LOGISTICS SERVICES DIVISION WEEKLY REPORT PERIOD ENDING 5 OCTOBER 1983

Document Type: 
Collection: 
Document Number (FOIA) /ESDN (CREST): 
CIA-RDP87-00352R000100100031-3
Release Decision: 
RIPPUB
Original Classification: 
K
Document Page Count: 
3
Document Creation Date: 
December 22, 2016
Document Release Date: 
August 6, 2009
Sequence Number: 
31
Case Number: 
Publication Date: 
October 5, 1983
Content Type: 
REPORT
File: 
AttachmentSize
PDF icon CIA-RDP87-00352R000100100031-3.pdf135.82 KB
Body: 
STAT Approved For Release 2009/08/06: CIA-RDP87-00352R000100100031-3 LOGISTICS SERVICES DIVISION WEEKLY REPORT PERIOD ENDING 5 OCTOBER 1983 I. Progress Report on Tasks Assigned by the DCI/DDCI: No items this reporting period. II. Items/Events of Major Interest: a. Installation of Carpet in DCI Suite: On 29 September 1983, 114 square yards of special color carpet tiles were in- stalled in 7D5606 Headquarters Building, the secretarial area of the DCI suite. b. Com pletion of Outstanding Requests: Car pet wa s in- stalled in t he PEP Buil ing, at the Motor Pool o ffices, and the entrance to the Gym at the Headquarters Building on 30 September and 1 October 1983. Additionally, all outstanding requests for carpet installation and shampooing and for drapery service, which were available for work, were completed under FY 1983 contracts. c. Safe Inventor : As of 3 October 1983, the inventory of safes in the metropo itan area is current. Moves, relocations, and PTI's of safes will now be input into the computer on a regular basis in order to maintain accurate figures. Any infor- mation which is needed pertaining to safes can be obtained easil querying the Safe System. To date there is a recor STAT of safes, broken down as follows: STAT d. Transportation: Limousine service was provided for EUR/LOG from through 30 September 1983. e. Window Washing: A contractor will commence washing both the outsides and insides of windows throughout the Headquarters Building on 5 October 1983. Completion of this project is ex- pected to take approximately one month. A Headquarters Notice with detailed information is being distributed to all components. f. Renovations at Head uarters Building: The sheetmetal Shop is in the process o fabricating window grills, and critical power has been installed in Room 2D0105 for the Office of Data Processing. A new door has been installed, masonry work has been com- pleted and painting will be completed this week in Room 3B2612 for the Africa Division, DDO. Carpentry work has been completed and the electrical work has started in Room 1B27 for the Office of Communications. Approved For Release 2009/08/06: CIA-RDP87-00352R000100100031-3 Approved For Release 2009/08/06: CIA-RDP87-00352R000100100031-3 With regard to the HSTS expansion in Room GD45, the electricians have completed the relocation of the overhead lights in this area, and the Sheetmetal Shop is fabricating a stand for the air handler unit. The Carpenter Shop started on 3 October 1983 to con- struct a for the wall with two doors and two windows in Office of Communications. Room 1B2102 GSA has advised that work in Room;GC57, GC47, and GC47/ BC27 for the Office of Data Processing will be delayed because of asbestos material covering pipes in the area. GSA will need special suits, medical evaluation of electricians who were on the job, and overtime to complete the jobs. g. Move of Executive Registry to 6E2914, Headquarters Buildin : Construction drawings were completed or minor work in Room 7E12, and work will commence after completion of the move of the Executive Registry to Room 6E2914. h.l , Modifications (Phase IV): The Architec- tural Design Staff (ADS), LSDOL, is currently reviewing existing raised floor specifications and drawings to establish contract documents and construction drawings needed to complete these renovations. i. I Building Renovations: Drawings for reno- vations to Suite 200, were sent to the Field Engineering Branch, Real Estate and Construction Division, OL, for plumbing input. j. Survey for SAFE Terminals: A survey has been conducted for construction of 11 SAFE terminals, the preliminary design has been approved for the area, and construction drawings are underway for Room 4F24, Headquarters Building, for the Office of East Asian Analysis, DDI. k. Drawings: Drawings to convert existing area in Room 6E05, Headquarters Building, into a VTR for the Office of Global Issues, DDI, were completed and were issued to the Space Mainte- nance and Facilities Branch (SM&FB), LSD/OL, on 29 September 1983. Working drawings for minor renovation in Room 2F20, Headquarters Building, for the Office of Personnel were completed and were submitted to SM$FB. Drawings for the renovation of the courier's lounge in Room GB1911, Headquarters Building are currently on hold awaiting input from the Headquarters Engineering Branch, RECD/OL, re- garding plumbing. Approved For Release 2009/08/06: CIA-RDP87-00352R000100100031-3 Approved For Release 2009/08/06: CIA-RDP87-00352R000100100031-3 1. Design Proposals: Representatives of ADS and the East Asia Division met to discuss the future configuration of Rooms 4G29-4G43. ADS is currently working on two design proposals. A design proposal has been submitted to the International Activities Division, DDO, for Room GG27, Headquarters Building. III. Significant Events Anticipated During the Coming Week: Base Stand for Air Handler: The Plumbing Shop is making a base stand for the air an ler which is to be installed in Room 3G13/19, Headquarters Building, for the Office of Global Issues, DDI, starting 6 October 1983. Acting Chief Logistics Services Division Approved For Release 2009/08/06: CIA-RDP87-00352R000100100031-3