NPIC HANDBOOK (Sanitized) MANAGEMENT INFORMATION SYSTEM PROCEDURES
Document Type:
Collection:
Document Number (FOIA) /ESDN (CREST):
CIA-RDP87B00832R000100010088-3
Release Decision:
RIPPUB
Original Classification:
S
Document Page Count:
46
Document Creation Date:
December 19, 2016
Document Release Date:
October 26, 2005
Sequence Number:
88
Case Number:
Publication Date:
August 1, 1965
Content Type:
REQ
File:
Attachment | Size |
---|---|
![]() | 1.74 MB |
Body:
~~~~~
ApS~ECRE~Tor Release 2005/11/28 :CIA-RDP87B00832R000100010088-~~
NPIC HANDBOOK
MANAGEMENT INFORMATION
SYSTEM PROCEDURES
Declassification Review ~by NGA
GROUP 1 EXCLUDED FROM
AUTOMATIC DOWNGRADING
AND DECLASSIFICATION
Approved For R~~~~5/11/28:CIA-RDP87B00832RC~0100010088-3
Approved For Release 2005/11/28 :CIA-RDP87B00832R000100010088-3
This document ly
8 z
o5o
s.o
13. Total Time
,4, o D
0 50
50
~Q
~~
8
V.
~Q
For Time and Attendance Record
Sun
Mon
Tue
Wed
Thur
Fri
Sat
Overtime Clock Hours
1~}
From
/ Q Q
,
To
30
C
Leave Cl
ck M
From
0800
/00
o
ours
IJ.
To
iooo
/630
Approved For Release 2005/1 ~/~CRET -RDP87B00832R000100010088-3
Approved For Release 2005/11F~~~~P!-RDP87B00832R000100010088-3
SECRET
(When Filled In)
1. Attached. are the weekly time sheets for component 800
2. For the week ending 050265
3. The current total number of persons assigned to this component
is 6 A sheet is enclosed for each person.
4. These time sheets have been verified for correct personnel,
component, project, activity and time data.
(j `-~ ~~~ ~~ ~~~
,ivision or to
Management Information Coordinator
SECRET
(When Filled In)
Approved For Release 2005/11Y2~8'~~A-RDP87B00832R000100010088-3
Approved For Release 2005/1~~R~TA-RDP87B00832R000100010088-3
APPENDIX B.
CODES AND DEFINITIONS
Approved For Release 2005/1J~~~TA-RDP87B00832R000100010088-3
Approved For Release 2005/11/~~~~~RDP87B00832R000100010088-3
The project number consists of five digits from one of the blocks shown below, which indicate
the project type, followed by one or two letter suffixes as needed and a numeral indicating the
fiscal year (e.g. 55276AA5). If suffixes are not needed their positions will be left blank.
Indirect Departmental
PI Support
*See NPIC regulation 51 - 1 for definitions of these project types.
2. National in scope
3. Involves PI or is primarily
in support of PI s
1. Generated by internal need
(No requirement)
2. National in scope
3. Involves no PI and is not
primarily in support of PI s
1. Generated by internal need
(No requirement)
2. Departmental in scope
3. Involves PI
Approved For Release 2005/11f~~/~-RDP87B00832R000100010088-3
25X1 gpproved For Release 2005/11/28 :CIA-RDP87B00832R000100010088-3
Next 1 Page(s) In Document Exempt
Approved For Release 2005/11/28 :CIA-RDP87B00832R000100010088-3
Approved For Release 2005/11~$C~ RDP87B00832R000100010088-3
6. BF - Detailed Exploitation Electron-
ics or Commo--comprises electronics andcom-
munications installations except missile-asso-
ciated installations; e.g., radar and communica-
tions sites; space program tracking stations;
VLF sites; etc.
7. BG ?- Detailed Exploitation Indus-
try--comprises industrial facilities and activ-
ities except those included under codes BA,
BC, and BE; e.g., mining; heavy equipment
plants; steel plants; aircraft fabrication; rail-
road equipment production; chemicals produc-
tion; oil refineries; aircraft engine production;
shipyards; agricultural products plants; am-
munition and explosives manufacturing, etc.
8. BH - Detailed Exploitation Basic
Services--comprises roads, power plants,
dams, railroad lines (except missile transload-
ing points), etc.
9. BK - Detailed Exploitation Port or
Harbor--comprises overall exploitation of a
port or harbor which is at least partially non-
military.
10. BM - Detailed Exploitation Research
& Development--comprises all research and de-
velopment activities and installations except
those included under codes BA, BC, and BE.
11. BN - Detailed Exploitation Storage--
comprises storage sites and facilities except
those included under codes BA, BB, BD, and
12. BP - Detailed Exploitation Urban
Complex--comprises PI studies of significant
installations within an entire urban complex.
