LOGISTICS SERVICES DIVISION WEEKLY REPORT PERIOD ENDING 7 SEPTEMBER 1983

Document Type: 
Collection: 
Document Number (FOIA) /ESDN (CREST): 
CIA-RDP87-00352R000100090041-4
Release Decision: 
RIPPUB
Original Classification: 
C
Document Page Count: 
2
Document Creation Date: 
December 22, 2016
Document Release Date: 
August 13, 2009
Sequence Number: 
41
Case Number: 
Publication Date: 
September 7, 1983
Content Type: 
REPORT
File: 
AttachmentSize
PDF icon CIA-RDP87-00352R000100090041-4.pdf83.44 KB
Body: 
Approved For Release 2009/08/14 :CIA-RDP87-003528000100090041-4 CO~f IDENTI~C LOGISTICS SERVICES DIVISION WEEKLY REPORT PERIOD ENDING 7 SEPTEMBER 1983 I. Progress Report on Tasks Assigned by the DCI/DDCI: 25X1 No items this reporting period. II. Items/Events of Major Interest: b. Transportation: Transportation is being provided to the Chief, Near East ivision on weekends and after hours for a group 25X1 of students in the Laurel, Maryland, area. c. Renovations at Head uarters Buildin With regard to the HSTS expansion in Room GD45, t e masonry work has been completed, and the carpenters have installed the double doors and dead bolts so that the integrity of the vault will remain intact. The car- penter shop started removing the internal VTR walls on 6 September and will begin to install the dust barrier during this portion of the renovation. The plumbers are still installing the chilled water line in the hallway outside Rooms 3G13/19, Office of Global Issues. The carpenters started the office renovation last week, and the electricians are scheduled to start their work on 7 September. New Spectrum Electric, Inc., the GSA contractor started the masonry portion of the thirteenth electrical closet located 25X1 in Room 1B4004 on 6 September 1983. 25X1 25X1 d. Executive Furniture Handbook: Photographs and data for inclusion in a handboo o executive furniture were turned over to the Design and Presentations Center, P~,PD/OL, on 1 September. Included are color pictures plus guidelines, descriptions, and pieces which have all been entered into ICS. e. Exhibit Hall: The Library of Congress exhibit "Artists for Victory" was removed on 1 September. A photographic essay of Latin America in conjuration with the EEO Hispanic Heritage Program is being posted on 7 September. ~~~~~~G~~T~~~ Approved For Release 2009/08/14 :CIA-RDP87-003528000100090041-4 Approved For Release 2009/08/14 :CIA-RDP87-003528000100090041-4 GDN~IDENTi~Iw 25X1 f. ~ Building Upgrading Project: New carpet, lounge furniture, anc~ rece tion furni re are in place 25X1 on the first floor of the Building. g. Systems Furniture: On 3 September employees of the Office of Central Re erence, DDI, assembled spare systems furniture com- ponents into six study stations for use by DDI analysts on the Headquarters Library mezzanine. On 6 September new acoustic panels were added to existing pieces in the Language Loft, South Cafeteria, Headquarters, by 25X1 a private contractor in order to enclose an additional classroom. 25X1 25X1 h. Drawings Completed: Construction drawings were completed for Room~~03 Headquarters Building, Central Cover Staff, DDO, and were issued to the Space D7aintenance and Facilities Branch (SM~FB), LSD/OL, on 6 September 1983. Working drawings for Rooms GD5308 and 5314 Headquarters Building, Office of Data Processing, DDA, were completed and issued to SM~FB, on 2 September 1983. III. Significant Event Anticipated During the Coming Week: No items this reporting period. Chief Logistics Services Division ~~'~irl~`~tt~ 1 ~ Approved For Release 2009/08/14 :CIA-RDP87-003528000100090041-4