REPORT OF SIGNIFICANT LOGISTICS ACTIVITIES FOR PERIOD ENDING 2 AUGUST 1984
Document Type:
Collection:
Document Number (FOIA) /ESDN (CREST):
CIA-RDP87-00352R000100200042-0
Release Decision:
RIPPUB
Original Classification:
S
Document Page Count:
3
Document Creation Date:
December 22, 2016
Document Release Date:
May 4, 2009
Sequence Number:
42
Case Number:
Publication Date:
August 2, 1984
Content Type:
MEMO
File:
Attachment | Size |
---|---|
![]() | 122.67 KB |
Body:
i
Approved For Release 2009/05/04: CIA-RDP87-00352R000100200042-0
2 August 1984
MEMORANDUM FOR: Deputy Director for Administration
FROM: Daniel C. King
Director of Logistics
SUBJECT: Report of Significant Logistics Activities
for Period Ending 2 August 1984
1. Progress Report on Tasks Assigned by the DCI/DDCI:
No tasks assigned during this reporting period.
2. Events of Major Interest that have Occurred
During the Preceding Week:
a. Digital Prepress Update: RFP 84B-337 for an Automated
Page Makeup System was mailed to nine prospective bidders on
27 July, and responses are due by 27 August. The Digital
Prepress Task Group is currently compiling data to be used in an
Efficiency of Operation Test (EOT) by bidders determined to be
in competitive range prior to contract award. We are confident
that an award will be made by 30 September.
b. Security Enhancement Key, Ames, C of C: The Contractor,
GIC, has completed installation of conduit in the Key Building.
Conduit installation in the Ames Building has now reached the
point where escorts are required. The escort service has been
unable to provide sufficient escorts, and the Office of Security
has been asked for assistance. Truland Electrical Inc. is
expected to begin installation of electrical wires next week.
Overall, the project is approximately 15% completed and is
expected to be done and completed by the end of September 1984.
Approved For Release 2009/05/04: CIA-RDP87-00352R000100200042-0
Approved For Release 2009/05/04: CIA-RDP87-00352R000100200042-0
SUBJECT: Report of Significant Logistics Activities
for the Period Ending 2 August 1984
e. The Following
Week:
Renovations were Completed this
(1) Pouring of a concrete pad and installation of
underground conduit for the new guardhouse has been
completed. Also, the contractor completed work on new
concrete curbs at the front entrance
(2) GSA has completed the first application of a
sealing compound to the entire roof. Application
of a second coat, both a sealer and reflective substance,
is about 25% complete. Weather permitting, the second
coat will take approximately two weeks to complete.
f. Quality of Life: Text for the booklet, "Quality of
Life in CIA," is complete and is being sent to the Printing
and Photography Division (P&PD), OL, for photographic
g. Hydraulic Barricades: Over the past weekend, two more
hydraulic barricades were installed at the George Washington
Memorial Parkway entrance to the Headquarters Compound. The
two remaining hydraulic barricades for the Route 123 entrance
have been received and are to be installed shortly.
h. Northside Utility Line Project: The Contractor is
repairing a leak in the underground chilled water supply and
return lines at the powerplant. GSA indicated that they feel
one additional leak exists in the supply line. The Contractor
began refilling and retesting these lines on 1 August 1984.
Assuming the above are the last of the leaks, the
earliest the chilled water lines could be in operation would
be mid-August as the Contractor has approximately one week of
work to tie the underground chilled water lines to the lines
in the Headquarters Building after successful testing. GSA
indicated the Contractor has approximately two weeks of
cleanup work after the chilled water lines are placed in
Approved For Release 2009/05/04: CIA-RDP87-00352R000100200042-0
Approved For Release 2009/05/04: CIA-RDP87-00352R000100200042-0
0 r, L K t T
SUBJECT: Report of Significant Logistics Activities
for the Period Ending 2 August 1984
The new Southside underground chilled water lines to
be installed under the New Building Project were designed to
be of the same material and construction as the Northside
lines. Due to the problems which have been experienced, GSA
indicated that consideration is being given to change the
d
esign of the Southside lines to ductile iron piping.
i. 7F Operations Center: The 50 percent design drawings
and specifications were received for review by the Engineering
and Construction Branch the week of 23 July 1984. A review
between the Component, E&CB, and the designer, Kidde
Consultants, Inc., is scheduled for 1 August 1984. The final
design package is scheduled for completion by 31 August 1984
in order to allow award of a construction contract prior to 1
October 1984. The estimated uction cost for this
project is $560,000.00. 7~
j. D/L Quarterly Meeting: The Director of Logistics
Quarterly Meeting was held at the Central Depot on 1 August.
OL uses the Quarterly Staff meeting to keep OL careerists,
assigned outside , informed on current issues within the
Office.
niel C. Kin