LOGISTICS SERVICES DIVISION WEEKLY REPORT PERIOD ENDING 28 DECEMBER 1983
Document Type:
Collection:
Document Number (FOIA) /ESDN (CREST):
CIA-RDP87-00352R000100120040-1
Release Decision:
RIPPUB
Original Classification:
K
Document Page Count:
2
Document Creation Date:
December 22, 2016
Document Release Date:
August 10, 2009
Sequence Number:
40
Case Number:
Publication Date:
December 28, 1983
Content Type:
REPORT
File:
Attachment | Size |
---|---|
![]() | 79.07 KB |
Body:
Approved For Release 2009/08/10: CIA-RDP87-00352R000100120040-1
STAT
LOGISTICS SERVICES DIVISION
WEEKLY REPORT
PERIOD ENDING 28 DECEMBER 1983
STAT
STAT
I. Progress Report on Tasks Assigned by the DCI/DDCI:
No items this reporting period.
II. Items/Events of Major Interest:
a. Major Water Leaks: The cold weather played havoc
with three external ui ings, with major water leaks
reported
STAT
in the Map Library, Office of Central Reference,
Buildings, occupied by the Office of Technical Service (OTS),
on Tuesday, 27 December.
on Monday, 26 December 1983, and at Centra and ou h
The water in the Map Library was mopped up and
dehumidifiers were brought in to hasten the drying process.
Since the sprinkler system was activated, maps on the tops of
cabinets were soaked as were those stored close to the floor
where water accumulated. The extent of damage is unknown at
this time. An Agency photographer was dispatched Tuesday
morning to take pictures of the area.
GSA reported on Tuesday afternoon that their
employees were on the scene at Central and South Buildings
cleaning up and making necessary repairs.
b. Building: The installation of guard and
receptionist stations was completed on 21 December 1983. Due
to the decision by the Office of Security to post a guard at
the rear entrance, a matching desk has now been ordered for
this position.
c. Redesign of CONIF Space: A coordinated plan to
provide specialized workstations, accessible storage, and
defined work areas was developed and specified for OL/CONIF.
Proposals were approved, and orders are being processed.
d. Meeting Cancelled: The regular weekly priority
meeting of the Space Maintenance and Facilities Branch, OL/LSD,
and GSA was cancelled at the request of GSA because most of
their shop foremen were on leave.
,,,, -- , , , Approved For Release 2009/08/10: CIA-RDP87-00352R000100120040-1
Approved For Release 2009/08/10: CIA-RDP87-00352R000100120040-1
e. Renovations at Head uarters Buildin : The Carpenter
and Paint ops have completed their work in Room 7D19 for the
DCI Administrative Office. Installation and capping of
electrical and telephone outlets is in progress.
The carpenters and electricians have completed their
work in Room 4F24 for the Office of East Asian Analysis, DDI,
and the area is presently being painted.
f. Drawings - Headquarters Building: Drawings were
completed and issued to SM$FB to create an additional office
for a supervisor in Room 2G18 for the Office of Global Issues,
DDI.
Drawings of Room BD2807/09 for the Office of Data
Processing, DDA, were completed and issued to the Headquarters
Engineering Branch, Real Estate and Construction Division, OL.
g. Surveys at Headquarters Building: Rooms 3E48/3ES4
were surveyed and proposals made for renovations. A security
survey still has to be completed.
Rooms 3G22/3G30 were surveyed and design proposals
were submitted to the Office of Global Issues, DDI.
III. Significant Events Anticipated During the Coming Week:
No items this reporting pl-ri -d
Logistics Services Division
Approved For Release 2009/08/10: CIA-RDP87-00352R000100120040-1