13. BR - Detailed Exploitation Miscel-
laneous--comprises area studies and identifi-
able sites; installations, and activities that
cannot be categorized elsewhere under "de-
tailed exploitations."
14. BS - Detailed Exploitation Unidenti-
fied Activity--comprises sites, installations, or
areas at which the type of activity is not iden-
tifiable.
C. Other Specific Projects
1. CA - Graphic PI Project--a project
requiring the services of a photographic inter-
preter in which the final product will be a
graphic(s); e.g., briefing boards.
2. CC - Periodic Formatted Publica-
tions--a project requiring the services of a
photographic interpreter in which the final
product will be publications, issued at regular
intervals, with unusual or special formats and
which cannot be categorized as standard "im-
mediate" or "detailed" exploitations; e.g., Viet-
nam hamlet study.
3. CE - Briefing or Other Presenta-
tions--a briefing or other formal presentation
and all related support; e.g., regular "working
group" briefings; county fairs, etc.
4. CG - Miscellaneous PI Project--a
project which requires the services of a pho-
tographic interpreter but which cannot be catego-
rized as an "immediate" or "detailed" exploi-
tation, a graphic PI project, or a periodic for-
matted publications project.
5. DA - Photogrammetric Study - non-
production-type projects primarily requiring
photogrammetric analysis, such as error anal-
ysis studies, preparation of camera system
technical manuals, development of math models,
etc.
6. DC - Mission Analysis -TAB pro-
jects entitled Photogrammetric Analysis Mis-
sion _ __ _
7. DE - Mission Technical Services -
TSB projects entitled Technical Services Mis-
sion .
8. DG - Technical Support - projects
requiring a wide variety on non-routine work,
such as technical briefing boards, preparation
of special-purpose maps, providing statistics,
camera calibration, etc.
9. DK - Evaluation Study - mission
Approved For Release 2005/11/~:~k~DP87B00832R000100010088-3
Approved For Release 2005/1g,~R~A-RDP87B00832R000100010088-3
t
evaluations (PERs) and evaluations of train-
ing and test missions.
10. DM - Mission Performance Evalua-
tion Support -projects in response to outside
requests for mission performance studies and
data, such as PET support.
11. EA - Graphics Preparation (Non-PI)
--a project requiring graphic work but not re-
quiring the service of a photographic inter-
preter.
12. EC - Edit--a project requiring only
editorial support.
13. EE - Miscellaneous Publication Pro-
ject--a project requiring production of a publi-
cation in which the services of a photographic
interpreter are not requested and which is not
a formal NPIC technical report produced under
TID chairmanship.
14. FA - Photo Lab--a project request-
ing only PSD Photographic Laboratory Branch
support.
15. FC - Reproduction & Printing --a
project requesting only PSD Reproduction and
Printing Branch support.
16. FE - Information Control (Film File
& Courier)--a project requesting only PSD In-
formation Control Branch support.
17. FG - Miscellaneous Production Serv-
ices Project--a project requesting only PSD
work and which cannot be categorized as FA,
FC, or FE.
18. GA - Computer Programming and
Systems Analysis--a project requiring computer
programming by a professional programmer or
the services of a professional systems analyst.
19. GE - Computer Service--a project
requesting computer outputs from IPD.
20. GG - Minicard Service-- a project
requesting minicard outputs.
21. GK - Miscellaneous Data Service--
categorized in GA, GC, GE, or GG.
22. HA - Reference System Design--a
project requesting design or innovation of a sys-
tem for coding, classifying, storing, and/or re-
trieving reference material other than computer
programming (GA) or systems analysis (GC)
work.
23. HC - Update Reference Materials--a
project requesting the updating of all types of
reference materials, except for automatic, pe-
riodic, programmed ADP operations.
24. HE - Research (ADP)--a collateral
support project requesting machine or com-
puter stored data furnished by ADP methods.
25. HG - Collateral Research--a project
requesting collateral research and support and
not answerable by ADP methods.
26. HK - Miscellaneous Collateral Sup-
port Project--a project requesting collateral
support which cannot be categorized in HA,
HC, HE, or HG.
27. KA - Equipment Development -- a
project involving research and/or development
work on hardware or equipment.
28. KC - Recon System Project--a pro-
ject involving identification and evaulation of
an image-forming collection system.
29. KE - Planning Study--a project re-
questing a specific planning study by P&DS
which cannot be categorized in KA, KC, or
a
i
t
t
i
0
t
t
t
t,~
30. KF - Laboratory Research--a pro-
ject involving basic laboratory investigation.
31. I