PROJECT SAFE RELATED EXPENDITURES

Document Type: 
Collection: 
Document Number (FOIA) /ESDN (CREST): 
CIA-RDP86-01019R000200060025-1
Release Decision: 
RIPPUB
Original Classification: 
K
Document Page Count: 
7
Document Creation Date: 
December 12, 2016
Document Release Date: 
May 6, 2002
Sequence Number: 
25
Case Number: 
Publication Date: 
February 11, 1977
Content Type: 
MF
File: 
AttachmentSize
PDF icon CIA-RDP86-01019R000200060025-1.pdf467.38 KB
Body: 
Approved For Release 2002/09/05 : CIA-RDP86-01019R00N00060025-1 11 FEE, ?)77 . 4 FOR: Director of Logistics STATI NTL OL Project SAFE Coordinator VIA Chief, Headquarters Engineering branch, RECD/OL VIA Chief, Real Estate and Construction Division OL SUBJECT Project SAFE Related Expenditures REFERENCE Memo dtd 7 Feb 77 to OIL fm 01 Project SAFE Coordinator, Subj: Project SAFE - Cash Flow for FY..77 and FY48 COL 7 0567) 1. Pursuant to your request, the attached cash flow analysis covers those SAFE related projects specifically excluded in the referent memo- randum: a. Electrical C Vault Expansion. b. Acquisition of New Space Outside the Headeuarters Building. c. Secondary Non-SAFE Headquarters Move Sequences. d. Renovations of SAFE User Areas, 2. These four project areas are addressed separately because they are either funded by existing FY-77 OL budgeted funds, or they are unfunded to the extent that the funding source has not yet been identified. Refer- ring to the cash now sheet, the obligations by month are based on schedules necessary to meet the 1 July 1978 completion date. The modifications to SAFE user's areas are required in the FY-79 through FY-81 timefraan as the system expands. The alphabetical annotations on the cash flow correspond to explanations in the following paragraphs. 3. lectil ut ao- Increase of 3000 kVA of electrical distribut on mac o prov e a maximum 2400 kVA of electrical oower for Project SAFE. This is maximum capacity that can be added and supported by existing electrical feeders. This power limit must support the Project SAFE center including both 60 and 415 Hz Uninterruptible Power Supply (UPS) OL 7 0700 Approved For Release 2002/09/05 : CIA-RDP86-01019R000200060025-1 Approved For Release 2002/09/05 : CIA-RDP86-01019R001)200060025-1 SUBJECT; Project SAFE Related Expenditures systems and the addition of SAFE terminal user equipment in the northeast quadrant of the Headquarters Building northwest users will be supported eet of D Vault). 114111; s tio electrica cit remains In e1tPer Core ts for thiF Annot. a. Award of Agency contract estimated $1 for Architect-Engineer (A&E) design servicesthe of Kenneth Cobb (electrical engineers). Any other alternative Is either more costly or requires up to 3 to 4 months addi. tional time to complete. helot. b. Work authorization to GSA for $685,000, the construction project for the C Vault expansion. These dates correspond to the following sequence: (1) 1 Mar 77 - Award of ME contract. (2) 15 Apr 77 . Design complete (3) 1 May 77 . Completion of SSA review, ng 90 days for solicitation, advertisement, sward of construction contract. (4) 1 Aug 17 - Start of construction. (5) 1 Aug 78 - Completion of electrical expansion. 4. FE S d ti Annot. e. Work authorization to SSA for $210,000 for group forces renovation of areas involved in the move sequence necessary to provide 20,000 sq. ft. of space in the selected site. Sisdlar move sequences typically require 150 percent of secondary renovations or 30,000 sq ft. of additional renovatio s, estimated at $7 per sq. ft. It is assumed that Project GEMINI funds will also be used to supplement the relocation of 81400e sq. ft. to the newly-acquired building and readjustments within the Headquarters Building. Design of these secondary Headquarters renovations to be accomplished by the Architectural Design Staff, LSD/01.. No detail work can begin until the SAFE site is ;elected and those Agency components or functions required to leave the Headquarters Building are identified. In order to provide 6 months for Project SAFE construction (100000 sq. ft.), approximately 13.000 sq. ft. (including UPS systems) should be vacant by 1 January 1978. 2 Approved For Release 2002/09/05 : CIA-RDP86-01019R000200060025-1 S1IATINTL Approved For Release 2002/09/05 : CIA-RDP86-01019R00Q200060025-1 SUBJECT; Project SAFE Related Expenditures The only planned move at this time is the relocation of th. Intelligence Community Staff (ICS) 15.000 to 18.000 sq. ft. to the Community Headquarters Building on or about 15 March 1977. Acutst 19fl of aim Ulm. Outside of Headquarters Build.' to le space withfn the liesdquarters Bufidfng for S rt other Agency requirements, an additional 88?00o be limed through GSR. The It4Se of a possible move to and consolidation of that Amin, c und nee been slim. by the declination of thel to lease this space. *fitly, new leased buildinibs are Doing considered. Annot. c. Funding available ($500.000) for the Office of Ccmaaunlcetlons to purchase the necessary communication equipment for art entirely new building. Annot. d. Funding available ($516.000) for renovations by the lessor, which are above standard, to modify the acquired space for Agency usage (estimated at V per sq. ft. for .000 sq. ft.). The Agency design is to be accomplished by the Staff Architects, 0-C/RECD/01. The following is the sequence of events in the acquisition and preparation of new space through *SA and was prepared by the Real Estate Branch, RECO/OL. STATI NTL A. Market survey Completed Advertising - This is to find out what lessors would be Interested. 