REPLACEMENT WIRING - ENGINE COMPARTMENT
Document Type:
Collection:
Document Number (FOIA) /ESDN (CREST):
CIA-RDP89B00980R000300040025-1
Release Decision:
RIPPUB
Original Classification:
K
Document Page Count:
1
Document Creation Date:
December 15, 2016
Document Release Date:
October 31, 2002
Sequence Number:
25
Case Number:
Publication Date:
December 2, 1959
Content Type:
FORM
File:
Attachment | Size |
---|---|
![]() | 63.35 KB |
Body:
ApPFGyed R61ease 2P02111115 - Coo-RnP taRnnaQOPoO00300040025-1
IWickheed Aircraft Corp.
DATE
12-2-59
11
NAME OF MAJOR COMPONENT PART OR LOWEST SUBASSEMBLY
Ship's Wiring ZlIpctrical Harness
Moraine Cow,
TITLE OF PROPOSAL
Kits to be installed on IRAQ at contractor's facility.
1. Replace all wires within the engine compartment (aft of FS 365) with
MIL-C-25038_typewireo, except-for-the fire detection and D.C. generator
wires which are satisfactory and will remain unchanged..
.2.. Prepare.and issue Service Bulletin 128. .
3. Fabricate kits for S.B. 428 for all Articles.
NATURE OF PROPOSAL:
* a0R'Ss Revised to include all affect
ed wiring in the engine Compartment.
REASON FOR PROPOSAL
1.. This is item C, para. 9 of the list 'of improvement items included in
"FM IRAN Program" dated Aug. 1959.
2. Past history indicates that engine heat is causing deterioration of some
wire insulation in the engine compartment.
NOTE: This ECP would standardize all ships with respect to Hi Temp. wire.
Some ships had the intent of this RCP performed at Laughlin APB and
other ships have had the intent of this ECP performed by S.B. 403
(See ECP LAC-33)?
ES
ESTIMATED COST AND TIME. INVOLVED
ADDITIONAL FUNDING REQUIRED
CP
ESTIMATED COST FOR KITS OR PARTS
ADDITIONAL FUNDING REQUIRED : None (SP-1917)
ITEMS AFFECTED BY PROPOSAL
SAFETY MISSION
{ EFFEC-
;'TIVENESS
PERFORM.
ANCE
0
WEIGHT OR
WEIGHT &
BALANCE
Replacement Wiring - Yigine Compartment
OPERATING
PROCEDURE
D
INTER-
CHANGE-
ABILITY
0
0
TOOLS &
SUPPORT
EQUIPMENT
11
191
as required
MAINTE.
NANCE
PROCEDURE
a
PROJECT
SERVICE
LIFE
0
FLIGHT
MANUAL
0
MAINTE-
NANCE
MANUAL
0
EST. MAN/HRS. REQ'D. TO ACCOMPLISH CHANGE IN FIELD
SOURCE OF PARTS FOR KIT
LAC
DISPOSITION OF SPARES AFFECTED
None
INITIATED BY
`7----
1SP-I:-1A
AVAILABILITY
To Meet IRAN Schedule
APPROVED : WSPO
PROJECT
PAGE 1 OF 1;
$TAT