CONTRACT TA-3034 WESTINGHOUSE REFERENCE AAD-30465 MONTHLY PROGRESS REPORT #6
Document Type:
Collection:
Document Number (FOIA) /ESDN (CREST):
CIA-RDP89B00709R000400890018-9
Release Decision:
RIPPUB
Original Classification:
S
Document Page Count:
6
Document Creation Date:
December 27, 2016
Document Release Date:
December 6, 2011
Sequence Number:
18
Case Number:
Publication Date:
December 24, 1957
Content Type:
LETTER
File:
Attachment | Size |
---|---|
![]() | 244.24 KB |
Body:
_ I o yam. Win F
Declassified in Part - Sanitized Copy Approved for Release 2011/12/06: CIA-RDP89B00709R000400890018-9
25X1
Westinghouse
SAPC
COPY / OF I
PHONE: LINTHICUM 1000
FRIENDSHIP INT'L AIRPORT
BOX 746. BALTIMORE 3. MD.
24 December 1957
,1 -4 1 71
25X1
SUBJECT: Contract TA-3034
Westinghouse Reference PAD-30465
Monthly Progress Report #6
In accordance with Item 3 of the subject
contract, forwarded herewith are three (3) copies of
Monthly Progress Report #6 on the Terrain Avoidance Radar
System for the period from 31 October to 30 November 1957?
Sales Engineer
,~'-7 2 V-- -3 J, f4-- .4 ~ -Z /.- s- 2~
YOU CAN BE SURE... IF IT'sWestinghouse
Declassified in Part - Sanitized Copy Approved for Release 2011/12/06: CIA-RDP89B00709R000400890018-9
Declassified in Part - Sanitized Copy Approved for Release 2011/12/06: CIA-RDP89B00709R000400890018-9
%)L U11109 fl JAPC _2 -L
? I
COPY / OF
MONTHLY PROGRESS REPORT - #6
on the
TERRAIN AVOIDANCE RADAR SYSTEM
For the period from
31 October to 30 NOVEMBER 1957
G.O. AO-3o465
0
NOTICE: This document contains information affecting the national defense of
the United States within the meaning of the Espionage Laws, Title 18,
U.S.C.,. -.Sections 793-794. The transmission or the revelation of its
contents.in any manner to an unauthorized person is prohibited by law,
0
WESTINGHOUSE ELECTRIC CORPORATION
Air Arm Division
P.O. Box 746
Baltimore 3, Maryland
Q, r
. PET
L
-117 Declassified in Part - Sanitized Copy Approved for Release 2011/12/06: CIA-RDP89B00709R000400890018-9
Declassified in Part - Sanitized Copy Approved for Release 2011/12/06: CIA-RDP89B00709R000400890018-9
C SECRET
TERRAIN AVOIDANCE
MONTHLY PROGRESS REPORT #6
PROGRESS FOR THE MONTH OF NOVEMER 1957
01
The high speed rotary joint was redesigned to eliminate radial play.
Drawings of the rotary joint housing have been released to the Model Shop.
Considerable work had already been done on a 1? antenna when it was
decided to change to a 2? antenna. In order-to have an antenna for laboratory use
as soon as possible it was decided to complete the 1? antenna. Two designs for the
rotating feed have been released to the Model Shop. A third design is now in pro-
gress. Models must be built to experimentally determine the best compromise between
performance and ease of manufacture.
A design for modification of the existing parallel plate horn to incorporate
a curved backwall has been completed and released to the Model Shop. The curved
backwall is a method of beamshaping and may be incorporated in the antenna to simpli-
fy the scanning system. An alternate design using beamshaping in the E plane has
been completed and released to the Model Shop.
Sketches of the 1? scanning head are 90% complete and Model Shop work is
40% complete. The 2? scanning head layout is 90% completed by Drafting.
Receiver-Transmitter
The layout of the R-T unit is about 50% completed by Drafting. A bread-
board R-T has been assembled and is being tested.
