HEADQUARTERS OPERATIONS, MAINTENANCE AND ENGINEERING DIVISION, OL WEEKLY REPORT PERIOD ENDING 31 OCTOBER 1984
Document Type:
Collection:
Document Number (FOIA) /ESDN (CREST):
CIA-RDP87-00352R000200020048-3
Release Decision:
RIPPUB
Original Classification:
U
Document Page Count:
4
Document Creation Date:
December 22, 2016
Document Release Date:
April 20, 2009
Sequence Number:
48
Case Number:
Publication Date:
October 31, 1984
Content Type:
REPORT
File:
Attachment | Size |
---|---|
![]() | 181.28 KB |
Body:
Approved For Release 2009/04/20: CIA-RDP87-00352R000200020048-3
n'J 1'!tiiilJ t nn... \
STAT
HEADQUARTERS OPERATIONS, MAINTENANCE
AND ENGINEERING DIVISION, OL
WEEKLY REPORT PERIOD ENDING 31 OCTOBER 1984
I. Progress Report on Tasks Assigned by DCI/DDCI:
No tasks assigned during this reporting period.
II. Items/Events of Major Interest:
STAT
c. Hydraulic Barricades: The hydraulic barricades at
the Route 123 Entrance tome Headquarters compound are fully
operational. The "bugs" are being worked out of the
underground barricades. Work has begun on the barricades at
the George Washington Memorial Parkwa
Entrance
y
.
/
d. Computerized Car ool Information: Effective
30 October 1984, the records pertaining to grid data for
V__,,-carpools at Headquarters Building have been updated in the
FEDPARK system. In order to keep the information current,
deletions and additions will be made on a daily basis.
e. Flooding of 1B Corridor: Major flooding in the 1B
Corridor of Headquarters Building on 29 October 1984 was caused
by the opening of a two-inch drain line for a riser in the 3B
Corridor area. The valve emptied into a utility closet sink
which had paper in it, causing the drain to clog and the sink
to overflow.
f. New Light Fixtures: The GSA Electric Shop worked
overtime to install new energy-saving light fixtures in
Stairwells Two and Eight at Headquarters Building.
Approved For Release 2009/04/20: CIA-RDP87-00352R000200020048-3
Approved For Release 2009/04/20: CIA-RDP87-00352R000200020048-3
!UMIMSIKRiUVL--01100TIAL U3t UAL
g. Repair of Lift Ramps: The GSA Sheetmetal Shop worked
overtime this past weekend to repair the lift ramps at the
North and South Loading Docks at Headquarters Building.
h. Carpet Installation: On 27 October 1984 the Building
Services Section (BSS), Special Services Branch, HOME/OL,
installed are yards of roll carpet in Rooms 2F22 and 2F26
STAT
i. Relocation to Ames Buildin : On 23 October 1984
YJ office furnishings for the Intelligence Community Staff were //
moved to the Tenth Floor of Ames Building.
j. Relocation - Headquarters Buildin : On 24 October
984 BSS relocated 14 workstations for the Office of Central
Reference, DI, within Rooms lH25 through 1H39. Room lA07 was
set up for 75 students attending a two-day orientation for the
Joint Chiefs of Staff and Defense Intelligence Agency.
On 25 October 1984 BSS relocated 0 workstations for STAT
he Office of Current Production and Analytic Support and
Management Planning and Services, Special Support Center, DI, STAT
within Rooms 7G30, 7G25, 6F33, 6F44, 6F45, and 2F42.
On 26 Octob r 1984 BSS relocated U workstations for
OCR in Room 1H39 and 71 workstations for the Administrative
-p/ Officer, National Intelligence Council, from the Room GH62 area
to Room 6C19.
On 29 October 1984 a workstations in Room 1H39 were
moved for OCR.
JJ magnetic tape were delivered to
for burning. STAT
1. Wang Work Orders: continues
STAT
equi
ment
The contractor is curr
ntl
ki
v
ith th
p
.
e
y wor
ng
w
e
installation of Wangs within Room 3F1403.
