SLBM ACTIVITY CHINA
Document Type:
Collection:
Document Number (FOIA) /ESDN (CREST):
CIA-RDP89-00121R000300540003-8
Release Decision:
RIPPUB
Original Classification:
S
Document Page Count:
6
Document Creation Date:
December 28, 2016
Document Release Date:
February 25, 2011
Sequence Number:
3
Case Number:
Publication Date:
March 31, 1982
Content Type:
REPORT
File:
Attachment | Size |
---|---|
![]() | 162.87 KB |
Body:
Sanitized Copy Approved for Release 2011/02/25: CIA-RDP89-00121 R000300540003-8
Iq
Next 1 Page(s) In Document Denied
Sanitized Copy Approved for Release 2011/02/25: CIA-RDP89-00121 R000300540003-8
Sanitized Copy Approved for Release 2011/02/25: CIA-RDP89-00121 R000300540003-8
ROUTING
TO:
NAME AND ADDRESS
DATE
INITIALS
1
2
irec or
3
Room
4
ACTION
DIRECT REPLY
PREPARE REPLY
APPROVAL
DISPATCH
RECOMMENDATION
COMMENT
FILE
RETURN
CONCURRENCE
INFORMATION
SIGNATURE
REMARKS:
FROM: NAME, ADDRESS, AND PHONE NO.
DATE
SECRET
(Security Classification)
(See inside cover) 25X1
CONTROL NO. z- 50
Copy .27
Warning Notice
Intelligence Sources and Methods Involved
NATIONAL SECURITY INFORMATION
Unauthorized Disclosure Subject to Criminal Sanctions
SECRET
(Security Classification)
11 - Sanitized Copy Approved for Release 2011/02/25: CIA-RDP89-00121 R000300540003-8
1'.. II I ...1 1. I. .I I I I .I. 1 I 1'I I
Sanitized Copy Approved for Release 2011/02/25: CIA-RDP89-00121 R000300540003-8
Warning Notice
Intelligence Sources and Methods Involved
(WNINTEL) or (D)
NATIONAL SECURITY INFORMATION
Unauthorized Disclosure Subject to Criminal Sanctions
DISSEMINATION CONTROL ABBREVIATIONS
NOFORN- Not Releasable to Foreign Nationals
NOCONTRACT- Not Releasable to Contractors or
Contractor/Consultants
PROPIN- Caution-Proprietary Information Involved
USIBONLY- USIB Departments Only
ORCON- Dissemination and Extraction of Information
Controlled by Originator
REL ... This Information has been Authorized for
Release to .. .
Sanitized Copy Approved for Release 2011/02/25: CIA-RDP89-00121 R000300540003-8
Sanitized Copy Approved for Release 2011/02/25: CIA-RDP89-00121 R000300540003-8
SECRET
Page 1 of
Copy L7
(c) NATIONAL PHOTOGRAPHIC INTERPRETATION CENTER
Attachment to Z-10508/82
NPIC/PEG (3/82)
2 PART GRAPHIC
1. (S/D) SIGNIFICANCE: ACTIVITY ASSOCIATED WITH THE DEVELOPMENT
OF CHINA'S SUBMARINE-LAUNCHED BALLISTIC MISSILE (SLBM) SYSTEM
IS OBSERVED AT TWO MAJOR RESEARCH AND DEVELOPMENT FACILITIES.
MISSILE CHECKOUT ACTIVITY IS IN PROGRESS AT WUZHAI SSM SUPPORT
FACILITY AND TEST-RELATED ACTIVITY IS UNDERWAY 25X1
AT HSIAO-PING-TAO SLBM SUPPORT FACILITY 25X1
L. (S/D) REMARKS: AT THE WUZHAI SSM SUPPORT FACILITY
(GRAPHIC 1 OF 2), PREPARATIONS FOR THE FOURTH FLIGHT TEST OF
THE WU-1 SLBM ARE IN PROGRESS. A WU-1 SLBM MISSILE CANISTER ON
A DOLLY IS ON THE APRON IN FRONT OF AN ASSEMBLY AND CHECKOUT
BUILDING IN THE CSS-2 MRBM CHECKOUT AREA. CANISTER END-CAPS
ARE ON THE GROUND NEXT TO THE CANISTER. A WU-1 CANISTER
TRANSPO
RTER AND
A TRUCK-
MOUNTED CRANE ARE NEAR THE DOLLY.
