LETTER TO JOHN P. FOWLER, II FROM H.M. SHAVER, JR.
Document Type:
Collection:
Document Number (FOIA) /ESDN (CREST):
CIA-RDP89-00244R001403340012-9
Release Decision:
RIPPUB
Original Classification:
K
Document Page Count:
6
Document Creation Date:
December 23, 2016
Document Release Date:
July 18, 2011
Sequence Number:
12
Case Number:
Publication Date:
June 5, 1986
Content Type:
LETTER
File:
Attachment | Size |
---|---|
![]() | 155.66 KB |
Body:
Sanitized Copy Approved for Release 2011/07/18: CIA-RDP89-00244R001403340012-9
COMMONWEALTH OF VIRGINIA
DEPARTMENT OF HIGHWAYS AND TRANSPORTATION
June 5, 1986
Mr. John P. Fowler, 11, P. E.
Dewberry & Davis
8401 Arlington Boulevard
Fairfax, Virginia 22031
Dear Mr. Fowler:
Project 0123-029-000, C-501
Roadways Adjacent to the
CIA Headquarters at Langley
Fairfax County
Reference Is made to your letter of May 26 which included a revised project schedule and
May 29 regarding the supplemental work that has been performed in connection with the
CIA Traffic Advisory Committee meetings.
The revised project schedule appears realistic, however, the mid-August completion date
hinges on the utility field Inspection plans and the success of the CIA In scheduling and
holdi the remaining two TAC meetings. I am forwarding a copy of this schedule to Mr.
for his Information. The utility information being secured by So-Deep will be
orwar to you as soon as it is received.
Your letter outlines the supplemental design work that has been performed to resolve
Issues raised at the TAC meetings. Hopefully no further studies will be requirea and the
project con be completed within the existing budget.
4'64t~~ -
z
w/enclosure
H. M. Shaver, Jr.
State Location and
Design Engineer
Sanitized Copy Approved for Release 2011/07/18: CIA-RDP89-00244R001403340012-9
Sanitized Copy Approved for Release 2011/07/18: CIA-RDP89-00244R001403340012-9
Sanitized Copy Approved for Release 2011/07/18: CIA-RDP89-00244R001403340012-9
- Sanitized Copy Approved for Release 2011/07/18: CIA-RDP89-00244R001403340012-9
Dewberry & Davis
Engineers
Architects
Planners
Surveyors
May 28, 1986
8401 Arlington Boulevard
Fairfax, VA 22031
703 849-0100
Mr. H.M. Shaver, Jr.
State Location & Design Engineer
Commonwealth of Virginia
Department of Highways & Transportation
1221 East Broad Street
Richmond, Virginia 23219
Re: CIA Access Improvements - Phase II
Progress Report #9 - through April 1986
fo
LOCATION AND DESIGN DIVISION
RECEIVED
ECC
JEY
MAY 30 1986
Respectfully submitted is our Progress Report describing professional engineering services
provided the Department on the referenced Project during April. Accompanying this
narrative is a revised Project Schedule and a numerical representation of the status of
the various work tasks comprising the assignment.
Field Surveys and Mapping
Tasks previously completed.
Preliminary Layout
A second Technical Advisory Committee Meeting to discuss the three alternative designs
was held April 14th. Subsequently, we were advised to complete the Field Inspection
Plans based upon the recommended design reviewed at the April meeting.
Field Inspection Plans
Services provided in April consisted of development of the preliminary maintenance
of traffic plan, completion of the traffic control plans for incorporation into the Field
Inspection set, and effort on development of the Field Inspection Plans. Field Inspection
submittal was scheduled for May 19th with the date for the field inspection itself set
for June 5th.
Public Participation Program
As noted, a second meeting of the CIA's Traffic Advisory Committee was held in April.
At that time, three alternative designs for the Route 193/Route 123 intersection were
discussed.
Fairfax, VA Gaithersburg, MD Raleigh, NC
Annapolis. MD Landover, MD Richmond. VA
Baltimore, MD Marion. VA Woodbridge. VA
Danville, VA Morristown. TN
Sanitized Copy Approved for Release 2011/07/18: CIA-RDP89-00244R001403340012-9
Sanitized Copy Approved for Release 2011/07/18: CIA-RDP89-00244R001403340012-9
Mr. H.M. Shaver, Jr. Page -2-
Concluding Statement
May 28, 1986
Good progress was made the latter part of April on Field Inspection Plans for the Project.
Field Inspection has been scheduled for June 5th with plan delivery to occur late in May.
Our proposed Schedule for completing this design assignment is attached to this Report.
Yours very truly,
Dewberry & Davis
Sanitized Copy Approved for Release 2011/07/18: CIA-RDP89-00244R001403340012-9
Sanitized Copy Approved for Release 2011/07/18: CIA-RDP89-00244R001403340012-9
CIA AOCM - P11SE II
Fairfax Q=ty. Virginia
State Project: 0219-A-002
WORK STARE SLPt*M
Actual
Scheduled
Percent
Percent.
Weighted
Clete
Om plete
Value (%)
Task
Total
Task
Total
A.
Field Survey
13.2
100
13.2
100
13.2
B.
Base Mapping
3.1
100
3.1
100
3.1
C.
Preliminary Layout
8.2
100
8.2
100
8.2
D.
Preliminary Traffic Control
4.6
100
4.6
100
4.6
E.
Preliminary Maintenance of
Traffic
2.7
100
2.7
100
2.7
F.
Preliminary Landscaping
-4.1
100
4.1
100
4.1
G.
Field Inspection Plans
25.3
90
22.8
100
25.3
H.
Final Plans & Specifications
35.0
---
---
60
35.0
I.
Public Meetings
3.8
33
1.3
67
3.8
100.0
60.0
Sanitized Copy Approved for Release 2011/07/18: CIA-RDP89-00244R001403340012-9
Sanitized Copy Approved for Release 2011/07/18: CIA-RDP89-00244R001403340012-9
CIA ACCESS IMPROVEMENTS
PHASE II - FINAL DESIGN AND CONSTRUCTION DOCUMENTS
SCHEDULE
A
S
0
N
D
J
F
M
A
M
J
J
A
S
Fi
ld S
urveys
e
Base Mapping
Preliminary Layout
Field Inspection
Preliminary Traffic Controls
Preliminary Maintenance of Traffic
Preliminary Landscaping
ection Plans
ld Ins
Fi
17
77777
17"
p
e
Field Inspection
ifications
l Pl
d S
Fi
ans an
pec
na
Public Meetings
C
C1
C2
C2
* Field Inspections
C Advisory Committee Meetings
* Meeting rescheduled to January
C1 Second Initial Meeting
C2 Rescheduled Advisory Committee Meetings
Sanitized Copy Approved for Release 2011/07/18: CIA-RDP89-00244R001403340012-9