50 and GE66 satellite closets may be removed and two three-inch conduits, with one 90? bend, will be required between the GE63 main closet and STATINTL the GE78 satellite closet. advised that if this area is selected a monolithic pour will be required. Consequently, it will be necessary to install one-inch conduits from the GE78 closet to each telephone located in both the Point Area and the Computer Center. 5. In room GE50, adjacent to the satellite closet, there is a C&P manhole which should remain accessible to C&P personnel. Approved For Release 2 0/OR/ 4 ?:CIA-R l 86-q10 Q200050084-7 Approved For Relea MOAT CIA6-0101'000200050084-7 SUBJECT: Impact of Project SAFE on Telephone Facilities 6. C$P Cable Department personnel will require a two- month lead time to accomplish their work. 7. It is suggested that, prior to installing any conduit for black line telephones in the Computer Center, approval be obtained from the Information Systems Security Group, OS. 8. Telephone service for UPS and ADSTAR will be served from the GE0422 satellite closet via the underfloor duct system. 9. If an additional information is required please STATINTL contact on extension 5656. STATINTL Approved For Release 2000/09/14: CI -RDP86-01019R000200050084-7 f in sfraflve - 1rifer al '` n0"