LETTER TO JOHN P. FOWLER, II FROM H.M. SHAVER, JR.

Document Type: 
Collection: 
Document Number (FOIA) /ESDN (CREST): 
CIA-RDP89-00244R001403340012-9
Release Decision: 
RIPPUB
Original Classification: 
K
Document Page Count: 
6
Document Creation Date: 
December 23, 2016
Document Release Date: 
July 18, 2011
Sequence Number: 
12
Case Number: 
Publication Date: 
June 5, 1986
Content Type: 
LETTER
File: 
AttachmentSize
PDF icon CIA-RDP89-00244R001403340012-9.pdf155.66 KB
Body: 
Sanitized Copy Approved for Release 2011/07/18: CIA-RDP89-00244R001403340012-9 COMMONWEALTH OF VIRGINIA DEPARTMENT OF HIGHWAYS AND TRANSPORTATION June 5, 1986 Mr. John P. Fowler, 11, P. E. Dewberry & Davis 8401 Arlington Boulevard Fairfax, Virginia 22031 Dear Mr. Fowler: Project 0123-029-000, C-501 Roadways Adjacent to the CIA Headquarters at Langley Fairfax County Reference Is made to your letter of May 26 which included a revised project schedule and May 29 regarding the supplemental work that has been performed in connection with the CIA Traffic Advisory Committee meetings. The revised project schedule appears realistic, however, the mid-August completion date hinges on the utility field Inspection plans and the success of the CIA In scheduling and holdi the remaining two TAC meetings. I am forwarding a copy of this schedule to Mr. for his Information. The utility information being secured by So-Deep will be orwar to you as soon as it is received. Your letter outlines the supplemental design work that has been performed to resolve Issues raised at the TAC meetings. Hopefully no further studies will be requirea and the project con be completed within the existing budget. 4'64t~~ - z w/enclosure H. M. Shaver, Jr. State Location and Design Engineer Sanitized Copy Approved for Release 2011/07/18: CIA-RDP89-00244R001403340012-9 Sanitized Copy Approved for Release 2011/07/18: CIA-RDP89-00244R001403340012-9 Sanitized Copy Approved for Release 2011/07/18: CIA-RDP89-00244R001403340012-9 - Sanitized Copy Approved for Release 2011/07/18: CIA-RDP89-00244R001403340012-9 Dewberry & Davis Engineers Architects Planners Surveyors May 28, 1986 8401 Arlington Boulevard Fairfax, VA 22031 703 849-0100 Mr. H.M. Shaver, Jr. State Location & Design Engineer Commonwealth of Virginia Department of Highways & Transportation 1221 East Broad Street Richmond, Virginia 23219 Re: CIA Access Improvements - Phase II Progress Report #9 - through April 1986 fo LOCATION AND DESIGN DIVISION RECEIVED ECC JEY MAY 30 1986 Respectfully submitted is our Progress Report describing professional engineering services provided the Department on the referenced Project during April. Accompanying this narrative is a revised Project Schedule and a numerical representation of the status of the various work tasks comprising the assignment. Field Surveys and Mapping Tasks previously completed. Preliminary Layout A second Technical Advisory Committee Meeting to discuss the three alternative designs was held April 14th. Subsequently, we were advised to complete the Field Inspection Plans based upon the recommended design reviewed at the April meeting. Field Inspection Plans Services provided in April consisted of development of the preliminary maintenance of traffic plan, completion of the traffic control plans for incorporation into the Field Inspection set, and effort on development of the Field Inspection Plans. Field Inspection submittal was scheduled for May 19th with the date for the field inspection itself set for June 5th. Public Participation Program As noted, a second meeting of the CIA's Traffic Advisory Committee was held in April. At that time, three alternative designs for the Route 193/Route 123 intersection were discussed. Fairfax, VA Gaithersburg, MD Raleigh, NC Annapolis. MD Landover, MD Richmond. VA Baltimore, MD Marion. VA Woodbridge. VA Danville, VA Morristown. TN Sanitized Copy Approved for Release 2011/07/18: CIA-RDP89-00244R001403340012-9 Sanitized Copy Approved for Release 2011/07/18: CIA-RDP89-00244R001403340012-9 Mr. H.M. Shaver, Jr. Page -2- Concluding Statement May 28, 1986 Good progress was made the latter part of April on Field Inspection Plans for the Project. Field Inspection has been scheduled for June 5th with plan delivery to occur late in May. Our proposed Schedule for completing this design assignment is attached to this Report. Yours very truly, Dewberry & Davis Sanitized Copy Approved for Release 2011/07/18: CIA-RDP89-00244R001403340012-9 Sanitized Copy Approved for Release 2011/07/18: CIA-RDP89-00244R001403340012-9 CIA AOCM - P11SE II Fairfax Q=ty. Virginia State Project: 0219-A-002 WORK STARE SLPt*M Actual Scheduled Percent Percent. Weighted Clete Om plete Value (%) Task Total Task Total A. Field Survey 13.2 100 13.2 100 13.2 B. Base Mapping 3.1 100 3.1 100 3.1 C. Preliminary Layout 8.2 100 8.2 100 8.2 D. Preliminary Traffic Control 4.6 100 4.6 100 4.6 E. Preliminary Maintenance of Traffic 2.7 100 2.7 100 2.7 F. Preliminary Landscaping -4.1 100 4.1 100 4.1 G. Field Inspection Plans 25.3 90 22.8 100 25.3 H. Final Plans & Specifications 35.0 --- --- 60 35.0 I. Public Meetings 3.8 33 1.3 67 3.8 100.0 60.0 Sanitized Copy Approved for Release 2011/07/18: CIA-RDP89-00244R001403340012-9 Sanitized Copy Approved for Release 2011/07/18: CIA-RDP89-00244R001403340012-9 CIA ACCESS IMPROVEMENTS PHASE II - FINAL DESIGN AND CONSTRUCTION DOCUMENTS SCHEDULE A S 0 N D J F M A M J J A S Fi ld S urveys e Base Mapping Preliminary Layout Field Inspection Preliminary Traffic Controls Preliminary Maintenance of Traffic Preliminary Landscaping ection Plans ld Ins Fi 17 77777 17" p e Field Inspection ifications l Pl d S Fi ans an pec na Public Meetings C C1 C2 C2 * Field Inspections C Advisory Committee Meetings * Meeting rescheduled to January C1 Second Initial Meeting C2 Rescheduled Advisory Committee Meetings Sanitized Copy Approved for Release 2011/07/18: CIA-RDP89-00244R001403340012-9