OL/FMD WEEKLY REPORT PERIOD ENDING 22 JUNE 1988

Document Type: 
Collection: 
Document Number (FOIA) /ESDN (CREST): 
CIA-RDP90-00078R000100030040-2
Release Decision: 
RIPPUB
Original Classification: 
C
Document Page Count: 
4
Document Creation Date: 
December 27, 2016
Document Release Date: 
January 30, 2013
Sequence Number: 
40
Case Number: 
Publication Date: 
June 22, 1988
Content Type: 
MISC
File: 
AttachmentSize
PDF icon CIA-RDP90-00078R000100030040-2.pdf197.13 KB
Body: 
Declassified in Part - Sanitized Copy Approved for Release 2013/01/30: CIA-RDP90-00078R000100030040-2 (-""-- Ve.;#k DI' 10111;;; 1. Progress Reports on Tasks Assigned by or of Interest to Senior Senior Management: OL/FMD WEEKLY REPORT PERIOD ENDING 22 JUNE 1988 The Manager, Executive Dining Room, FMD/OL, continues to 25X1 monitor cafeteria vendor actions taken on customer service LAI com laints. Her latest visit was on 17 June. 25X1 25X1 2. Major Events that Have Occurred During the Preceding Week: a. Parking and Traffic Management: I/ (1) The Chairman of the Headquarters Parking/Traffic 4111) ne1010:1 6?5;01 Task Force held a meeting On 16 June to discuss Ills_pLapQap.d allocation for the parking deck, the phase-in schedule for the building, and the addition of new spaces on the compound. A follow-up meeting is scheduled for 21 June to discuss equal distribution of spaces within the covered portion of the deck. (2) The West 3 parking lot has been opened as an 25X1 overflow lot for open parking. The top level of the deck is scheduled to open 5 July as an open area. Other than visitor and handicapped spaces, permits for this area will not be issued until October concurrent with relocation of the Management, Planning and Services Staff, the Office of Near Eastern and South Asian Analysis, and the Office of East Asian Analysis of the Directorate 25X1 of Intelligence. 25X1 (3) Paving of the perimeter of South Parking Lot and the road between the New Headquarters Building and the South Parking Lot was completed on 15 June. FMD will make arrangements to stripe the newly paved area of the South Lot. Permits for this area will be'issued as an extension of the existing lane markers (e.g., additional general, reserved, official, and carpool spaces for the appropriate expanded lanes). b. New Headquarters Building: (1) FMD received from Smith, Hinchman & Grylls the construction documents for the renovation of 8,000 square feet of 4ti office space on the second floor of the New Headquarters Building (NHB). The new office area will be for the Inspector General 25X1 staff. staff. CONFIDENTIAL Declassified in Part - Sanitized Copy Approved for Release 2013/01/30: CIA-RDP90-00078R000100030040-2 Declassified in Part - Sanitized Copy Approved for Release 2013/01/30: CIA-RDP90-00078R000100030040-2 LuNriunniiku, 25X1 25X1 (2) During this period, the Integrated Logistics Support Program staff received five tractor trailer loads of CorryHiebert furniture for NHB. This brings the total to 23 tractor trailer loads delivered to the Agency. There are 9 J remaining tractor trailer loads of furniture to be delivered. c. Backfill: On 17 June, the Contracts Staff, FMD/OL, issued an Invitation for Bid for the installation of chilled water risers and condensate lines in the Original Headquarters Building (OHB). The work is part of the Headquarters Backfill Program to renovate the ORB. The solicitation package was sent to seven potential bidders and recuires that bids be submitted by 14 July. d. Scattergood-Thorne Property: FMD completed drawings for the construction of a new fence along the front of the Scattergood-Thorne property. Virginia Power has tentatively approved the fence location and FMD is awaiting official notification. FMD will forward a letter to the Virginia Department of Transportation (VDOT) confirming the approval and also will 25X1 release the drawings to VDOT. 125X1 f. The Virginia Department of Transportation (VDOT) contractor has installed permanent shoulders along Routes 123 and 193. VDOT is continuing to clean up the area and do minor landscaping. They are also restriping the roadway. Work is 25X1 99 percent complete. g. On 18 June, FMD awarded, and gave notice to proceed, to Hitt Contracting, Incorporated, a contract for the renovation of approximately 1,200 square feet of existing NHB computer space on the third, fourth, and fifth floors. The project is now 30 percent 125X1 complete. 25X1 h. As part of FMD's efforts to better meet transportation needs of handicapped employees, the Motor Pool Branch, FMD/OL, has made arrangements to lease on an ad hoc basis a specially equipped mini-bus. On two occasions, MpB has utilized this mini-bus to transport handicapped emplovees\between outlying buildings. 2 CONFIDENTIAL Declassified in Part -Sanitized Copy Approved for Release 2013/01/30: CIA-RDP90-00078R000100030040-2 Declassified in Part - Sanitized Copy Approved for Release 2013/01/30: CIA-RDP90-00078R000100030040-2 25X1 i. In conjunction with Headquarters Notice on daily newspaper delivery service to become effective 29 June, the Mail & Courier Branch (M&CB), FMD/OL, began notifying components of 25X1 the consolidated distribution points. 25X1 25X1 25X1 25X1 25X1 j. During this week, completed the portion of their trainina in the onpratinns and Support Officer Trainee SOT) Services groups of FMD. k. On 13 June, M&CB developed working plans to support the Office of Technical Service (OTS) in their upcoming relocation from South Building to NHB. Beginning 5 July, internal and external courier runs will be modified. Upon completion of the OTS move, courier service will be curtailed to South Building. 25X1 3. Upcoming Events: a. On 23 June, FMD will submit to Smith, Hinchman & G6111s. a scope of work to prepare construction documents for Soviet East European Division space on the first and second floors of the South Tower, NHB. The renovation will encompass approximately 25X1 35,000 square feet. 7X1 25X1 b. From 23 through 26 June, contractor personnel will be performing annual safety inspections on elevators in the Original Headquarters Building, the New Headquarters Building, and Printing and Photography Building. This work will require each elevator to be out of service for approximately 30 minutes. Only one elevator in a bank will be out of service at a time. The DCI elevator will be inspected on 25 June between 0900 and 0930 hours. This work has been coordinated with DCI Security. 4. Management Activities and Concerns: a. On 15 June, the Manager, Executive Dining Room, FMD/OL, in her capacity as Food Supervisor, and the Office of Medical Services (OMS) Environmental Health & Preventive Medicine Officer performed a sanitation and food temperature inspection of the Headquarters cafeteria. Several deficiencies were noted and relayed to Guest Services, Incorporated, for remedy prior to form inspection by the undie_d_stataailepar-t-Etefrt?o-f?A-g-ri?ciTrarce% 3 CONFIDENTIAL Declassified in Part - Sanitized Copy Approved for Release 2013/01/30: CIA-RDP90-00078R000100030040-2 Declassified in Part - Sanitized Copy Approved for Release 2013/01/30 : CIA-RDP90-00078R000100030040-2 25X1 25X1 25X1 25X1 25X1 LOA1 25X1 25X1 b. Personnel: (1) a senior mechanic officially announced his proposed retirement at the end of June. has been employed since August 1968 as an Automotive Mechanic and (2) On 20 June, Career Trainee (CT) renorted to the Hpadonartprs rcInsolidation Staff, FMD/OL. Acting Chief Facilities Management Division 4 CONFIDENTIAL Declassified in Part - Sanitized Copy Approved for Release 2013/01/30: CIA-RDP90-00078R000100030040-2