LOGISTICS SERVICES DIVISION WEEKLY REPORT PERIOD ENDING 18 APRIL 1984
Document Type:
Collection:
Document Number (FOIA) /ESDN (CREST):
CIA-RDP87-00352R000100160015-5
Release Decision:
RIPPUB
Original Classification:
U
Document Page Count:
3
Document Creation Date:
December 22, 2016
Document Release Date:
May 7, 2009
Sequence Number:
15
Case Number:
Publication Date:
April 18, 1984
Content Type:
REPORT
File:
Attachment | Size |
---|---|
![]() | 113.76 KB |
Body:
Approved For Release 2009/05/07: CIA-RDP87-00352R000100160015-5
ADMINISTR!JIVE -1NTERPAt USE ONLY
LOGISTICS SERVICES DIVISION
WEEKLY REPORT
PERIOD ENDING 18 APRIL 1984
I. Progress Report on Tasks Assigned by the DCI/DDCI:
No items this reporting period. (U)
II. Items/Events of Major Interest:
a. Quality of Life: During the next two weeks, the
Durathon rubber sports surface for the gymnasium, locker rooms,
and the new running track is scheduled for installation. (U)
b. DCI Portraits: On 13 April 1984 restoration of the
Raborn portrait was completed by Roz Westmoreland, formerly of
the National Portrait Gallery. The painting was returned to
its place in the 1C Corridor of Headquarters Building, and at
the same time the Hillenkoetter portrait was removed for
conservation purposes. It will be returned in time for Family
Visitation Day.
Mr. Casey will have the first sitting for his
portrait with the artist Raymond Kinstler on 12 May in the
artist's studio in New York City. The normal time for
completion of portraits after the first sitting is 6 months.
(U)
c. Transportation: Special limousine transportation was
provided for the European and East Asia Divisions last week.
(U)
d. Hydraulic Barricades: Representatives of the
Architectural Design Staff (ADS), OL/LSD, and the Field
Engineering Branch (FEB), OL/RECD, met to survey road
elevations at the proposed sites for installation of hydraulic
barricades on the Headquarters compound. ADS is sending the
results to Delta Scientific Corporation. (U/AIUO)
e. Front Entrance Barricades: ADS received the
preliminary cost estimate from FEB for installation of
barricades at the front entrance to the Headquarters compound
and has forwarded it to appropriate personnel. (U/AIUO)
hD!,;l?; 1 TovFrrtt USE ON(
Approved For Release 2009/05/07: CIA-RDP87-00352R000100160015-5
Approved For Release 2009/05/07: CIA-RDP87-00352R000100160015-5
ADMIT SRATIVE -- IiJL i1AL USE ONLY
g.l Building Backfill: The Electric Shop has
completed tilling of power and telephone outlets in the 7C
Corridor of Headquarters Building for the Comptroller, DCI.
Painting of this area is 80 percent complete, and the Sheet-
metal Shop is presently fabricating the window grills for one
side of the corridor. The Electric Shop worked overtime this
past weekend to complete the drilling for the Wang electrical
outlets. Installation of wiring will be done during normal
working hours.
The Office of Soviet Analysis has completed reviewing
the preliminary design drawings for the 4E Corridor, Head-
quarters Building, and is returning them with comments so that
the final construction drawings can be completed.
Construction drawings were completed for Room 125,
Ames Building, for the Office of Medical Services and were
issued to the Space Maintenance and Facilities Branch (SM&FB),
OL/LSD, on 13 April 1984. (U)
h. Drawings: Construction drawings for minor reno-
vations to Room 7F18, Headquarters Building, for the Office of
Current Production and Analytic Support have been completed and
were issued to SM$FB on 17 April 1984.
Construction drawings to subdivide a vault for the
Office of Communications were completed and issued to SM&FB on
17 April 1984. (U)
i. Credit Union Renovations: Plans for renovations to
the Credit Union, Room 1J33, Headquarters Building, including
the installation of an Automated Teller Machine, have been
completed and were issued to SM$FB on 16 April 1984. (U)
Survey: ADS has completed a survey of space use in
Building to accommodate new Office of Security
personnel. (U)
k. Renovations at Head uarters Buildin : Painting,
carpentry, an electrical work have been completed in Room
GA09/13, for the Office of Security. The contractor is
presently installing the audio and visual equipment.
2
AO'1?~~IS*?ATI~lE --- IMfFR?Ml. USE OP?tY
Approved For Release 2009/05/07: CIA-RDP87-00352R000100160015-5
Approved For Release 2009/05/07: CIA-RDP87-00352R000100160015-5
ADC, mISTRATIVE --- INTERNAL USE ONLY
The outlets for power and telephones in the last
phase of this job have been installed in Room 2D00 for the
Office of Data Processing. The Sheetmetal Shop is scheduled to
install the window grills this week. (U)
1. Cleaner for Wang Platens: A cleaner for use on Wang
platens is carried in Building Services Branch Supply Rooms
under Stock umber 7510-616-9588. (U)
III. Significant Events Anticipated During the Coming Week:
No items this reporting period.
Chief
Logistics Services Division
An I I mt-Y n ~.iu.