CONTRACT TA-3034 WESTINGHOUSE REFERENCE AAD-30465 MONTHLY PROGRESS REPORT #6

Document Type: 
Collection: 
Document Number (FOIA) /ESDN (CREST): 
CIA-RDP89B00709R000400890018-9
Release Decision: 
RIPPUB
Original Classification: 
S
Document Page Count: 
6
Document Creation Date: 
December 27, 2016
Document Release Date: 
December 6, 2011
Sequence Number: 
18
Case Number: 
Publication Date: 
December 24, 1957
Content Type: 
LETTER
File: 
AttachmentSize
PDF icon CIA-RDP89B00709R000400890018-9.pdf244.24 KB
Body: 
_ I o yam. Win F Declassified in Part - Sanitized Copy Approved for Release 2011/12/06: CIA-RDP89B00709R000400890018-9 25X1 Westinghouse SAPC COPY / OF I PHONE: LINTHICUM 1000 FRIENDSHIP INT'L AIRPORT BOX 746. BALTIMORE 3. MD. 24 December 1957 ,1 -4 1 71 25X1 SUBJECT: Contract TA-3034 Westinghouse Reference PAD-30465 Monthly Progress Report #6 In accordance with Item 3 of the subject contract, forwarded herewith are three (3) copies of Monthly Progress Report #6 on the Terrain Avoidance Radar System for the period from 31 October to 30 November 1957? Sales Engineer ,~'-7 2 V-- -3 J, f4-- .4 ~ -Z /.- s- 2~ YOU CAN BE SURE... IF IT'sWestinghouse Declassified in Part - Sanitized Copy Approved for Release 2011/12/06: CIA-RDP89B00709R000400890018-9 Declassified in Part - Sanitized Copy Approved for Release 2011/12/06: CIA-RDP89B00709R000400890018-9 %)L U11109 fl JAPC _2 -L ? I COPY / OF MONTHLY PROGRESS REPORT - #6 on the TERRAIN AVOIDANCE RADAR SYSTEM For the period from 31 October to 30 NOVEMBER 1957 G.O. AO-3o465 0 NOTICE: This document contains information affecting the national defense of the United States within the meaning of the Espionage Laws, Title 18, U.S.C.,. -.Sections 793-794. The transmission or the revelation of its contents.in any manner to an unauthorized person is prohibited by law, 0 WESTINGHOUSE ELECTRIC CORPORATION Air Arm Division P.O. Box 746 Baltimore 3, Maryland Q, r . PET L -117 Declassified in Part - Sanitized Copy Approved for Release 2011/12/06: CIA-RDP89B00709R000400890018-9 Declassified in Part - Sanitized Copy Approved for Release 2011/12/06: CIA-RDP89B00709R000400890018-9 C SECRET TERRAIN AVOIDANCE MONTHLY PROGRESS REPORT #6 PROGRESS FOR THE MONTH OF NOVEMER 1957 01 The high speed rotary joint was redesigned to eliminate radial play. Drawings of the rotary joint housing have been released to the Model Shop. Considerable work had already been done on a 1? antenna when it was decided to change to a 2? antenna. In order-to have an antenna for laboratory use as soon as possible it was decided to complete the 1? antenna. Two designs for the rotating feed have been released to the Model Shop. A third design is now in pro- gress. Models must be built to experimentally determine the best compromise between performance and ease of manufacture. A design for modification of the existing parallel plate horn to incorporate a curved backwall has been completed and released to the Model Shop. The curved backwall is a method of beamshaping and may be incorporated in the antenna to simpli- fy the scanning system. An alternate design using beamshaping in the E plane has been completed and released to the Model Shop. Sketches of the 1? scanning head are 90% complete and Model Shop work is 40% complete. The 2? scanning head layout is 90% completed by Drafting. Receiver-Transmitter The layout of the R-T unit is about 50% completed by Drafting. A bread- board R-T has been assembled and is being tested. Modulator A breadboard modulator using the transformers designed for the system has been built and is being tested. Model Shop construction of the final unit is in progress. "T L K u Declassified in Part - Sanitized Copy Approved for Release 2011/12/06: CIA-RDP89B00709R000400890018-9 _ I I II I IIH I~_ 1 III 1 _ ___ ! _~~ Declassified in Part - Sanitized Copy Approved for Release 2011/12/06: CIA-RDP89B00709R000400890018-9 tr_ ~yB. V o ~~ ~ ~i CO AFC Model Shop construction is 50% complete, Receiver Model Shop construction of the Pre-Amp, and Post Amp. is 50% complete. Control Panel The layout of this unit has been completed by Drafting. Detail drawings are now being made. Synchronizer Drafting has completed the schematic'and,main chassis layout. Layout of subunits continues. E - Scope Vertical and horizontal subchassis have been released to Model Shop. MazinlI chassis drawings have been completed but not checked. Power Supply The chassis layout is approximately 3015 complete. The voltage control boxes ii have been laid out and a Model built in the lab for stability tests, Drawings for control box-covers have been made and submitted to electrofilm for their final proposal on temperature control. X- Scope The completed breadboard has undergone laboratory evaluation in this period. Most of the interference observed in the display has been attributed to poorly regulated laboratory supplies. The RCA representative gave some assistance in the proper operation of the storage tube,and revised some of the initial tube data. The erase gun characteristics will continue to be under consideration. The experimental optical system has been used with the indicator. Pre- liminary evaluation indicates that the system will be adequate. Effort is being r -2- cpt" 1 sE 414D NP I EF ON NOW EM N44*L Declassified in Part - Sanitized Copy Approved for Release 2011/12/06: CIA-RDP89BOO709ROO0400890018-9 Declassified in Part - Sanitized Copy Approved for Release 2011/12/06: CIA-RDP89B00709R000400890018-9 lklvi SECRET directed to increasing light intensity of the screen. Details of the final optical, system are presently being worked on. The drafting phase of the X-Scope unit is well under way. Some detail work has started. System Performance Test An investigation of various possible ways of making an in-flight system performance checkwas made. It was decided that the most feasible method was that of using an ultra- sonic quartz delay line in shunt between the preamplifier and postamplifier. A pulse sample from the maggy is converted to a 45 me pulse, by the receiver, and hits the delay line and it rings with a decay rate of approximately 2 db per echo. The echoes then disappear into the noise and by counting the number of visible echoes a relative measure of system performance is achieved. Two experimental delay line models were ordered and received from Ultrasonics, Inc. A test set-up utilizing a pulsed klystron, in lieu of the maggy, was con- structed and the operation verified. Approximately 18 to 20 echoes are visible, however, an accurate measure of system performance is not possible because of the inaccuracy of counting the number of echoes as they disappear in the noise. GONFiDEMMPAL ,,, Declassified in Part - Sanitized Copy Approved for Release 2011/12/06: CIA-RDP89B00709R000400890018-9 Declassified in Part - Sanitized Copy Approved for Release 2011/12/06: CIA-RDP89B00709R000400890018-9 0 20 40 60 00 100 A LEGEND A. PRELIMINARY ELECTRONIC DESIGN 6 FABRICATION a TESTING Of COMPLETE BREADBOARD C. DETAIL STRUCTURAL DESIGN 0 FABRICATION & ASSEMBLY OF CHASSIS a CASES E. ELECTRONIC ASSEMBLY OF PROTOTYPE MODEL F COMPLETE TESTING OF PROTOTYPE MODEL Declassified in Part - Sanitized Copy Approved for Release 2011/12/06: CIA-RDP89B00709R000400890018-9