REPORT OF SIGNIFICANT LOGISTICS ACTIVITIES FOR THE PERIOD ENDING 16 SEPTEMBER 1986
Document Type:
Collection:
Document Number (FOIA) /ESDN (CREST):
CIA-RDP89-00063R000200210016-6
Release Decision:
RIPPUB
Original Classification:
S
Document Page Count:
4
Document Creation Date:
December 27, 2016
Document Release Date:
June 10, 2011
Sequence Number:
16
Case Number:
Publication Date:
September 17, 1986
Content Type:
MEMO
File:
Attachment | Size |
---|---|
![]() | 137.34 KB |
Body:
Sanitized Copy Approved for Release 2011/06/10: CIA-RDP89-00063R000200210016-6
17 September 1986
MEMORANDUM FOR: Deputy Director for Administration
FROM: John M. Ray
Director of Logistics
SUBJECT: Report of Significant Logistics Activi e for
the Period Ending 16 September 1986
1. Events of Major Interest That Have Occurred During the
Preceding Week:
a. In response to the Directorate of Administration's
Planning Officer's inquiry, the Office of Logistics (OL) completed a
survey of contracting activity identifying examples of support to
b. In response to a DDA Management Staff request, OL is
coordinating a review of the New Building Support Budget for FY 88
and the outyears. This task is in response to a Congressional
request that the entire New Building Support Program be reviewed to
determine where costs could be reduced.
c. OL reports that the resurfacing of the north lot at
Headquarters began on 15 September. Lanes A through C will be
blocked off for about three weeks to permit removal of islands'
installation of new light fixtures, and resurfacing the lot.
d. OL reports that the temporary guardpost at the George
Washington Memorial Parkway gate was erected in preparation for
construction of the New Security Control Center. Excavation for
footings wi in the last week in September for the new
structure.
e. OL reports that installation of the exterior curtain
wall glass on the New Headquarters Building was started this week.
Sanitized Copy Approved for Release 2011/06/10: CIA-RDP89-00063R000200210016-6
Sanitized Copy Approved for Release 2011/06/10: CIA-RDP89-00063R000200210016-6
S E C 'Z E T
Upon completion of this segment, scheduled for November, the Center
25X1
25X1
25X1
25X1
25X1
25X1
25X1
25X1
and North Sections will be sealed from the weather.
f. OL reports that the New Headquarters B
uilding Bid
cate a chilled
Package No. 2 contractor continued excavating to lo
water leak on the South side chilled water mains.
* g. OL reports that several meetings have been held recently
to discuss a potential proble on the north
penthouse roof of the New Headquarters Building (NHB).
h. D,.~ ry and Davis the architects for Routes 123/193
redesign, a_ INedule a dry 'fun for OL of a briefing for the
Evermay Community. The briefing will the specific design of
Section 7 of the Evermay community.
i. OL reports that~ Building experienced a power outage
on 8 September at 11:00 a.m. for approximately four hours, which was
due to a broken overhead line serving the facility. Q& pefsaazwi6l I-+ was
discovered that the emergency
generator not starta.d.'Re airs were made to the generator and
then placed back in service
j. OL reports that in support of the OIT Secure Grid,
Contel has started conduit installation for NPCPO/OIT in the 2D and
2C corridors of the Headquarters building. With the exception of B
corridor, all corridor ceilings on the second floor will be lowered
to permit the conduit installation.
k. On 11 Septem Room prepared a
retirement rece tion for The reception
was held
1. 0 ; re ort that tfi' leas.-r appr, ately.a~^22~, 099:-
square feet w re u e ace to ppo t tY `Off c,y?Of Se Pity,
t
t` was signed on
Plain Text r,Qc s ng ipment equire
d
10 Septombe e., 0,
e
succeeding lease agreement between the
m. OL report ata
General Services Administration (GSA) and the Key Building lessor
t,,,aj~ executed. The four-year lease term extends from 1
25X1 January 1986 through 31 December 1989.
Sanitized Copy Approved for Release 2011/06/10: CIA-RDP89-00063R000200210016-6
Sanitized Copy Approved for Release 2011/06/10: CIA-RDP89-00063R000200210016-6
25X1
LJ/~ I
25X1
ff.
contract has been awarded and work is scheduled to start the week of
29 September. The work will be done in phases with the basement
being first and the first floor in two sections. The contract has
an incentive fee of $2,000 per day for completion before`?S heduled d 4
o. OL representatives met with representatives of Gates
Hudson & Associates on 15 September 1986. The purpose of
meeting was to provide a schedule for removing asbestos.
s. OL has solicited quotations for lease and installation
of a temporary security fence around the Reston compound. The
fencing will encompass the buildings, and front parking areas during
construction, and will subseglue_n_tl_Y be removed. Installation is
25,X1
...
d b
o....L.... b
t
ace
e
y 30
Sanitized Copy Approved for Release 2011/06/10: CIA-RDP89-00063R000200210016-6