SLBM ACTIVITY CHINA

Document Type: 
Document Number (FOIA) /ESDN (CREST): 
CIA-RDP89-00121R000300540003-8
Release Decision: 
RIPPUB
Original Classification: 
S
Document Page Count: 
6
Document Creation Date: 
December 28, 2016
Document Release Date: 
February 25, 2011
Sequence Number: 
3
Case Number: 
Publication Date: 
March 31, 1982
Content Type: 
REPORT
File: 
AttachmentSize
PDF icon CIA-RDP89-00121R000300540003-8.pdf162.87 KB
Body: 
Sanitized Copy Approved for Release 2011/02/25: CIA-RDP89-00121 R000300540003-8 Iq Next 1 Page(s) In Document Denied Sanitized Copy Approved for Release 2011/02/25: CIA-RDP89-00121 R000300540003-8 Sanitized Copy Approved for Release 2011/02/25: CIA-RDP89-00121 R000300540003-8 ROUTING TO: NAME AND ADDRESS DATE INITIALS 1 2 irec or 3 Room 4 ACTION DIRECT REPLY PREPARE REPLY APPROVAL DISPATCH RECOMMENDATION COMMENT FILE RETURN CONCURRENCE INFORMATION SIGNATURE REMARKS: FROM: NAME, ADDRESS, AND PHONE NO. DATE SECRET (Security Classification) (See inside cover) 25X1 CONTROL NO. z- 50 Copy .27 Warning Notice Intelligence Sources and Methods Involved NATIONAL SECURITY INFORMATION Unauthorized Disclosure Subject to Criminal Sanctions SECRET (Security Classification) 11 - Sanitized Copy Approved for Release 2011/02/25: CIA-RDP89-00121 R000300540003-8 1'.. II I ...1 1. I. .I I I I .I. 1 I 1'I I Sanitized Copy Approved for Release 2011/02/25: CIA-RDP89-00121 R000300540003-8 Warning Notice Intelligence Sources and Methods Involved (WNINTEL) or (D) NATIONAL SECURITY INFORMATION Unauthorized Disclosure Subject to Criminal Sanctions DISSEMINATION CONTROL ABBREVIATIONS NOFORN- Not Releasable to Foreign Nationals NOCONTRACT- Not Releasable to Contractors or Contractor/Consultants PROPIN- Caution-Proprietary Information Involved USIBONLY- USIB Departments Only ORCON- Dissemination and Extraction of Information Controlled by Originator REL ... This Information has been Authorized for Release to .. . Sanitized Copy Approved for Release 2011/02/25: CIA-RDP89-00121 R000300540003-8 Sanitized Copy Approved for Release 2011/02/25: CIA-RDP89-00121 R000300540003-8 SECRET Page 1 of Copy L7 (c) NATIONAL PHOTOGRAPHIC INTERPRETATION CENTER Attachment to Z-10508/82 NPIC/PEG (3/82) 2 PART GRAPHIC 1. (S/D) SIGNIFICANCE: ACTIVITY ASSOCIATED WITH THE DEVELOPMENT OF CHINA'S SUBMARINE-LAUNCHED BALLISTIC MISSILE (SLBM) SYSTEM IS OBSERVED AT TWO MAJOR RESEARCH AND DEVELOPMENT FACILITIES. MISSILE CHECKOUT ACTIVITY IS IN PROGRESS AT WUZHAI SSM SUPPORT FACILITY AND TEST-RELATED ACTIVITY IS UNDERWAY 25X1 AT HSIAO-PING-TAO SLBM SUPPORT FACILITY 25X1 L. (S/D) REMARKS: AT THE WUZHAI SSM SUPPORT FACILITY (GRAPHIC 1 OF 2), PREPARATIONS FOR THE FOURTH FLIGHT TEST OF THE WU-1 SLBM ARE IN PROGRESS. A WU-1 SLBM MISSILE CANISTER ON A DOLLY IS ON THE APRON IN FRONT OF AN ASSEMBLY AND CHECKOUT BUILDING IN THE CSS-2 MRBM CHECKOUT AREA. CANISTER END-CAPS ARE ON THE GROUND NEXT TO THE CANISTER. A WU-1 CANISTER TRANSPO RTER AND A TRUCK- MOUNTED CRANE ARE NEAR THE DOLLY. THIS