THIS
ACTIVI
TY SUGGES
TS THAT T
HE WU-1 MISSILE CHECKOUT PROCESS,
UNDERWA
Y SINCE
1 MARCH 1
982, MAY BE ENTERING ITS FINAL PH
ASES
AND TH
AT THE MI
SSILE MAY
BE MOVED TO THE WUZHA
R&D/TR
AINING LA
UNCH TEST
SITE Al/A2/A3
FO
R
25X1
REHERS
(S/D) E
AL OF LAU
VIDENCE
NCH PROCE
THAT A WU
DURES.
-1 MISSILE HAD BEEN DELIVERED
WUZHAI
MISSILE
TEST COMP
LEX
WAS
25X1
OBSERV
ED AT WUZ
HAI SUPPO
RT ARF.A - WHEN
A
25X1
WU-1 THREE-RAILCAR TRAIN WAS ON A RAIL SIDING. PREVIOUS WU-1
LAUNCH CYCLES HAVE VARIED FROM 30 TO 63 DAYS AFTER ARRIVAL OF
THE MISSILE AT THE COMPLEX. IN ADDITION, ELECTRONICS/TRACKING
ACTIVITY ASSOCIATED WITH THE UPCOMING WU-1 SLBM LAUNCH HAS BEEN
OBSERVED AT YINCHUAN SSM/SPACE TRACKING FACILITY 1
AND YINCHUAN SSM/SPACE TRACKING FACILITY 2 25X1
FIRE CAN RADAR VANS AND ASSOCIATED ELECTRONICS
SUPPORT VEHICLES HAVE BEEN OBSERVED AT BOTH FACILITIES.
These notes have been prepared for briefing purposes only and should not be used for detailed ana-
lytical work. Their use should be restricted to the particular briefing board(s) they were prepared for
and must be considered valid only for the reporting period a; indicated by the date of issue.
WARNING NOTICE
Intelligence Sources
and Methods Involved
SECRET
11 Sanitized Copy Approved for Release 2011/02/25: CIA-RDP89-00121 R000300540003-8
Sanitized Copy Approved for Release 2011/02/25: CIA-RDP89-00121 R000300540003-8
SECRET
(c) NATIONAL PHOTOGRAPHIC INTERPRETATION CENTER
Page 2 of 1
Copy ~7
(S/D) AT HSIAO-PING-TAO SLBM SUPPORT FACILITY (GRAPHIC 2 OF 2),
TEST-RELATED ACTIVITY IS UNDERWAY. ONE POSSIBLE WU-1
AIRFRAME/MOCKUP, ONE UNIDENTIFIED CYLINDER, ONE WU-1 CANISTER
TRANSPORTER, ONE PROBABLE ELECTRONICS VAN, AND THREE BUSES ARE
NEAR THE MAIN CHECKOUT BUILDING. THE AIRFRAME/MOCKUP IS
3.I I COORDINATES 38-48-28N 111-36-58E
THAN A WU-1 CANISTER AND SMALLER THAN THE LAUNCH TUBE
ASSOCIATED WITH THE WU-1.
(S/D) IN POSSIBLY RELATED ACTIVITY, ONE T-43 EXPERIMENTAL
AUXILIARY (AGE) AND ONE YANXI AGE HAVE RELOCATED FROM HULADAO
NAVAL BASE SHIPYARD AND PORT FACILITY TO LUSHUN 25X1
NAVAL BASE AND SHIPYARD 25X1
THE VESSELS FUNCTION AS MISSILE RANGE INSTRUMENTATION SHIPS.
COORDINATES 38-52-40N 121-29-30E
COMMENTS AND QUERIES REGARDING THIS BRIEFING BOARD MAY BE
DIRECTED TO THE NPIC/PEG OPERATIONS OFFICER.
These notes have been prepared for briefing purposes only and should not be used for detailed ana-
lytical work. Their use should be restricted to the particular briefing board(s) they were prepared for
and must be considered valid only for the reporting period as indicated by the date of issue.
WARNING NOTICE
Intelligence Sources
and Methods Involved
Attachment to Z-10508/82
NPIC/PEG (3182)
2 PART GRAPHIC
THE CYLINDER, IS LARGER 25X11
SECRET
Sanitized Copy Approved for Release 2011/02/25: CIA-RDP89-00121 R000300540003-8
Sanitized Copy Approved for Release 2011/02/25: CIA-RDP89-00121 R000300540003-8
Next 1 Page(s) In Document Denied
Iq
Sanitized Copy Approved for Release 2011/02/25: CIA-RDP89-00121 R000300540003-8