REPORT OF SIGNIFICANT LOGISTICS ACTIVITIES FOR THE PERIOD ENDING 07 APRIL 1987

Document Type: 
Collection: 
Document Number (FOIA) /ESDN (CREST): 
CIA-RDP89-00063R000300280027-6
Release Decision: 
RIPPUB
Original Classification: 
S
Document Page Count: 
5
Document Creation Date: 
December 23, 2016
Document Release Date: 
December 10, 2012
Sequence Number: 
27
Case Number: 
Publication Date: 
April 8, 1987
Content Type: 
MEMO
File: 
AttachmentSize
PDF icon CIA-RDP89-00063R000300280027-6.pdf125.75 KB
Body: 
I Declassified in Part - Sanitized Copy Approved for Release 2012/12/10: CIA-RDP89-00063R000300280027-6 8 April 1987 MEMORANDUM FOR: Deputy Director for Administratio Director of Logistics SUBJECT: Report of Significant Logistics Activities for the Period Ending 07 April 1987 25X1 1. Events of Major Interest That Have Occurred During the Preceding Week: for the Analyst File Environment Project (SAFE). In addition, OL issued a contract modification to Infodata Systems, Inc., providing additional funding in the amount of for augmentations for the INQUIRE Database Management System software in support of the SAFE project of the Office of Information Technology. 25X1 25X1 c._On 1 April, OL issued two contracts to IBM Corporation totaling These contracts are for the acquisition of five Model 3090 Computer 25X1 Processing Systems and peripheral devices in support of the Office of Information Technology's and Defense Intelligence Agency's computing requirements. All units are scheduled by July 1987. 25X1 * d. OL reports that a contract was awarded to Mr. Lawrence Ludtke in the amount of o design, create, and install a bronze statue of General William Donovan at the Headquarters building. The work will be accomplished in Declassified in Part - Sanitized Copy Approved for Release 2012/12/10: CIA-RDP89-00063R000300280027-6 Declassified in Part - Sanitized Copy Approved for Release 2012/12/10: CIA-RDP89-00063R000300280027-6 four stages, with Agency approval on a 24-inch model and again on a life-sized clay model. The finished statue is expected by 15 October 1988. 25X1 e. OL reports that the following Headquarters Claims Review Board personal property claims for March 1987 is as follows: Received 20 Adjudicated 24 Denied Amount Claimed: Amount Paid: 1. OL reports that the Transportation Management Branch, Logistics Operations Center, made a comparison study of long-haul mileage for the period 1 April 1986 to 31 March 1987. Over-the-road vehicles have logged 149,420 miles in the last six months, an increase of 19,946 miles over the prior six months.FI 25X1 Declassified in Part - Sanitized Copy Approved for Release 2012/12/10: CIA-RDP89-00063R000300280027-6 Declassified in Part - Sanitized Copy Approved for Release 2012/12/10: CIA-RDP89-00063R000300280027-6 m. OL reports that the DCI's office suite located in the Executive Office Building was painted on 5 April by General Services Administration's White House Work Group. 25X1 5X1 o. In order to reduce morning rush-hour congestion near the George Washington Memorial Parkway entrance, CL reports that the traffic traveling around the Headquarters compound ring road from the Route 123 entrance towards the west parking lot area is being diverted through the north parking lot. The detour is in effect from 0715 to 0900 hours and will last approximately two months. F__1 25X1 q. OL reports that a General Services Administration (GSA) representative conducted an inspection on 2 April of the second-floor roof of the Headquarters Building. The inspection concluded that the roof was in need of major repairs. The estimated cost of these repairs is in excess of $1 million. 25X1 25X1 Declassified in Part - Sanitized Copy Approved for Release 2012/12/10: CIA-RDP89-00063R000300280027-6 25X1 Declassified in Part - Sanitized Copy Approved for Release 2012/12/10: CIA-RDP89-00063R000300280027-6 Declassified in Part - Sanitized Copy Approved for Release 2012/12/10: CIA-RDP89-00063R000300280027-6 Declassified in Part - Sanitized Copy Approved for Release 2012/12/10: CIA-RDP89-00063R000300280027-6 f. OL reports that there will be a total Headquarters compound steam outage on Saturday, 11 April, from 0600 to 1500 hours. The purpose of the outage is to perform work on the hot-water tank in the P&PD Building and repair some steam leaks at the Central Plant and the Headquarters Building. There will be a partial Headquarters Building power outage on 11 April from 2330 hours to 0430 on 12 April. The purpose of the outage is to make necessary repairs to the electrical switchgear in the "D" vault, conduct maintenance, and install one new power panel. The outage will affect all lighting and receptacles. An Employee Bulletin was distributed. 25X1 25X1 Declassified in Part - Sanitized Copy Approved for Release 2012/12/10: CIA-RDP89-00063R000300280027-6