OL/NBPO WEEKLY REPORT - PERIOD ENDING 23 JULY 1986

Document Type: 
Collection: 
Document Number (FOIA) /ESDN (CREST): 
CIA-RDP89-00063R000200190013-2
Release Decision: 
RIPPUB
Original Classification: 
K
Document Page Count: 
1
Document Creation Date: 
December 27, 2016
Document Release Date: 
November 8, 2011
Sequence Number: 
13
Case Number: 
Content Type: 
MISC
File: 
AttachmentSize
PDF icon CIA-RDP89-00063R000200190013-2.pdf60.94 KB
Body: 
Declassified in Part - Sanitized Copy Approved for Release 2011/11/08: CIA-RDP89-00063R000200190013-2 OL/NBPO WEEKLY REPORT - PERIOD ENDING 23 JULY 1986 STAT 1. Progress Reports on Tasks Assigned by the DCI/DDCI: None. 2. Items or Events of Major Interest That Have Occurred During the Preceding Week: a. A representative from the New Building Project Office (NBPO), OL, is at the Exide Company factory in Raleigh, N.C. this week for the testing of the third and fourth uninterruptible power system that will be installed in the New Headquarters Building (NHB). The first two systems are already on site. The third and fourth systems will be shipped upon successful completion of the tests. A total of eight 1000KVA systems will be installed in the NHB. b. Traffic was diverted onto the temporary roadway of the Route 123 entrance on 18 July,3*-. Prior to instituting this action, practice runs by cars, large trucks, buses, and the local fire department were made to ensure adequate clearance for vehicles. This condition is expected to remain in effect while the New Headquarters Building Expansion STATE digs a'large trench for utility services. L'L crty c. Heavy rains on 20 July-l566 caused limited damage at the New Headquarters Building (NHB) construction site. Employees were inconvenienced when mud from the site washed into the South Parking Lot. The ground, first, and second floors of the NHB had 2-3 inches of water in ~_. The North Tower which is in the process of being closed in laces most , p . suffered the least damage since the newly installed inner windows limited the amount of rain entering that area. Some shielding on the North Tower STAT penthouse roof was damaged by the high winds. 3. Events Anticipated During the Coming Week: STAT Chief, New Building Project Office D/OL C/FMD/OL Declassified in Part - Sanitized Copy Approved for Release 2011/11/08: CIA-RDP89-00063R000200190013-2 aite-eead