PRE-FLIGHT CHECKLIST FOR PERSONAL EQUIPMENT SECTION
Document Type:
Collection:
Document Number (FOIA) /ESDN (CREST):
CIA-RDP89B00551R000100090025-4
Release Decision:
RIPPUB
Original Classification:
K
Document Page Count:
2
Document Creation Date:
December 12, 2016
Document Release Date:
February 21, 2002
Sequence Number:
25
Case Number:
Content Type:
LIST
File:
Attachment | Size |
---|---|
![]() | 92.79 KB |
Body:
Approved For,,&Iease 2002/06/19 : CIA-RDP89B0055 500100090025-4
PRE-FLIGHT CHECKLIST FOR PERSONAL, EQU n~ 't T cr'TION
1. Pre--Breathingoom (T,O. Minus 2- 20~
. Orderliness
. b. Security
Utilities (Electricity - Air Conditioning)
2. Ground Vehicle Check (T.O. Minue 2:20
a. Walk Around check
L'. Starting
s 2)
On Board; Spare Pack (1)'- Facepiece (1) 1+25 psi
Cushions (2) - Parachutes (2).
,nus 2 20 ~c
3, Aircraft Oxygen Check T O M!
L/ao Position Seat Pack in cockpit
Oxygen pressure 1500 to 2000 psi
Connect oxygen and check for flow
L,,d . Check radio.through seat pack
L,-"e"'. Check face piece heat on normal and by-pass
Arrange placement of seat belt, harness, seat pack leads
Pre-Breathing T.0. Minus 2tOO)
Oxygen manifold and reduction system !.'ON"
150 psi connected to console
c. Console check flow and pressure 2 to 3 mm Hg
j' L,,--d'. Fit underwear to pilot
f Connect face piece to console - turn "ON"
g. Pre-breath pilot and note time "ON"
5. Check Personal Equipment:
a. Suit condition
b. Helmet
Gloves
Enclosure 2 to SOP-0-1. Page 1
Approved For Release 2002/06/19 : CIA-RDP89B00551 R000100090025-4
Approved Forgelease 2002/06/19 : CIA-RDP89B0055 .R'000100-90025-4
Boots '
ire. Parachute
f. Coveralls
Face piece and carrier
1-l store items in sequence of wear after check,
Periodically insure pilot's oxygen supply adequacy and' comfort
b, Clothin Pilot LT 4Zu .N
a Fit Pilot s s suit assembly plus coveralls, Check all zippers,
lacings and general appearance,
Drinking water
/~ r pi o rom cons(File --ted)rmr^eti D-2 charged
425 Psi
Escort pilot to vehicle and plane
7,. At Aircraf (T 0. Minus :2?) :
Fit parachute and back pack to pilot
General evaluation of all garments
' c. Pilot hook-up in aircraft: Seat pack hook-up; engage capstan and
breathing supply hoses; erigage flight face piece to ''T" block; connect amphenol;
connect "U" plug; oxygen "ON"; check flow and change face piece; shoulder
harness and seat belt; face piece heat check; press to test and chock inflation,
/-? Recheck all items - get pilots approval
Technician and vehicle remain "on line" until aircraft departure.
$. Post Fli t:
a. Report to aircraft at "Switch Off" t-u.i.e
4l.,--b. Assist. pilot out of aircraft and remove headgear,
Remove personal equipment from cockpit,
C.-"d. Return pilot to operations.
e, Assist In removing clothing.
f. Clean and perform minute inspection of all equipment.
C,,l g. Report to de-briefing for pilot report.
25X1A
Enclosure 2 to SOP-O-I, Page 2
Approved For Release 2002