REPLACEMENT WIRING - ENGINE COMPARTMENT

Document Type: 
Collection: 
Document Number (FOIA) /ESDN (CREST): 
CIA-RDP89B00980R000300040025-1
Release Decision: 
RIPPUB
Original Classification: 
K
Document Page Count: 
1
Document Creation Date: 
December 15, 2016
Document Release Date: 
October 31, 2002
Sequence Number: 
25
Case Number: 
Publication Date: 
December 2, 1959
Content Type: 
FORM
File: 
AttachmentSize
PDF icon CIA-RDP89B00980R000300040025-1.pdf63.35 KB
Body: 
ApPFGyed R61ease 2P02111115 - Coo-RnP taRnnaQOPoO00300040025-1 IWickheed Aircraft Corp. DATE 12-2-59 11 NAME OF MAJOR COMPONENT PART OR LOWEST SUBASSEMBLY Ship's Wiring ZlIpctrical Harness Moraine Cow, TITLE OF PROPOSAL Kits to be installed on IRAQ at contractor's facility. 1. Replace all wires within the engine compartment (aft of FS 365) with MIL-C-25038_typewireo, except-for-the fire detection and D.C. generator wires which are satisfactory and will remain unchanged.. .2.. Prepare.and issue Service Bulletin 128. . 3. Fabricate kits for S.B. 428 for all Articles. NATURE OF PROPOSAL: * a0R'Ss Revised to include all affect ed wiring in the engine Compartment. REASON FOR PROPOSAL 1.. This is item C, para. 9 of the list 'of improvement items included in "FM IRAN Program" dated Aug. 1959. 2. Past history indicates that engine heat is causing deterioration of some wire insulation in the engine compartment. NOTE: This ECP would standardize all ships with respect to Hi Temp. wire. Some ships had the intent of this RCP performed at Laughlin APB and other ships have had the intent of this ECP performed by S.B. 403 (See ECP LAC-33)? ES ESTIMATED COST AND TIME. INVOLVED ADDITIONAL FUNDING REQUIRED CP ESTIMATED COST FOR KITS OR PARTS ADDITIONAL FUNDING REQUIRED : None (SP-1917) ITEMS AFFECTED BY PROPOSAL SAFETY MISSION { EFFEC- ;'TIVENESS PERFORM. ANCE 0 WEIGHT OR WEIGHT & BALANCE Replacement Wiring - Yigine Compartment OPERATING PROCEDURE D INTER- CHANGE- ABILITY 0 0 TOOLS & SUPPORT EQUIPMENT 11 191 as required MAINTE. NANCE PROCEDURE a PROJECT SERVICE LIFE 0 FLIGHT MANUAL 0 MAINTE- NANCE MANUAL 0 EST. MAN/HRS. REQ'D. TO ACCOMPLISH CHANGE IN FIELD SOURCE OF PARTS FOR KIT LAC DISPOSITION OF SPARES AFFECTED None INITIATED BY `7---- 1SP-I:-1A AVAILABILITY To Meet IRAN Schedule APPROVED : WSPO PROJECT PAGE 1 OF 1; $TAT TAT