1 week Response 2 weeks Solicitation - Request for Bids 'I week Response Negotiation/Approve /Award* 1) Initial negotiations - 21 days. Negotiation between GSA and lessors on their submitted bids. 2 weeks 60 days Ad to run 9 Feb 21 Feb - 4 Mar 7 11 Mar 14 - 25 Mar 28 Mar - 27 May 3 Approved For Release 2002/09/05 : CIA-RDP86-01019R000200060025-1 Approved For Release 2002/09/05 : CIA-RDP86-01019R000200060025-1 SUBJECT: Project SAFE Related Expenditures F. F nal bids - 14 days After the initial nega- tion, SSA will then give the lessors a period to submit their finel/ adjnsted bids. 3) Approval/award - 25 days takes final bids, reviews then and makes recommendation to requesting Agency. Agency Would than review GSA's recommendatioe. After Agency and OSA have weed then a contract will be awarded. 1) If the lease is subject to prospectus, an additional 120 days would be required. 2) If any delays occur in any of the above steps, then tht following steps would be delayed accordingly. Agency desirp Lessor A&E Drawings Construction/Renovation H. Occupancy 60 days 45 dais 90 days 1 Jun 31 Jul 1 Also Sep 15 Sep Dec 6. Analyzing the following milestones necessary to ieet the vacsncy of the 044,MUO of 1 3O sq. ft. rsqtilred for the start of SAFE construction (including UPS sites by 1 January 1978, points out several problem areas: a. 1 Apr 77: Completion of relocation of ICS 15 000 to 10,000 sq. ft. out of Heade:meters Building. b. 15 Dec 77: Availability of new 88,000 sq. ft. for Agency occupancy. c. 1 Jan 78: Start of constructIon in required SAFE location. The move sequences throughout the Headquarters Suildinn required solidase the 151,00n to 18,000 sq. ft. vacated ICS area and the fict 4 Approved For Release 2002/09/05 : CIA-RDP86-01019R000200060025-1 STATI NTL ATINTL Approved For Release 2002/09/05 : CIA-RDP86-01019R001)200060025-1 SUBJECT: Project SAFE Related Expenditures. sq. ft. vacated to the new building wlU be complex and time consuming. The SAFE site has not yet been selected and neither have those components who will be relocated to a new building been identified. While 9 months remain after the 15.010 to 18,000 sq. ft. ICS space is vacated, teis *Pace In itself does not provide the relief for SAFE because it will probably be backfilled by the Office of Legal Counsel from Gae14 and the Inspector General's office from 2E-45/49 and others. Ho major moves are possible then until the IS December 1977 date. The candidate major move of the Office of Developeeet and Engineering elements (40,001 sq. ft.) is then possible but does not directly vacate any of the SAFE candidate sites on the ground or first floors. Without relief from an early availability of new space or the doubtful use of short-term, two-step moves W. in the absence of detailed planning today, it is improbable that the many second- ary move sequences necessary to reconsolidate 100,000 sq. ft. VW be planned, designed, end renovated in the available time. Such inter- Directorate move sequences and resultant haggling are difficult at best without involving movement out of the Headquarters Building. 7. Megifisittjent 0 SAFE User Areas - These modifications are the necessary renoVations to Headquarters Building and other Agency facilities within the Washington Metropolitan area to support thel ISAFE analyst terminal equipments for which funding has not yet been identified. Annot. f. The $450,000 ($150.000 in FY-79, -e0, -81) required is speculative in exact amount, however, such renovations will be required. Ongoing SAFE systems enei- neering will identify user area computer terminal console design, peripheral equipment, need for secure telephones, special purpose vaulting requirements, need for security and fire alarms, determine number of dedicated electrical power circuits, etc. Many secondary minor move sequences and additional space may be necessary to group SAFE user analysts within their respective components. Each of these considerations will affect the cost of the renovations. The suggested 3-year funding cycle covers the period that the SAFE system will be expanding to accommodate its users. In %winery, omitting that specific funding must be identified projects, several key major decisions must be made as follows: a. Identification of those components to be relocated from the Headquarters Building by 1 April 1977 to permit detailed planning for secondary moves and the layout of the new building (in conjunction with renovation and back- filling of ICS space). Approved For Release 2002/09/05 : CIA-RDP86-01019R000200060025-1 Approved For Release 2002/Q9/05 : CIA-RDP86-01019R000200060025-1 SUBJECT: Project SAFE Related Expenditures b. Selection of the SAFE computer center site by 1 March 1977 to permit GSA to initiate the design effort (based on their choice of an in-house design option). c. Award of the C Vault expansion AU design contract by 1 March 1977 necessary to meet the 1 August 1973 delayed completion date even on an accelerated basis. Att. Distribution: Orig. - Addressee, w/att. 1,- OL/RECD/HEB Official, w/att. OL/RECD, Watt. 1 - OL/RECD/R&FD? Watt. 1 - OL Files, w/att. OL/RECD/HEB) :sbt/ (11 Feb 77) 6 Approved For Release 2002/09/05 : CIA-RDP86-01019R000200060025-1 STATI NTL STATI NTL STAT Approved For Release 2002/09/05 : CIA-RDP86-01019R000200060025-1 Next 1 Page(s) In Document Exempt Approved For Release 2002/09/05 : CIA-RDP86-01019R000200060025-1