REPORT OF SIGNIFICANT LOGISTICS ACTIVITIES FOR PERIOD ENDING 20 SEPTEMBER 1984
Document Type:
Collection:
Document Number (FOIA) /ESDN (CREST):
CIA-RDP87-00352R000100210014-0
Release Decision:
RIPPUB
Original Classification:
S
Document Page Count:
4
Document Creation Date:
December 22, 2016
Document Release Date:
May 12, 2009
Sequence Number:
14
Case Number:
Publication Date:
September 20, 1984
Content Type:
MEMO
File:
Attachment | Size |
---|---|
![]() | 110.09 KB |
Body:
Approved For Release 2009/05/13: CIA-RDP87-00352R000100210014-0
20 September 1984
MEMORANDUM FOR: Deputy Director for Administration
FROM: Daniel C. King
Director of Logistics
SUBJECT: Report of Significant Logistics Activities
for Period Ending 20 September 1984
1. Progress Report on Tasks Assigned by the DCI/DDCI :
No tasks assigned during this reporting period. F
2. Events of Major Interest That Have Occurred During the
Preceding Week:
b. On 17 September, the Deputy Chief, Information and
Management Support Staff, Office of Logistics (IMSS/OL),
briefed the Director of Communications (D/OC) and his
senior staff on the Logistics Integrated Management System
(LIMS) project. On 18 September, another meeting was held
with the D/OC to explain how OL proposed to implement LIMS,
using the office of Communications (OC) as the pilot
office. The proposal was well received, and the D/OC gave
his total support. On 19 September, members of IMSS/OL
began discussions with various components within OC to
ensure that they will be prepared to make the transition to
LIMS in February 1985.
Approved For Release 2009/05/13: CIA-RDP87-00352R000100210014-0
Approved For Release 2009/05/13: CIA-RDP87-00352R000100210014-0
S E C R E T
SUBJECT: Report of Significant Logistics Activities for
25X1 Period Ending 20 September 1984
g. Office of Soviet Analysis (SOVA): SOVA personnel
will begin moving into the 4E area of the Headquarters
Building on 24 September 1984.
Approved For Release 2009/05/13: CIA-RDP87-00352R000100210014-0
Approved For Release 2009/05/13: CIA-RDP87-00352R000100210014-0
S E C R E T
SUBJECT: Report of Significant Logistics Activities for
Period Ending 20 September 1984
h. Headquarters Maintenance and Operation Transition:
(1) On 17 September 1984, Allied Maintenance
Corporation (Allied) took over the responsibility of
cleaning and upgrading offices in the 2B and 2C
corridors, including vaulted areas. These offices are
being cleaned under close supervision as a training
area for fine-tuning the work of Allied personnel prior
to their taking over responsibility for additional
office space.
(2) Allied is now cleaning the Auditorium,
including the terrazzo floor in the lobby, the steps
and the tunnel area.
(3) As a result of the Office of Security's
decision to provide interim clearances to all Allied
personnel who have successfully completed the polygraph
examination, approximately 50 Allied personnel were
badged during the week of 17 September 1984. These are
primarily custodial personnel. Mechanical personnel
will follow shortly.
i. OC Watch Office: Demolition work began the week of
4 September 1984. The contractor has installed a security
dust-barrier wall between the existing operational area of
OC and the construction site and is in the process of
installing a barrier in the "C" corridor to allow
demolition of the C-corridor wall for the window.
j. Northside Utility Lines: GSA has indicated that
the underground chilled-water supply and return lines
successfully passed their pressure tests and have been
accepted. During a scheduled chilled-water outage from
0200 hours on 15 September through 0200 hours on
16 September, the contractor reversed chilled-water supply
and return connections in the Headquarters Building
basement which had been incorrectly installed.
3. Significant Events Anticipated During the Coming Week:
Approved For Release 2009/05/13: CIA-RDP87-00352R000100210014-0
Approved For Release 2009/05/13: CIA-RDP87-00352R000100210014-0
S E C R E T
SUBJECT: Report of Significant Logistics Activities for
Period Ending 20 September 1984 F----]
b. Digital Prepress: During the next week, the
Digital Prepress Technical Evaluation Team will make a
final recommendation to the Source Selection Board for
award of contract after reevaluating the proposals,
clarification, and efficiency of operation tests. The
source selection recommendation will be presented t,+-b
Agency Contract Review Board on 25 September 1984.