REPORT OF SIGNIFICANT LOGISTICS ACTIVITIES FOR PERIOD ENDING 13 DECEMBER 1984

Document Type: 
Collection: 
Document Number (FOIA) /ESDN (CREST): 
CIA-RDP87-00352R000200030022-0
Release Decision: 
RIPPUB
Original Classification: 
S
Document Page Count: 
3
Document Creation Date: 
December 22, 2016
Document Release Date: 
April 17, 2009
Sequence Number: 
22
Case Number: 
Publication Date: 
December 13, 1984
Content Type: 
MEMO
File: 
AttachmentSize
PDF icon CIA-RDP87-00352R000200030022-0.pdf86.4 KB
Body: 
Approved For Release 2009/04/17: CIA-RDP87-00352R000200030022-0 13 December 1984 MEMORANDUM FOR: Deputy Director for Administration FROM: Daniel C. King Director of Logistics SUBJECT: Report of Significant Logistics Activities for Period Ending 13 December 1984 aA.;nictratinn nn 13 December 1984. 1. Progress Report on Tasks Assigned by the DCI/DDCI: The tasking regarding proselyting of Agency employees is well under way. A clause for insertion in our contracts and an employment agreement for Agency employees have been prepared and forwarded to the Executive Director via the Deputy Director for 2. Events of Major Interest That Have Occurred During the Preceding Week: b. Cafeteria Renovations: Renovations continued during the weekend of 7 to 10 December 1984. Three 12-hour shifts were worked by the general contractor and by subcontractors. (1) North Cafeteria: No work was done in the North Cafeteria this week. The final taping, patching, and sanding operation for the new ceiling to accept the basecoat for the paint is tentatively scheduled to start on 21 December. 25X1 Approved For Release 2009/04/17: CIA-RDP87-00352R000200030022-0 Approved For Release 2009/04/17: CIA-RDP87-00352R000200030022-0 SUBJECT: Report of Significant Logistics Activities for Period Ending 13 December 1984 25X1 (2) South Cafeteria: Demolition of the ceiling area in the South Cafeteria is complete. The installation of the new dry wall ceiling metal hanging support work is complete. The hanging of the new dry wall ceiling has been completed up to the loft area in the middle bay area, and final sanding and patching operations were started. Dry wall hanging operations are nearing completion in the south bay area. Work is scheduled to resume on 14 December. c. Pedestrian Tunnel Repair: Eighty percent of the new sidewalk was poured the week of 3 December. Forming for the steps and sidewalk leading to the bus stop began on 6 December; however, due to low temperatures, the concrete pouring for these areas will be delayed until the end of the d. Seventh Floor Terrace and Penthouse Roof Replacement: All hot asphalt work on the back side of the 7D and 7E Corridors was completed the week of 26 November. Work began on the south side of the 7E Corridor (up to the plywood barrier) during the week of 26 November. Approximately half of the hot asphalt work on the front side of the 7D and 7E Corridors has been completed. All terrace roofing work on the front side of the 7D Corridors will be done on weekends. e. Agency Telephone Book: Now that the dylux proof has been approved for printing, the Printing and Photography publication. Although a lot of press and bindery work remains to be completed, P&PD is hopeful that the telephone book will be completed by the end of Division (P&PD), OL, is preparing to go to press with this 2 S E C R E T Approved For Release 2009/04/17: CIA-RDP87-00352R000200030022-0 Approved For Release 2009/04/17: CIA-RDP87-00352R000200030022-0 Approved For Release 2009/04/17: CIA-RDP87-00352R000200030022-0