WEEKLY REPORT FOR PERIOD ENDING 14 DECEMBER 1984
Document Type:
Collection:
Document Number (FOIA) /ESDN (CREST):
CIA-RDP87-00352R000200030021-1
Release Decision:
RIPPUB
Original Classification:
S
Document Page Count:
1
Document Creation Date:
December 22, 2016
Document Release Date:
April 17, 2009
Sequence Number:
21
Case Number:
Publication Date:
December 14, 1984
Content Type:
MEMO
File:
Attachment | Size |
---|---|
![]() | 83.33 KB |
Body:
Approved For Release 2009/04/17: CIA-RDP87-00352R000200030021-1
SECRET
MEMORANDUM FOR: DIRECTOR OF CENTRAL INTELLIGENCE
FROM: HAFR E. FITZI.ATER
DEF UT', DIRECTOR FOR ADMINISTRATION
:UDJECT:
DDA 04-0046/4
14 DECENEER 1'DS4
WEEKLV PEFORT FOR PERIOD ENDING 14 DECENBER
. PROGRESS REFORTS ON TASKS ASSIGNED BV THE DrI/DDnI:
NONE.
2.
ITE./EVENT. F INTEREST:
25X1
25X1
A. DURING THE REFORTING FERIODs REFRESENTATIVES FFON TH.t7 E.77FIr-E OF
PERSONNEL FRESENTED BRIEFINGS TO CAREERISTS FROM THE OFFICE UF LE.:/Ei_DFN7NT FiNT.
ENGINEERING ANL THE OFFICE OF FINANCE ON 44HAT THE AGENCV IS DEIN: F:DOL.T
SUFFLEMENTAL RETIRENENT. DOTH GROUFS I.4ERE ENTHUSIASTIC 1FND FIFFF;SMIFITIV7 MF TH1:
RGENCV'S EFFORTS TO FROTECT AND ENHANCE THE RETIREMENT SVSTEM.
B. IN ORDER TO FROVILE OFEN SEASON ASSISTANCE TM RGENCV 7HF,LMV77c7r FIN
IN?7URANrE DIVISION/OP REFRESENTATIVE MANNED F,N INSURF,NME DESK IN TH7 MAIN
rORRIDOR AT HEALMUARTERS FRON 3 ? 7 DECEMBER. THE 1984 OFEN SEFIE=N VIL7M
FLAVEL rONTINUOUSLV FROM 10:00 A.M. TO 3:00 F.N. EFICH DF:V FIND Ei!_i7
REFRESENTATIVE HAS ANSI4ERED AFFROIMATELV 250 MUESTIONS. THROU'MH DEr7NEEF:v
TOTAL OF OFEN SEASON ACTIONS HAVE BEEN RECEIVED RESULTIN1-7, IN NET ,7F1IN Dr;
TO THE RSSOCIATION DENEFIT PLAN.
L. CAFETERIA RENOVATIONS CONTINUED LURING THE 1.4EEKEND THF7EF
12-HOt47 ThIFT. l4ERE I.iORKED BV THE GENERAL CONTRACTOR AND EV SULCMNTFTMF7,7
t'UFIFiG THE REFORTING FERIOD. THE FINAL TAFINGs FATCHINGs FIND SN75INM
OFERATIONS FOR THE NEI.4 CEILING IN THE NORTH CAFETERIA IS SCHEDUL_E FOF7 LATE
DECEMBER. IN THE SOUTH CAFETERIAs DEMOLITION OF THE CEILING FIR7F, FIND
IWzTALLATION OF THE NEI4 DRV HALL CEILING METAL HANGING SUFFORT 4FLK I*7
CONFLETE. THE FROCESS OF HANGING THE NEI.4 LRV HALL HAS BEGUN nir4r, FILREF1DV
NEARING COMFLETION IN THE SOUTH DAV AREA.
E. PLL HOT ASFHALT liORK ON THE BACK SIDE OF THE 7D Fir, CDRFIDDF:.77
1.4171'7 t?OMFLETED THE 1.4EEK OF 26 NOVEMBER. WORK HAS BEGUN ON THE :U- SIDEDF
7E rORRIDOR UF TO THE FLV1.400D BARRIER AND AFFROIMATELV HALF MF THE HT AFH--
FE.: ON THE FRONT SIDE OF THE 7D AND 7E CORRIDORS HFIS BEEN IMMNF:__ETED. RLL
TERRACE ROOFING 1.4ORK ON THE FRONT SIDE OF THE 7D CORRIDORS HILL LE DUNE DN
FiEEKENDS.
K. ON le DECEMBER MMODORE GRACE NURRV HOFFER ADDRESczEL
Ci;RRENTLV TAKING THE SURVEV OF INTELLIGENCE INFORMATION SVSTEM,7Ar
FUNDAMENTALS OF WORD PROCESSING COURSE SPONSORED BV THE OFFICE D7 TRAININT3 NT
EDUCATION. COMMODORE HOFFER'S VISIT AND REMARKS l4ERE AN INSFIRATnIINAL
HIGHLIGHT TO ALL STUDENTS AND INSTRUCTORS ATTENDING HER FRESENTATMN.
F. DDR CAREER Dr,vs5 SFONSORED BV THE DIRECTORATE OF ADNINISTFFITION