Modulator
A breadboard modulator using the transformers designed for the system has
been built and is being tested. Model Shop construction of the final unit is in
progress.
"T
L
K u Declassified in Part - Sanitized Copy Approved for Release 2011/12/06: CIA-RDP89B00709R000400890018-9
_ I I II I IIH I~_ 1 III 1 _ ___ ! _~~
Declassified in Part - Sanitized Copy Approved for Release 2011/12/06: CIA-RDP89B00709R000400890018-9
tr_ ~yB. V o ~~ ~ ~i
CO
AFC
Model Shop construction is 50% complete,
Receiver
Model Shop construction of the Pre-Amp, and Post Amp. is 50% complete.
Control Panel
The layout of this unit has been completed by Drafting. Detail drawings
are now being made.
Synchronizer
Drafting has completed the schematic'and,main chassis layout. Layout of
subunits continues.
E - Scope
Vertical and horizontal subchassis have been released to Model Shop. MazinlI
chassis drawings have been completed but not checked.
Power Supply
The chassis layout is approximately
3015 complete. The voltage control boxes
ii
have been laid out and a Model built in the lab for stability tests, Drawings for
control box-covers have been made and submitted to electrofilm for their final
proposal on temperature control.
X- Scope
The completed breadboard has undergone laboratory evaluation in this
period. Most of the interference observed in the display has been attributed to
poorly regulated laboratory supplies. The RCA representative gave some assistance
in the proper operation of the storage tube,and revised some of the initial tube
data. The erase gun characteristics will continue to be under consideration.
The experimental optical system has been used with the indicator. Pre-
liminary evaluation indicates that the system will be adequate. Effort is being
r -2-
cpt" 1
sE
414D NP I EF ON NOW EM N44*L
Declassified in Part - Sanitized Copy Approved for Release 2011/12/06: CIA-RDP89BOO709ROO0400890018-9
Declassified in Part - Sanitized Copy Approved for Release 2011/12/06: CIA-RDP89B00709R000400890018-9
lklvi
SECRET
directed to increasing light intensity of the screen. Details of the final optical,
system are presently being worked on.
The drafting phase of the X-Scope unit is well under way. Some detail
work has started.
System Performance Test
An investigation of various possible ways of making an in-flight system
performance checkwas made.
It was decided that the most feasible method was that of using an ultra-
sonic quartz delay line in shunt between the preamplifier and postamplifier. A
pulse sample from the maggy is converted to a 45 me pulse, by the receiver, and
hits the delay line and it rings with a decay rate of approximately 2 db per echo.
The echoes then disappear into the noise and by counting the number of visible
echoes a relative measure of system performance is achieved.
Two experimental delay line models were ordered and received from
Ultrasonics, Inc.
A test set-up utilizing a pulsed klystron, in lieu of the maggy, was con-
structed and the operation verified. Approximately 18 to 20 echoes are visible,
however, an accurate measure of system performance is not possible because of the
inaccuracy of counting the number of echoes as they disappear in the noise.
GONFiDEMMPAL
,,, Declassified in Part - Sanitized Copy Approved for Release 2011/12/06: CIA-RDP89B00709R000400890018-9
Declassified in Part - Sanitized Copy Approved for Release 2011/12/06: CIA-RDP89B00709R000400890018-9
0 20 40 60 00 100
A
LEGEND
A. PRELIMINARY ELECTRONIC DESIGN
6 FABRICATION a TESTING Of COMPLETE BREADBOARD
C. DETAIL STRUCTURAL DESIGN
0 FABRICATION & ASSEMBLY OF CHASSIS a CASES
E. ELECTRONIC ASSEMBLY OF PROTOTYPE MODEL
F COMPLETE TESTING OF PROTOTYPE MODEL
Declassified in Part - Sanitized Copy Approved for Release 2011/12/06: CIA-RDP89B00709R000400890018-9