LOGISTICS SERVICES DIVISION WEEKLY REPORT PERIOD ENDING 21 DECEMBER 1983
Document Type:
Collection:
Document Number (FOIA) /ESDN (CREST):
CIA-RDP87-00352R000100120032-0
Release Decision:
RIPPUB
Original Classification:
K
Document Page Count:
2
Document Creation Date:
December 22, 2016
Document Release Date:
August 10, 2009
Sequence Number:
32
Case Number:
Publication Date:
December 21, 1983
Content Type:
REPORT
File:
Attachment | Size |
---|---|
![]() | 82.61 KB |
Body:
STAT
Approved For Release 2009/08/10: CIA-RDP87-00352R000100120032-0
LOGISTICS SERVICES DIVISION
WEEKLY REPORT
PERIOD ENDING 21 DECEMBER 1983
STAT
STAT
I. Progress Report on Tasks Assigned by the DCI/DDCI:
No items this reporting period.
II. Items/Events of Major Interest:
a. Temporary Highway Security Barriers: The Architec-
tural Design to , prepared s Ketches for the
installation of highway security barriers at the DCI Garage,
Northeast Entrance, and Northwest Entrance at Headquarters
Building.
b. Survve : A survey of Room 7D00, Headquarters
Building, aah een conducted in preparation for design of space
for the office of General Counsel as part of
Building backfill.
c. Meetings: ADS met with representatives from the
Office of Communications and the A-E firm to discuss in detail
design of the Watch Office, Room 1B43 Headquarters Building.
Requirements for the move of the Office of Equal
Employment Opportunity, Office of Personnel, to 626 Chamber of
Commerce Building were discussed at a meeting between
representatives of that office and ADS. Minor power,
telephone, and painting work is required; and drawings are 90
percent complete.
The Director and Deputy Director of the Office of
Information Services (OIS) met with ADS to discuss existing
work orders and OIS objectives. ADS prepared sketches of one
OIS proposal for consolidation at Ames Building.
The Coordinator of the Alcohol Program, Psychiatric
Division, OP, and ADS met concerning the proposed move of that
office from the third to the first floor of Ames Building.
This move will be in lieu of their previously planned
1,"., , ,, , . Approved For Release 2009/08/10: CIA-RDP87-00352R000100120032-0
Approved For Release 2009/08/10: CIA-RDP87-00352R000100120032-0
STAT
STAT
STAT
After surveying the fifth floor of Ames Building, ADS
met with the Headquarters Engineering Branch, RECD/OL,
concerning future conduit installaton. Drawings are in
progress.
d. Proposals: Three proposals were prepared in
connection with making room for the existing Wang CPU's in the
7C Corridor, Headquarters Building, for the Office of the
Comptroller.
e. Move: The move of the Office of General Counsel from
Headquarters to was completed on Thursday,
15 December 198 .
f. Carpeting: Approximately 130 square yards of carpet
tiles were installed in GD6508 and GA3910, Headquarters
Building, on 17 December 1983.
g. Renovations at Headquarters Building: On Monday,
19 December 1983, t e carpenter,, Electrical, and Paint Shops
started work in Room 7D19 for the DCI Administrative Office.
In connection with the provision of bathroom and
pantry facilities in the Foreign Visitors Lounge, the kitchen
unit containing the stove, sink, and refrigerator has been
installed in the pantry area. The Plumbing Shop has completed
the installation of the drain line and is scheduled to tie in
the water lines this week. Due to the noise level of the
remaining work by the Sheetmetal Shop, it has been tentatively
scehduled for the evening of 28 December 1983.
Telephone work was completed and the operators
Carpentry has been finished, and minor electrical work And
painting remain to be done.
relocated last week in Room 6B4403,
III. Significant Events Anticipated During the Coming Week:
No items this reporting period.
Chief