OL/NBPO WEEKLY REPORT - PERIOD ENDING 23 JULY 1986
Document Type:
Collection:
Document Number (FOIA) /ESDN (CREST):
CIA-RDP89-00063R000200190013-2
Release Decision:
RIPPUB
Original Classification:
K
Document Page Count:
1
Document Creation Date:
December 27, 2016
Document Release Date:
November 8, 2011
Sequence Number:
13
Case Number:
Content Type:
MISC
File:
Attachment | Size |
---|---|
![]() | 60.94 KB |
Body:
Declassified in Part - Sanitized Copy Approved for Release 2011/11/08: CIA-RDP89-00063R000200190013-2
OL/NBPO WEEKLY REPORT - PERIOD ENDING 23 JULY 1986
STAT
1. Progress Reports on Tasks Assigned by the DCI/DDCI:
None.
2. Items or Events of Major Interest That Have Occurred During the
Preceding Week:
a. A representative from the New Building Project Office (NBPO),
OL, is at the Exide Company factory in Raleigh, N.C. this week for the
testing of the third and fourth uninterruptible power system that will be
installed in the New Headquarters Building (NHB). The first two systems
are already on site. The third and fourth systems will be shipped upon
successful completion of the tests. A total of eight 1000KVA systems will
be installed in the NHB.
b. Traffic was diverted onto the temporary roadway of the
Route 123 entrance on 18 July,3*-. Prior to instituting this action,
practice runs by cars, large trucks, buses, and the local fire department
were made to ensure adequate clearance for vehicles. This condition is
expected to remain in effect while the New Headquarters Building Expansion
STATE digs a'large trench for utility services.
L'L crty
c. Heavy rains on 20 July-l566 caused limited damage at the New
Headquarters Building (NHB) construction site. Employees were
inconvenienced when mud from the site washed into the South Parking Lot.
The ground, first, and second floors of the NHB had 2-3 inches of water in ~_.
The North Tower which is in the process of being closed in
laces
most
,
p
.
suffered the least damage since the newly installed inner windows limited
the amount of rain entering that area. Some shielding on the North Tower
STAT
penthouse roof was damaged by the high winds.
3. Events Anticipated During the Coming Week:
STAT
Chief, New Building Project Office
D/OL
C/FMD/OL
Declassified in Part - Sanitized Copy Approved for Release 2011/11/08: CIA-RDP89-00063R000200190013-2