ACTIVI TY SUGGES TS THAT T HE WU-1 MISSILE CHECKOUT PROCESS, UNDERWA Y SINCE 1 MARCH 1 982, MAY BE ENTERING ITS FINAL PH ASES AND TH AT THE MI SSILE MAY BE MOVED TO THE WUZHA R&D/TR AINING LA UNCH TEST SITE Al/A2/A3 FO R 25X1 REHERS (S/D) E AL OF LAU VIDENCE NCH PROCE THAT A WU DURES. -1 MISSILE HAD BEEN DELIVERED WUZHAI MISSILE TEST COMP LEX WAS 25X1 OBSERV ED AT WUZ HAI SUPPO RT ARF.A - WHEN A 25X1 WU-1 THREE-RAILCAR TRAIN WAS ON A RAIL SIDING. PREVIOUS WU-1 LAUNCH CYCLES HAVE VARIED FROM 30 TO 63 DAYS AFTER ARRIVAL OF THE MISSILE AT THE COMPLEX. IN ADDITION, ELECTRONICS/TRACKING ACTIVITY ASSOCIATED WITH THE UPCOMING WU-1 SLBM LAUNCH HAS BEEN OBSERVED AT YINCHUAN SSM/SPACE TRACKING FACILITY 1 AND YINCHUAN SSM/SPACE TRACKING FACILITY 2 25X1 FIRE CAN RADAR VANS AND ASSOCIATED ELECTRONICS SUPPORT VEHICLES HAVE BEEN OBSERVED AT BOTH FACILITIES. These notes have been prepared for briefing purposes only and should not be used for detailed ana- lytical work. Their use should be restricted to the particular briefing board(s) they were prepared for and must be considered valid only for the reporting period a; indicated by the date of issue. WARNING NOTICE Intelligence Sources and Methods Involved SECRET 11 Sanitized Copy Approved for Release 2011/02/25: CIA-RDP89-00121 R000300540003-8 Sanitized Copy Approved for Release 2011/02/25: CIA-RDP89-00121 R000300540003-8 SECRET (c) NATIONAL PHOTOGRAPHIC INTERPRETATION CENTER Page 2 of 1 Copy ~7 (S/D) AT HSIAO-PING-TAO SLBM SUPPORT FACILITY (GRAPHIC 2 OF 2), TEST-RELATED ACTIVITY IS UNDERWAY. ONE POSSIBLE WU-1 AIRFRAME/MOCKUP, ONE UNIDENTIFIED CYLINDER, ONE WU-1 CANISTER TRANSPORTER, ONE PROBABLE ELECTRONICS VAN, AND THREE BUSES ARE NEAR THE MAIN CHECKOUT BUILDING. THE AIRFRAME/MOCKUP IS 3.I I COORDINATES 38-48-28N 111-36-58E THAN A WU-1 CANISTER AND SMALLER THAN THE LAUNCH TUBE ASSOCIATED WITH THE WU-1. (S/D) IN POSSIBLY RELATED ACTIVITY, ONE T-43 EXPERIMENTAL AUXILIARY (AGE) AND ONE YANXI AGE HAVE RELOCATED FROM HULADAO NAVAL BASE SHIPYARD AND PORT FACILITY TO LUSHUN 25X1 NAVAL BASE AND SHIPYARD 25X1 THE VESSELS FUNCTION AS MISSILE RANGE INSTRUMENTATION SHIPS. COORDINATES 38-52-40N 121-29-30E COMMENTS AND QUERIES REGARDING THIS BRIEFING BOARD MAY BE DIRECTED TO THE NPIC/PEG OPERATIONS OFFICER. These notes have been prepared for briefing purposes only and should not be used for detailed ana- lytical work. Their use should be restricted to the particular briefing board(s) they were prepared for and must be considered valid only for the reporting period as indicated by the date of issue. WARNING NOTICE Intelligence Sources and Methods Involved Attachment to Z-10508/82 NPIC/PEG (3182) 2 PART GRAPHIC THE CYLINDER, IS LARGER 25X11 SECRET Sanitized Copy Approved for Release 2011/02/25: CIA-RDP89-00121 R000300540003-8 Sanitized Copy Approved for Release 2011/02/25: CIA-RDP89-00121 R000300540003-8 Next 1 Page(s) In Document Denied Iq Sanitized Copy Approved for Release 2011/02/25: CIA-RDP89-00121 R000300540003-8