OIG FUTURE BUILDING SPACE REQUIREMENTS
Document Type:
Collection:
Document Number (FOIA) /ESDN (CREST):
CIA-RDP89-00244R000100130020-7
Release Decision:
RIPPUB
Original Classification:
U
Document Page Count:
1
Document Creation Date:
December 14, 2016
Document Release Date:
April 9, 2003
Sequence Number:
20
Case Number:
Publication Date:
May 28, 1981
Content Type:
MF
File:
Attachment | Size |
---|---|
![]() | 45.04 KB |
Body:
Approved Fo
2 S i1AY 1931
Chairman, D('I Area Building Planning Subcommittee
OIG Member, DCI Area Building Planning Subcommittee
SUBJECT: OIG Future Building Space Requirements
1. is designated as alternate OIG member of your
subcommittee. His extension is
2. The Audit Staff, presently l.ocated in Key Building, should be
relocated to the Headquarters Building if the Office of Finance is also
moved to Headquarters, as the bulk of its day-to-day coordination is
with OF.
3. OIG does not anticipate any upward change in its present personnel
ceiling of =positions [Audit Staff positions presently in Key Building
and Inspection Staff positions at Headquarters) through the year 2000.
4.-, OIG does not anticipate any increase in machine support require-
ments beyond what currently exists or is budgeted for. This includes six
word-processing units for the Inspection Staff and two word-processing
units and three ADP terminals for the Audit Staff. There are no special
floor loading, storage, power, or environmental control requirements
associated with this equipment (except for secure vault storage) nor
.are there.new technologies being considered for out-year application.
cc: AO/DCI
Approved For
IA?R'DP83 b0244RibO d013OO2O-7
STAT