LOGISTICS SERVICES DIVISION WEEKLY REPORT PERIOD ENDING 11 JANUARY 1984
Document Type:
Collection:
Document Number (FOIA) /ESDN (CREST):
CIA-RDP87-00352R000100130019-4
Release Decision:
RIPPUB
Original Classification:
U
Document Page Count:
3
Document Creation Date:
December 22, 2016
Document Release Date:
May 28, 2009
Sequence Number:
19
Case Number:
Publication Date:
January 11, 1984
Content Type:
REPORT
File:
Attachment | Size |
---|---|
![]() | 137.44 KB |
Body:
Approved For Release 2009/05/28: CIA-RDP87-00352ROO0100130019-4
AOMNSTRATIVE INTERNAL USE ONLY
LOGISTICS SERVICES DIVISION
WEEKLY REPORT
PERIOD ENDING 11 JANUARY 1984
I. Progress Report on Tasks Assigned by the DCI/DDCI:
No items this reporting period.
II. Items/Events of Major Interest:
a. Quality of Life: The selection of carpet, wall
covering, an furniture for the Office of Medical Services is
now complete; and orders have been forwarded to Procurement
Division, OL, for the first two items. Furniture has been
specified for processing when funding approval is given.
Seating is to be doubled.
Carpet in the elevators at Headquarters Building has
been specified for spring replacement.
One hundred ash/trash combination containers have
been ordered to replace wall-mounted ashtrays in the halls and
elevator wells at Headquarters Building.
Requests have been sent to GSA to replace 11,250
dispensers that use loose towels with roll-type units, to
obtain samples and price quotes for refinishing stalls, and to
repair all broken hardware in rest rooms at Headquarters
Building.
Permanent Planter Barricades: The Architectural
Design Staff (ADS) has located a local manufacturer of precast
concrete planters and is currently preparing a proposal using
this company's planters.
c. DCI Portraits: The Cedric Egeli copy of William
Draper's portrait of DCI McCone was hung on 6 January. On
9 January it was approved with great enthusiasm by the Fine
Arts Commission. The same artist's rendering of a new Turner
portrait will not commence until the Agency is willing to
request a photographic session of Turner.
AE! M+?,ZTRATIYE - INTERNAL USE OWLI
Approved For Release 2009/05/28: CIA-RDP87-00352ROO0100130019-4
Approved For Release 2009/05/28: CIA-RDP87-00352R000100130019-4
1,1n.' r `T{( 4t4{l _. 1A T iIn~
d. Meetings: Representatives of ADS, the Office of
General Counsel, and the Public Affairs Office (PAO) met to
determine client requirements for redesigning Room 7D000,
Headquarters Building, as part of the Stafford Building
backfill. Construction drawings are 75 percent complete but
are temporarily on hold pending changes in PAO requirements.
ADS and Office of Communications representatives met
with the A/E firm Kidde to discuss design proposals, which will
be presented to the Director of Communications on 11 January
1984.
e. Drawings: Construction drawings were completed and
issued to the ace Maintenance and Facilities Branch (SMFB),
OL/LSD, on 5 January 1984 for relocating the Administrative
Staff, Office of East AQinn is, to Room 3E54 Headquarters
Building, as part of th Building backfill.
Drawings for renovations to the Executive Dining Room
storage area in the basement of Headquarters Building (Room
BD2808), to bring it into compliance with standards set by the
FSA after its recent inspection, were completed and issued to
SM$FB on 5 January 1984.
Room 3D54,~ Building, was surveyed and design
proposals were presented to the Office of Communications. Con-
struction drawings are 30 percent complete.
f. Design Proposals: ADS prepared design proposals for
the move o two offices of the National Intelligence Council to
the 7B Corridor at Headquarters Building as part of the
Building backfill.
g. First Floor Corridor Painting - Headquarters
Buildin An outside irm has been awarded a GSA contract to
paint e walls and ceilings of the first floor corridors. In
order to protect the DCI portraits and Melzac-loaned art, all
paintings will be removed to storage on 16 January 1984 by
Artransport.
h. New Building Project Office Move: The Sheetmetal
Shop complete installation of expanded metal for VTR treatment
of Room 3E36/44 for the New Building Project Office. Masonry
work to block in a new door has been done, with brown and white
coating remaining. The Carpenter Shop is 90 percent complete,
with installation of bulletin boards remaining. Still to be
done is the installation of critical power.
Approved For Release 2009/05/28: CIA-RDP87-00352R000100130019-4
Approved For Release 2009/05/28: CIA-RDP87-00352ROO0100130019-4
ADMINISTRATIVE -- INTERVAL USE ONLY
i. Jobs Completed: The work order for Room GG2202, Head-
quarters Building, for the Office of Data Processing is being
reported as complete. SM$FB has been waiting for 3 months for
delivery of partitioning which needs an electric outlet hard
wired and the installation of a door buzzer and release. This
work will be done on a minor work order when the partition is
delivered.
The plumbing and electrical Shops completed the
hookup of the third air handler unit in Room GD45, Head-
quarters Building, for the Office of Communications HSTS
expansion.
With regard to the provision of bathroom/pantry
facilities in Room uarters Building, for the
the plumbing shop has completed
e covering ot pipes wit insulation, which finishes this job.
The painters have completed their work in Room 4F24,
Headquarters Building, for the DDI/OEA.
Painting of Room 6B4403, Headquarters Building, for
the Central Cover Staff, DDO, is finished.
j. Deactivation of Tube Station: The Carrier Mainte-
nance Section will deactivate Tube Station FU-1 in Room 7C17,
Headquarters Building, by 1700 hours on 10 January 1984.
III. Significant Events Anticipated During the Coming Week:
No items this reporting period.
Deputy Chief
Logistics Services Division
3
V`!!FTR TI VT ---- If!TEOIIA1 VF,[ ONLY