LOGISTICS SERVICES DIVISION WEEKLY REPORT PERIOD ENDING 15 FEBRUARY 1984
Document Type:
Collection:
Document Number (FOIA) /ESDN (CREST):
CIA-RDP87-00352R000100140011-1
Release Decision:
RIPPUB
Original Classification:
U
Document Page Count:
3
Document Creation Date:
December 22, 2016
Document Release Date:
May 27, 2009
Sequence Number:
11
Case Number:
Publication Date:
February 15, 1984
Content Type:
REPORT
File:
Attachment | Size |
---|---|
![]() | 107.09 KB |
Body:
Approved For Release 2009/05/27: CIA-RDP87-00352R000100140011-1
AD!MINISTRATi [ -- IId1ERN!IL USE ONLY
LOGISTICS SERVICES DIVISION
WEEKLY REPORT
PERIOD ENDING 15 FEBRUARY 1984
I. Progress Report on Tasks Assigned by the DCI/DDCI:
No items, this reporting period.
II. Items/Events of Major Interest:
a. Quality of Life: In an effort to brighten up the
Executive Dining Room R), four hanging plants were purchased
and installed on 8 February 1984. The EDR was decorated on '
14 February 1984 in keeping with the theme for St. Valentine's
Day.
The electricians have completed upgrading the
lighting for the gymnasium, Room BE48 and the hallway, Head-
quarters Building, for the Office of Medical Services (OMS),
DDA.
b. Typewriter Repair Service: As indicated in
to be placed directly with Eastern Business Machines by persons
requiring this service.
d. Buildin Backfill: Construction drawings
for renovations to the Corridor of Headquarters Building, in
preparation for the move of the Comptroller, were completed and
issued to the Space Maintenance and Facilities Branch, OL/LSD,
on 14 February 1984.
The safety survey of Room 125, Ames Building, for OMS
has been received, but construction drawings are being held
pending a review with the Safety Staff.
Electricians are expected to complete installation of
lights this week in Room 7D0O for the Public Affairs Office,
DCI. Carpenters will then reinstall ceiling tiles, and
painting will be completed.
ADMI lSTEGTIVE - U:TERNAL USE ONLY
Approved For Release 2009/05/27: CIA-RDP87-00352R000100140011-1
Approved For Release 2009/05/27: CIA-RDP87-00352R000100140011-1
ADMINISIV I OR ONLY
Work has been completed in Room 3E48, Headquarters
Building, for the Office of East Asian Analysis, DDI.
e. Hydraulic Barricades: Representatives of the
Architectural Design Staff (ADS), OL/LSD, met with a
representative of the Domestic Security Branch, PTOS/OS, and
Delta Scientific Corporation on 9 February 1984. The
corporation provided information regarding the placement of
Traffic Sensor Loops and photographs of the barricades in
production. ADS will prepare drawings to show the placement of
the Traffic Sensor Loops.
f. New Addition to ADS:I ` who was formerly
with ADS and the National Photographic Interpretation Center,
DDS$T, has returned to ADS as of 13 February 1984, replacing
g. Renovations at Headquarters Building: This past
weekend the electricians completed electrical work for the WANG
system in Rooms 3D3105/5307 for the Latin America Division, DDO.
Carpenters are constructing framing for a new video
screen; electricians have installed the conduit and are
presently pulling wire for power to feed the new lighting,
audio and visual systems; and the Sheetmetal Shop is
fabricating and installing new ductwork in Room GAO9/13 for the
Office of Security, DDA.
The Carpenter Shop has completed replacement of 22
feet of partial-height partitioning in. Room 51)49 for the Office
of Global Issues, DDI. Work by electricians and painters may
now be scheduled.
With regard to the chilled water manifold and booster
pump, electricians have completed the hookup of the booster
pump in Room GC57 for the Office of Data Processing. DDA.
h. Stripping and Waxing of Floors: Arrangements were
made with the Buildings Manager, McLean Field Office, GSA, to
contract for J $ L Janitorial Service, Inc., to strip and wax
the corridors..on the ground and first floors of Headquarters
Building. This work commenced the evening of 9 February 1984
from 1700 to 2300 hours and is scehduled to be completed by
24 February 1984. The GSA labor force is presently performing
this same work on floors 2 through 7.
2
AfltlanernA Tivr
Approved For Release 2009/05/27: CIA-RDP87-00352R000100140011-1
Approved For Release 2009/05/27: CIA-RDP87-00352R000100140011-1
AMrs *R^,':'r_ iSE ONLY
III. Significant Events Anticipated During the Coming Week:
No items this reporting peri
Chief
Logistics Services Division
AOMIrI~,"?TRA11VE - INIEf N .t USE ONLY
Approved For Release 2009/05/27: CIA-RDP87-00352R000100140011-1