FACILITIES MANAGEMENT DIVISION WEEKLY REPORT FOR PERIOD ENDING 6 NOVEMBER 1986

Document Type: 
Collection: 
Document Number (FOIA) /ESDN (CREST): 
CIA-RDP89-00063R000200230039-9
Release Decision: 
RIPPUB
Original Classification: 
C
Document Page Count: 
4
Document Creation Date: 
December 27, 2016
Document Release Date: 
June 16, 2011
Sequence Number: 
39
Case Number: 
Content Type: 
MISC
File: 
AttachmentSize
PDF icon CIA-RDP89-00063R000200230039-9.pdf157.07 KB
Body: 
Sanitized Copy Approved for Release 2011/06/16: CIA-RDP89-00063R000200230039-9 FACILITIES MANAGEMENT DIVISION WEEKLY REPORT FOR PERIOD ENDING 6 NOVEMBER 1986 1. Status of Tasks Assigned by Senior Management: a. Work continued on surveying the home of the DCI. !'ya The Chief, Design Branch, has spent approximately 25 hours documenting the existing conditions. He worked 31 October and lete the on_site documen+ t n? A. most of 1 November to com p 25X1 2. Major Events That Have Occurred During the Preceding Week: a. On 28 October 1986, four night jobs were accomplished: four lockers were assembled and 30 pieces of furniture were PTI'd for IC Staff, F Street; offloaded and delivered 13 conservafiles and tops for DDI/MPSS; offloaded and delivered 37 pieces of Corry Jamestown furniture to 1D23, IMS/DDO and 20 pieces of existing furniture items were PTI'd; inspected the corridors picking up 85 pieces of excess 25X1 furniture which was loaded onto the Truck. A total of 55 staff and 83 Kane overtime manhours were used. b. On 29 October 1986, three night jobs were completed: 74 pieces of Corry Jamestown furniture were delivered to EA Division and 30 pieces of furniture were PTI'd; 16 pieces of furniture to IMS/DDO and 10 pieces of furniture t) were PTI'd; 100 boxes of carpet was delivered to Chamber of Commerce for OTE and 55 chairs were PTI'd. A total of 25 staff and 59 Kane overtime manhours were expended. 25X1 0 25X1 c. On 1 November, two jobs were managed: 40 boxes of Wang equipment, 15 conservafiles, and three secretarial desks were offloaded for DDO/NE; and 105 square yards of carpet tiles were installed for OTE. A total of 54 staff overtime manhours were expended. Sanitized Copy Approved for Release 2011/06/16: CIA-RDP89-00063R000200230039-9 Sanitized Copy Approved for Release 2011/06/16: CIA-RDP89-00063R000200230039-9 ~;UNI'1DENTIAL e. The Passenger Vehicle Section has received 25X1 memorandums requesting transportation for passengers via } special runs during the forthcoming week. Gonselialution staff 1.11 nationally known architect-engineer firms or i4enttTted design of the backfill and upgrade of the Old Headquarters 't Building. A solicitation letter is being prepared with response due 21 November. The responding firmswill be ranked in order of technical expertise and the top four to six firms will be interviewed for final ranking and selection. j. Mr. Gary Wallace, Vice President of Ogden Allied Services Corporation, met with the Chief, Operations, FMD, to formulate Allied team organization and milestone actions for U this contract. The Allied site manager and project officer, as well as the Agency contracting officer and COTR. wex7 then 25X1 briefed on both areas of concern. Sanitized Copy Approved for Release 2011/06/16: CIA-RDP89-00063R000200230039-9 Sanitized Copy Approved for Release 2011/06/16: CIA-RDP89-00063R000200230039-9 .ONFIDENTIAL k. The Office of Security has requested additional physical securi,ty,protection for the M4: Ent a~ e. A scope of _ _ ~ iP_ ~L -_-.fic-1t_ii V19&' i- ~..~ a '"!'! ..t' ;.~...7-Y,' L. _ 2 L _ _ r k n s rs. The upgrade consists of installing static barriers under the front entrance canopy, replacing the VIP lot guard house, and modifying the grassy area fronting the 1. The Employee Art Exhibit is displayed in the FAC Exhibit Hall, 1D corridor, Headquarters, for the month of November. The Interior Design Staff set up the hall and Pro 11 publicity for the EAA activity. m. On 3 and 4 November, the Interior Design Consultant assisted the DDA Executive Officer in screening potential sculptors for a DCI project to commemorate General 3. Upcoming Events: a. The New North Dock will not be opening until circa 1 December 1986 vice early November as originally planned. The delay in opening is due to the large number of items the contractor must correct before NBPO will approve acceptance of the North Dock. b. A work request is being prepared by Building Services Branch to have the incinerator removed from the basement. The room will be utilized for either a new incinerator or for storage. c. The Design Branch will be working on a package to install a computer equipment room for the DCI Wang Alliance System. This work is also in support of electrical upgrading performed by Maintenance Branch, FMD. d. The Interior Design Consultant arranged for the reupholstery of lounge pieces in the DDCI office and the purchase of new 18th century style conference chairs. Reupholstery is scheduled for the week of 21 November. Sanitized Copy Approved for Release 2011/06/16: CIA-RDP89-00063R000200230039-9 Sanitized Copy Approved for Release 2011/06/16: CIA-RDP89-00063R000200230039-9 'ONFIDENTIAL 4. Management Activities and Concerns: a. lof Building Services Branch will maintain contact with various offices to ensure customer satisfaction and to increase employee awareness within BSB of the quality control procedures being monitored. b. On Tuesday, 4 November, the Chief and Deputy Chief of the Motor Pool Branch, are scheduled to attend a Skills Workshop Program on the Procurement of Automobiles and Leasing to be held at theF ]Building. c. FMD management has continued their efforts on getting the backfill, ILSP and cafeteria projects up to speed. Briefings were prepared and presented to the Director of Logistics and we are currently preparing a briefing for the DDA. d. Personnel changes during the period 29 October through 5 November were as follows: DEPARTURES: BSB Resigned MPB Resigned ARRIVALS: OPS OPS 10/27/86 10/27/86 Chief Facilities Management Division, OL Sanitized Copy Approved for Release 2011/06/16: CIA-RDP89-00063R000200230039-9