SUPPLY DIVISION WEEKLY REPORT PERIOD ENDING 3 JANUARY 1984
Document Type:
Collection:
Document Number (FOIA) /ESDN (CREST):
CIA-RDP87-00352R000100130028-4
Release Decision:
RIPPUB
Original Classification:
S
Document Page Count:
4
Document Creation Date:
December 22, 2016
Document Release Date:
May 28, 2009
Sequence Number:
28
Case Number:
Publication Date:
January 3, 1984
Content Type:
REPORT
File:
Attachment | Size |
---|---|
![]() | 91.38 KB |
Body:
Approved For Release 2009/05/28: CIA-RDP87-00352R000100130028-4
PERIOD ENDING 3 JANUARY 1984
I. Progress Report on Tasks Assigned by the DCI/DDCI:
Negative.
II. Items or Events of Major Interest that have Occurred During
the Preceding Week:
a. Change in Priority Codes:
Supply Management Branch (SMB) has implemented a change
in policy with respect to the assignment of priority codes. This
change, which was coordinated with the Chief, Depot Control Unit,
revised priority codes are as follow:
Depot, is designed to simplify our relationship with the
Depot and facilitate the processing of requisitions. The
PC-0 Any material with a required date of more than
five working days.
PC-1 Material required with five working days to meet
customer's required date.
25X1
25X1
25X1
25X1
PC-3 All material being procured and any stock requisition
without a customer required date.
b. TDY Support
returned from an extensive and successful
TDY on 3 January 1984. Due to long hours and
working weekends, the task was completed 30 days ahead of
schedule.
c. PCS Departure
SECRET
Approved For Release 2009/05/28: CIA-RDP87-00352R000100130028-4
Approved For Release 2009/05/28: CIA-RDP87-00352R000100130028-4
SUBJECT: Supply Division Weekly Report - Period Ending
3 January 1984
III. Significant Events Anticipated During the Coming Week:
Negative.
Approved For Release 2009/05/28: CIA-RDP87-00352R000100130028-4
Approved For Release 2009/05/28: CIA-RDP87-00352R000100130028-4
SECRET
PERIOD ENDING 2 JAN 1984
I. Items or Events of Major Interest that have Occurred during
the Preceding Week:
a. Excess Property:
1. On 28 December a trailer load of miscellaneous class "A"
executive furniture was delivered to the Sales Center, GSA Ware-
house, Bldg "A". This shipment consisted of seven documents.
I?tixl 18 line items and a total dollar value of $6,066.00.
25X1
25X1
2. On 29 December a trailer load of miscellaneous 4-drawer
safes was delivered to the Property Disposal Office (PDO),
Fort Belvoir for disposal. This shipment consisted of 10 docu-
ments. 16 line items and a total dollar value of $6,066.00.
c. Repaving Project: No progress due to poor weather conditions.
Weather permitting, the contractor expects to complete construction
of the second catch basin, grading and installation of electrical
conduit that will eventually serve Building 7.
d. Office of Communications (OC) Repair and Return Facility:
Progressing as scheduled. Painting is 99% complete, only some touch
up work yet to be done. Sheet metal work is now 50% complete and
the installation of a sprinkler system is 15% complete. The entire
project is now approximately 60% complete and set backs are not
25X1 anticipated
Approved For Release 2009/05/28: CIA-RDP87-00352R000100130028-4
Approved For Release 2009/05/28: CIA-RDP87-00352R000100130028-4
Approved For Release 2009/05/28: CIA-RDP87-00352R000100130028-4