LOGISTICS SERVICES DIVISION WEEKLY REPORT PERIOD ENDING 7 MARCH 1984

Document Type: 
Collection: 
Document Number (FOIA) /ESDN (CREST): 
CIA-RDP87-00352R000100150036-3
Release Decision: 
RIPPUB
Original Classification: 
C
Document Page Count: 
3
Document Creation Date: 
December 22, 2016
Document Release Date: 
May 29, 2009
Sequence Number: 
36
Case Number: 
Publication Date: 
March 7, 1984
Content Type: 
REPORT
File: 
AttachmentSize
PDF icon CIA-RDP87-00352R000100150036-3.pdf141.84 KB
Body: 
Approved For Release 2009/05/29: CIA-RDP87-00352R000100150036-3 LOGISTICS SERVICES DIVISION WEEKLY REPORT PERIOD ENDING 7 MARCH 1984 I. Progress Report on Tasks Assigned by the DCI/DDCI: No items this reporting period. II. Items/Events of Major Interest: a. Operation and Maintenance of CIA Headquarters Building: A Memorandum of Understanding was signed by GSA whereby CIA will take over the maintenance and operation of the Headquarters Building by January 1985. As a first step in the process, Allied Eastern States Maintenance Corporation (Allied) started to assume from GSA some responsibility for routine maintenance beginning the weekend of 3-4 March 1984. Allied personnel will police all lavatory and public areas during the daytime and will perform major floor maintenance tasks in corridors and public areas as well as thoroughly cleaning and servicing all lavatories in the evening. Working up to 1,000 hours of overtime on weekends, Allied personnel will upgrade the appearance of floors in corridors and public areas to an acceptable level. By July 1984, a contractor will be identified by CIA to begin taking over these responsibilities, with full responsibility being assumed by January 1985. Until October 1984, contractors will be brought in to handle custodial requirements, repairs, and operations. b. New Office of Logistics Division: The Logistics Services Division has been assisting in planning the composition of a new organization, the Headquarters Operations, Maintenance, and Engineering Division, OL, which is being created in the Agency to serve as a single focal point for all maintenance, operations, and custodial services at Headquarters Building. Details are still being worked out, an Employee Bulletin giving preliminary information has been prepared, and a Headquarters Notice will be forthcoming when the final structure affing of the new division have been finalized. c. Headquarters Exhibit Corridor: The annual exhibit of photographs taken by Agency employees is on display in the lD Exhibit Corridor at Headquarters Building and will continue for the month of March 1984. CGIVIDENT111 Approved For Release 2009/05/29: CIA-RDP87-00352R000100150036-3 Approved For Release 2009/05/29: CIA-RDP87-00352R000100150036-3 CL`;r1.r T IA1, d. Main Corridor Wall Art: -Ti A'Melzac-loaned art work and a 1 portraits o former DCIs have now been rehung, bvt--tire a -rangemen-ts in the C 2Ad ~ ZLd TS _ ware DCI portraits are now located in the C Corridor where temperature and humidity fluctuations are not as severe as in the F Corridor. The photographic copy of the Helms portrait is among the items on display. The original Helms oil painting is 25X1 being evaluated by a conservator for minor restoration. 25X1 25X1 25X1 f. Transportation: Special limousine services were provided to the Latin America Division, DO, from 29 February through 2 March 1984. g. Construction Drawings: Construction drawings for minor renovations to Room 7F18, Headquarters Building, for the Office of Current Production and Analytic Support, DI, were completed and issued to the Space Maintenance and Facilities h. Security Trailer, West Lot Entrance: On 1 March 1984 a meeting was held between ADS, Headquarters Engineering Branch (HEB), OL/RECD, and the New Building Project Office to resolve problems in the design of the Security Trailer, West Lot Entrance. Architectural drawings were completed and returned Branch, OL/LSD, on 2 March 1984. to HEB the day after the meeting. i. uilding Backfill: Electricians have completed the rebalancing of the rate-of-rise in Room 7D00 for the DCI and will complete the installation of critical power this week. Carpenters will reinstall ceiling tiles this week The Carpenter Shop started work in the 7D Corridor, for the Comptroller, DCI, on 2 March 1984 and replaced a sheetrock wall separating Rooms 7C18 and 7C24 with a metal wall for the purpose of vault treatment. The Electric Shop worked over the weekend and drilled a large portion of the telephone and electrical outlets. and painting will then be scheduled. The first revision of drawings for Room 3E29, for the Offices of Personnel and Security, DA, and the LA Division, DO ~INFIIENTIAI Approved For Release 2009/05/29: CIA-RDP87-00352R000100150036-3 Approved For Release 2009/05/29: CIA-RDP87-00352R000100150036-3 j. Renovations at Headquarters Building: Carpenters are finishing the trim work around the stage area in Rooms GA09/13 for the Office of Security, DA. Ceiling panels containing the light fixtures have been installed and connected to a temporary switch until dimmers are installed. With regard to the construction of a new vestibule for Room GC03 for the Office of Data Processing, DA, white coating of the new wall is in process, and the new "B" label double doors with hardware have been installed. The existing Mosler door will be removed when the alarm contacts have been relocated. Minor alterations in Rooms 5D49, Office of Global Issues, DI, have been completed. Representatives of ADS and the Administrative Office, Office of Legislative Liaison (OLL), met to discuss plans for the latter's move to Room 7B24 and the OLL staff move to Room 7B18. Plans are currently being revised. III. Significant Items Anticipated During the Coming Week: No items this reporting period. Chief Logistics Services Division 3 Approved For Release 2009/05/29: CIA-RDP87-00352R000100150036-3