LOGISTICS SERVICES DIVISION WEEKLY REPORT PERIOD ENDING 14 MARCH 1984

Document Type: 
Collection: 
Document Number (FOIA) /ESDN (CREST): 
CIA-RDP87-00352R000100150024-6
Release Decision: 
RIPPUB
Original Classification: 
C
Document Page Count: 
2
Document Creation Date: 
December 22, 2016
Document Release Date: 
May 29, 2009
Sequence Number: 
24
Case Number: 
Publication Date: 
March 14, 1984
Content Type: 
REPORT
File: 
AttachmentSize
PDF icon CIA-RDP87-00352R000100150024-6.pdf63.06 KB
Body: 
Approved For Release 2009/05/29: CIA-RDP87-00352R000100150024-6 CONFIDENTIAL LOGISTICS SERVICES DIVISION WEEKLY REPORT PERIOD ENDING 14 MARCH 1984 I. Progress Report on Tasks Assigned by DCI/DDCI: No items this reporting period. II. Items/Events of Major Interest: b. Transportation: Special limousine service was provided touropean Division, DDO on 6 March. c. Construction Drawings: Construction drawings are in progress for SOVA/ move to 4E corridor. d. Building Backfill: Room 7D00 Backfill, O/DCI. The electricians completdthe installation of critical power. The carpenters have re-installed the ceiling tiles and painting has been completed. Only remaining work is for GSA engineers and capping of telephone outlets. Carpet installation is being scheduled. The Sheet Metal Shop is presently installing expanded metal between room 7C18 and 7C24 to meet VTR specifications for the DCI/Comptroller. Carpenters are.continuing work in the area and are approximately 40 percent complete. Final revised drawings for Offices of Personnel and Security, DA and LA Division, DO, Room 3E29,, will be completed and released to the contractor by 14 March. e. Planter Barricade: Planters for the Northeast and Southwest entrances will be delivered on Friday, 23 March. The highway barricade presently at the Northeast entrance will be relocated to the Northwest entrance. CCNFICEI;TIM,l. Approved For Release 2009/05/29: CIA-RDP87-00352R000100150024-6 Approved For Release 2009/05/29: CIA-RDP87-00352R000100150024-6 CU F1f ENT!A N 25X1 25X1 f. Hydraulic Barricades: Drawings for the installation g. Security Trailer - West Lot Entrance: Proposals from two contractors were received and the low proposal was $19,850. A 2420 in the amount of $20,000 was received from OS/LS on 12 March 1984. The specifications are being typed in final. Contract will be submitted for legal review and signatures on 14 March with award occuring shortly thereafter. Contractor has indicated that he will try to start work 7 days of the hydraulic barricades are .nearing completion. after receipt of notice to proceed. III. Significant Items Anticipated During the Coming Week: No items this reporting period. Chief Logistics Services Division CONFIDENTIAL ? , , Approved For Release 2009/05/29: CIA-RDP87-00352R000100150024-6