INCREASED OUTDOOR LIGHTING AT HEADQUARTERS FACILITY
Document Type:
Collection:
Document Number (FOIA) /ESDN (CREST):
CIA-RDP87-01130R000100100020-7
Release Decision:
RIPPUB
Original Classification:
K
Document Page Count:
3
Document Creation Date:
December 16, 2016
Document Release Date:
July 13, 2005
Sequence Number:
20
Case Number:
Publication Date:
November 26, 1982
Content Type:
MF
File:
Attachment | Size |
---|---|
![]() | 89.24 KB |
Body:
Approved For Rase 2005/08/22 : CIA-RDP87-0113ORY00100100020-7
2 6 NOV 1992
STAT
MEMORANDUM FOR: Chief, Domestic Security Branch, PSD/OS
F ROM: I
ie , Headquarters Engineering Branch,
RECD/OL
SUBJECT: Increased Outdoor Lighting at Headquarters
Facility
STAT
1. This past August, our offices began to correspond
concerning the problem of insufficient outdoor lighting at the
Headquarters Compound. A recommended solution was to replace
existing mercury vapor lights with sodium lights in order to
create more intense continuous light while at the same time
drawing less power.
2. The Headquarters Engineering Branch (HEB) consulted
with General Electric to examine possible solutions and
several. options were discussed with your office. It is re-
commended that in insufficiently lit areas, existing 400 watt
mercury vapor light fixtures be replaced with new 200 watt
high-pressure sodium fixtures, adding arms and new fixtures to
some existing one-armed standards, replacing existing floodlights
with new high-pressure sodium floods, also adding new floodlights
at the rotor pool and the powerhouse, and new standards at the GW
Parkway entrance. It is estimated that this work will cost $245K
in 1985 dollars: a breakdown per area is attached.
3. Per earlier discussion, there was a question about
obtaining approval from the Agency Fine Arts Committee and the
National Capital Planning Commission in order to change outdoor
lighting to a sodium type. The Fine Arts Committee has reviewed
the proposed scope of this project and has no objections.
According to the charter of the National Capital Planning
Commission, this project does not appear to be one requiring
their review.
4. Please contact
questions.
with any STAT
STAT
Approved For Release 2005/08/22 : CIA-RDP87-0113OR000100100020-7
Approved For-release 2005/08/22 : CIA-RDP87-01130' b00100100020-7
COMPOUND LIGHTING ESTIMATE
Powerhouse
20K
Motor Pool
55K
Heliport
30K
Loading Docks
15K
Guard 123
30K
GW Parkway
65K
Perimeter
30K
245K
Approved For Release 2005/08/22 : CIA-RDP87-01130R000100100020-7
Approved For Release 2005/08/22 : CIA-RDP87-0113OR000100100020-7
TRANSMITTAL SLIP
I BUILDING
i
0a
F/7
FORM N0. 241
1 FES 55
Approved For Release 2005/08/22 : CIA-RDP87-0113OR000100100020-7