M. Pedestrian Tunnel Repair: The remaining sidewalk and
old waterproofing will be removed this week. A work slowdown
occurred on 29 October 1984 due to a special Auditorium
activity. Installation of new waterproofing material is
scheduled to start the week of 5 November 1984.
STAT
STAT
k. Magnetic Tapes: On 26 October 1984 six skids of
"'A""rrndTtUr !'37rRu+h' H f flN Y
Approved For Release 2009/04/20: CIA-RDP87-00352R000200020048-3
Approved For Release 2009/04/20: CIA-RDP87-00352ROO0200020048-3
ADMIsNISTRATIVE---,Iia1ERNAL Ust UrM
n. P&P Laserite, Gym HVAC, and ODP Renovations: The
construction contract for the installation of the Laserite
Printer in the P&P Building was complete on schedule, except
for the installation of the two input breakers. Temporary
connection has been made to maintain operations.
The computer interfacing between Rooms GCO3 and GEO4
is progressing as scheduled. Conduit installation in the DCI
Garage and running track areas was completed as scheduled. VTR
f
d d
f
h
b
rame an
oor
rame
ave
een erected. Installation of AHU is
scheduled to be completed by 15 November 1984.
The Gym HVAC installation started on 29 October
1984. The Gym area will be closed from 5 to 19 November 1984
to allow the contractor to complete this portion of the
contract.
o. Cafeteria Renovation: The Cafeteria renovation was
started on 26 October 1984. Three 12-hour shifts were worked
by the general contractor and by subcontractors. The ceiling
tiles and framing of the North Cafeteria and also above the
Loft Area have been removed. The existing lighting fixtures
above the Loft Area, with the exception of two, have been
removed. In the North Cafeteria, approximately 40 percent of
the lighting fixtures have been removed. The remaining
fixtures are in place to support temporary lighting.
Approximately 560 sheets of sheet rock and other supplies are
on site. Work has also started on the dry wall ceiling framing
in the North Cafeteria. Other work is scheduled to continue on
2 November 1984.
p.enovations at Headquarters Building:
5E Renovations: The project remains at a standstill
pending the move of some of the occupants circa 1 November 1984.
1H39 Renovations: Progress continues to be slow due
to the presence of occupants and security requirements. The
contractor worked Saturday, 27 October 1984, to do some
electrical work. A power outage will be conducted on
4 November 1984 between the hours of 0730 and 1500 hours to
c.. .. , 1 . +..+.. +1... ..l ....+.... ,- ..I - - ----- ---
7B Corridor Renovations: A decision was made to
replace the ceiling and carpet. Plans for revised HVAC,
reflective ceiling and ceiling lighting, and one architectural
of t,rflSTRATIUE-Iid1ERNAL USE ONLY
Approved For Release 2009/04/20: CIA-RDP87-00352ROO0200020048-3
Approved For Release 2009/04/20: CIA-RDP87-00352R000200020048-3
AUMhiJSTRAJIVE -- INTERNAL IJSE 01iEY
STAT
STAT
drawing are being prepared. West Grout) delivered a proposal on
29 October 1984 in the amount of Demolition started
on 27 October 1984.
III. Si,gnif icaqt...-k4ents-Air-t.i.c.ipatteed ' 6Uri-ng:.--the-? -Cpmin W~eIC _
b. Scheduled Relocations at Headquarters Buildin :
Approximately workstations in Rooms 7B35 and 7El3 for the
Administrative Office, DCI, and 0 workstations for the
Collection Requirements and Evaluation Staff, DI, are scheduled
for relocation during the week of 5 November 1984.
ie
Headquarters Operations, Maintenance
and Engineering Division, OL
STAT
STAT
STAT
IBlt /ll'(?f . 7111P Atrf, -Ttft i GJf 0?*; V
Approved For Release 2009/04/20: CIA-RDP87-00352R000200020048-3