OL/FMD WEEKLY REPORT PERIOD ENDING 27 JULY 1988

Document Type: 
Collection: 
Document Number (FOIA) /ESDN (CREST): 
CIA-RDP90-00078R000100040021-2
Release Decision: 
RIPPUB
Original Classification: 
C
Document Page Count: 
3
Document Creation Date: 
December 23, 2016
Document Release Date: 
January 30, 2013
Sequence Number: 
21
Case Number: 
Publication Date: 
July 27, 1988
Content Type: 
MISC
File: 
AttachmentSize
PDF icon CIA-RDP90-00078R000100040021-2.pdf144.69 KB
Body: 
Declassified in Part - Sanitized Copy Approved for Release 2013/01/30: CIA-RDP90-00078R000100040021-2 LUArIDEAliRL 25X1 OL/FMD WEEKLY REPORT PERIOD ENDING 27 JULY 1988 1. Progress Reports on Tasks Assigned by or of Interest to Senior Management: None. 2. Major Events that Have Occurred During the Preceding Week: a. Status of South Side Chilled Water Lines: Operations, FMD/OL, is putting finishing touches on the draft report of the panel analyzing courses of action regarding the chilled water lined. b. Backfill Project: On 19 July, the Contracts Staff, FMD/OL, issued to ten contractors an Invitation for Bids (IFB) for renovations to the 4G corridor in the Original Headquarters Building (OHB). Bids are due by 30 August. The estimated price range for the work is between $500,000 and $1,000,000. Also, on 20 July, the Contracts Staff, FMD/OL, issued to five contractors an IFB for the renovations of the 4F corridor in the OHB. Bids are required by 18 August. The estimated price range for the work is between 25X1 $25,000 and $100,000. C, 25X1 2bAl 25X1 25X1 25X1 c. New Headquarters Building (NHB): On 22 July, the Contracts Staff, FMD/OL, opened bids for the renovations to Rooms 4C088"and 4C090, and renovations to the GJ Area. Both projects are located in the New Headquarters Building. Contracts 'will be issued to Hitt Contracting, Incorporated, and to Universal Craftsmen, Incorporated, respectively. The work in Rooms 4C088 and 4C090.is being accomplished for the Office of Training and Education, and the work in the GJ Area is for the Office of InspeCtor General. 1A0u3 cx-vick,-)oe 14 Cosi-2 d. Jogging Track Project: As reported last week, Virginia Power identified power and utility lines in the area where the jogging track will be constructed. On 19 July, Byers Engineering surveyed for telephone and sewer. On 20 July, Long Fence be .a clearing brush to install the fence along Savile Lane. c)c\\J CONFIDENTIAL Declassified in Part - Sanitized Copy Approved for Release 2013/01/30: CIA-RDP90-00078R000100040021-2 Declassified in Part - Sanitized Copy Approved for Release 2013/01/30: CIA-RDP90-00078R000100040021-2 25X1 25X1 25X1 25X1 25X1 25X1 25X1 2bA1 25X1 e. a On 20 July, 44o.e.p,a44erms-, FMD/OL, received from SAIC Architects, Incorporated, the final construction drawings, speci tions, and cost estimate for the relocated Child Day Care Center (CDCC). -9-peritt-4-en-s-r-w4-1-1-4-a-lee-f740 41/IL responsibility for construction; requesting construction bids, and 440 contract award no later than 15 September. The project designs have also been submitted to the National Capital Planning Commission (NCPC) and Fairfax County for their review and approval, which is expected no later than 30 September. A proposal will be requested from SAIC Architects for construction submittal review and for periodic inspection and post construction service. f Lairt?AT4444;4-e-r4TT?tres4T11-41po4444 On 18 and 19 July, professional conservators cleaned and restored all paintings permanently displayed in Headquarters public areas. Some of these paintings, which have a total value of $350,000, showed some evidence of damage in addition to normal soiling. h. On 22 July, Allied received a quick start memo for a renovation in 7D39 OHB for the Deputy General Counsel for Intellioence Onerations. The deadline date of 25 July was met. i. Allied received a quick start memo to replace 13 light poles and eight fixtures in West A lot. The work was erformed on 23 July by Allied's subcontractor, Kelley Electric. 2 CONFIDENTIAL Declassified in Part - Sanitized Copy Approved for Release 2013/01/30: CIA-RDP90-00078R000100040021-2 Declassified in Part - Sanitized Copy Approved for Release 2013/01/30: CIA-RDP90-00078R000100040021-2 LUNPIDLNIIAL ecia."/? letrtat- 410 ./L4,;1-1104,4 /1^44;.- ?2/14.../ "Atez 25X1 4.4.414" k. The GSA project for first floor reroofing las started. and is expected to be completed by 31 December. The project is on schedule with only minor lfaks orcurrina (thrill? the removal of the 25X1 old wet tar roof surface. 25X1 25X1 25X1 25X1 25X1 1. On 26 July, FMD representatives traveled to New York to make an award fee presentation to Ogden Allied. Although the overall evaluation is generally favorable, specific areas for improvement have been identified and included as goals for the \ fourth quarter evaluation period (1 July - 30 September 1988). 3. Upcoming Events: None. 4. Management Activities and Concerns: a. Personnel: been assigned to the Motor ?Branch, FMD/OL. Chief cilities Management Division 3 CONFIDENTIAL Declassified in Part - Sanitized Copy Approved for Release 2013/01/30: CIA-RDP90-00078R000100040021-2