SPECIAL EQUIPMENT SECTION CHECK SHEET COMMUNICATIONS SECTION

Document Type: 
Collection: 
Document Number (FOIA) /ESDN (CREST): 
CIA-RDP89B00551R000100100029-8
Release Decision: 
RIPPUB
Original Classification: 
K
Document Page Count: 
1
Document Creation Date: 
November 16, 2016
Document Release Date: 
March 27, 2000
Sequence Number: 
29
Case Number: 
Publication Date: 
October 29, 1956
Content Type: 
REQ
File: 
AttachmentSize
PDF icon CIA-RDP89B00551R000100100029-8.pdf75.48 KB
Body: 
Approved For Releaq& 2000/05/31 : CIA-RDP891300554,&0001 QD1( 002 *T SPECIAL EQUIPMENT SECTION CHECK SHEET COAUNICATIONS SECTION PRE-FLIGHT PROCEDURE: l ' Check the ARN-6 and ARC-34 radio equipment at least two and one half hours prior to take-off time. 25X1A a`"? Through the use of ' l the frequencies that will normally be used during the flight are group c ec Red between the hangar and Commo equipment _,section were is located. 25X1A 2. Load aircraft with S or X gear and check performance. a he S or X equipment will have been bench checked before being installed in the plane. 3. Have at least one man stand by at take off time to, a!.--"BS-,,,ready for any radio or compass troubles that may occur,, b. "Buzz" the aircraft systems equipment during the one minute period prior to roll-off. POST-FLIGHT PROCEDURE: 1%'- Remove the equipment from the aircraft as soon as permission is received from the crew chief. (Especially done in this manner if the aircraft is "hot" when permission is received from the crew chief the plane is safe to work on) 2".117 From this point on, the following steps are taken: The debriefing is attended so that the points of flight will be known. A map pr overlay is provided to be forwarded with tape? b;, The tape is then removed from the recorder, rewound onto another reel and,put onto the ampex tape recorder for the dubbing procedure which follows cLoo ", After being re-wound, the tape is played through to the point where the "bu", (that was put on just prior to roll-off') is located dh At this time, the dubbing or copy tape is put into position on the recorder; the 24 hour clock set for the same time as take-off and simultaneously, the clock starts running, both tapes start revolving and the "Flight is 'reflown' again in the lab." e-" The signals from the tape taken from the aircraft are being played back and are heard by the "Dubbing" operator and are also being recorded onto the "dubbing lapel' which is used for local analysis then forwarded. f. When a R-signal is heard on the tape, the operator merely has to note the time, look on the debriefing sheet to see where the plane was at such a time and note the locale, time and type of signal heard on the critique sheet. Enclosure No. 5 to SOP-O-l. Page 1 Change No. 1 -- Destroy previous sheets. 25X1A Approved For Release 2000/05/31 : CIA-RDP89B00551 R000100100029-8