REPORT OF SIGNIFICANT LOGISTICS ACTIVITIES FOR PERIOD ENDING 27 DECEMBER 1984
Document Type:
Collection:
Document Number (FOIA) /ESDN (CREST):
CIA-RDP87-00352R000200030002-2
Release Decision:
RIPPUB
Original Classification:
S
Document Page Count:
2
Document Creation Date:
December 22, 2016
Document Release Date:
April 17, 2009
Sequence Number:
2
Case Number:
Publication Date:
December 27, 1984
Content Type:
MEMO
File:
Attachment | Size |
---|---|
![]() | 84.84 KB |
Body:
Approved For Release 2009/04/17: CIA-RDP87-00352R000200030002-2
MEMORANDUM FOR: Deputy Director for Administration
Daniel C. King
Director of Logistics
Report of Significant Logistics
Period Ending 27 December 1984 25X1
1. Progress Report on Tasks Assigned by the DCI/DDCI:
2. Events of Major Interest That Have Occurred During the
Preceding Week:
a. Cafeteria Renovations: Cafeteria renovations
continued during the weekend of 21-23 December 1984.
(1) In the North Cafeteria, the dry wall contractor
completed the final taping, patching, and sanding
operation for the new ceiling to accept the sealing base
coat. The carpentry framing work to box around the
existing column by the cash registers was started.
(2) The hanging of the new dry wall ceiling in the
South Cafeteria is completed up to the loft area in the
middle bay area. No final sanding and patching
operations were accomplished in this area this past
weekend.
(3) In the south bay area, the taping, patching, and
sanding is complete. The carpentry framing work to box
around the existing exposed columns and for the 25X1
installation of the hanging box beams was started.
(4) Work is scheduled to resume on 28 December
b. New Building Project:. The initial phase of the
office fitup layout has been completed. The design team from
Smith, Hinchman, and Grylls will return 7 January 1985 to
begin the second phase. F----] 25X1
Approved For Release 2009/04/17: CIA-RDP87-00352R000200030002-2
Approved For Release 2009/04/17: CIA-RDP87-00352R000200030002-2
SUBJECT: Report of Significant Logistics Activities for
Period Ending 27 December 1984 F__1 25X1
c. Support to the Protocol Branch/Office of Personnel:
During this reporting period, 40 foreign gifts were verified
and packaged for shipment. These items will be sent to the
General Services Administration. The estimated cost of these
gifts was Q and great care had to be taken in packing. 25X1
Some of these items included carved ivory tusks,
silver-over-brass, seven-piece beverage set, bronze 25X1
sculptures, a repousse silver vase, etc. Over 80 man-hours
were used by the Design and Specification Unit personnel at
to complete this task.~ 25X1
d. Autologic "Bit Blasters": One of the two Autologic
"Bit Blasters" (laser printers with full font capacity) has
been installed and is running in a test environment in the
Office of Logistics/Printing and Photography Division
(OL/P&PD) Electronic Text Editing and Composition System
facility. These devices will be used as "proof printers" for
typeset publications in lieu of the expensive film output
from phototypesetters. It is anticipated that when both "Bit
Blasters" are operational, P&PD will save considerable supply
3. Significant Events Anticipated During the Coming Week:
Agency Telephone Book: Although much of press and
bindery work remains to be completed, OL/P&PD is hopeful that the
Agency telephone book will be completed by the end of December.