REPORT OF SIGNIFICANT LOGISITICS ACTIVITIES FOR THE PERIOD ENDING 19 JULY 1988
Document Type:
Collection:
Document Number (FOIA) /ESDN (CREST):
CIA-RDP90-00078R000100040028-5
Release Decision:
RIPPUB
Original Classification:
S
Document Page Count:
4
Document Creation Date:
December 23, 2016
Document Release Date:
January 30, 2013
Sequence Number:
28
Case Number:
Publication Date:
July 20, 1988
Content Type:
MEMO
File:
Attachment | Size |
---|---|
![]() | 114.75 KB |
Body:
20 July 1988
i
125X1
MEMORANDUM FOR: Deputy Director for Administration
FROM: John M. Ray
Director of Logistics
SUBJECT: Report of Significant Logistics
the Period Ending 19 July 1988
1. Events of Major Interest That Have Occurred During the
Preceding Week:
a. During this reporting period, the Printing and
Photography Group, OL, established the first copier operations
center in the Information Service Center of the New Headquarters
Building (NHB). When complete, the NHB will have five copier
centers staffed by Office of Information Technology personnel:;
'.25X1
125X1
Declassified in Part - Sanitized Copy Approved for Release 2013/01/30: CIA-RDP90-000788000100040028-5
b. On 13 July, representatives from the Offices of
Logistics and Curren al Support'met to
discuss th Since the manual is 25X1
to be used synthetic plastic stock wi:l'1--Lbe used for 25X1
durability. W en t e job is printed, 2,000 copies will be sent to a
commercial binder for wire binding. This job is scheduled for
completion in December.
~ ~ r n ~ m
Declassified in Part - Sanitized Copy Approved for Release 2013/01/30: CIA-RDP90-000788000100040028-5
~ ~ r" n ~ m
Declassified in Part - Sanitized Copy Approved for Release 2013/01/30: CIA-RDP90-000788000100040028-5
25X1
'25X1
h. The General Services Administration (GSA) has advised
the Real Estate and Construction Division, OL (RECD/OL), that it is
in the process of exercising the renewal options on the Ames and
Chamber of Commerce Buildings. The lease expires on both buil-dings
in January 1989. Prior to renewal, GSA has requested that RECD
provide a plan for the removal of asbestos in Ames and respond to
several fire and safety violations that were discovered. RECD has
worked out a plan to relocate the Office of Personnel components
located on the 2nd floor of Ames too while the asbestos is
being removed. and is formulating a response to the fire and safety
Declassified in Part - Sanitized Copy Approved for Release 2013/01/30: CIA-RDP90-000788000100040028-5
c ~ /~ n ~ m
Declassified in Part - Sanitized Copy Approved for Release 2013/01/30: CIA-RDP90-000788000100040028-5
* j. On 15 July, ~QL reports tha.~ the dedication plaque for
~ the New Headquarters Building (NHB) was moved from the 1D corridor
of the Original Headquarters Building to the 4th floor entrance of
25X1 the NHB by the contractor, Wood and Stone.
25X1
25X1
25X1
k. OL reports that the drawings for -the new perimeter fence
on the Scattergood-Thorne property (west side of the main entrance)
have been sent to the Headquarters Security Division, OS, for
approval. As soon as the Virginia Department of Highways approves
the location of the fence and OS has given their approval, the
contract will be issued for bids.
1. On 15 July,[Q~ awarded a $44,165 contract to the Long
Fence Company for construction of a fence along Saville Lane. On
18 July, Miss Utility came to identify power and utility lines
located in the area, and on 20 July construction began on the
Declassified in Part - Sanitized Copy Approved for Release 2013/01/30: CIA-RDP90-000788000100040028-5
Declassified in Part - Sanitized Copy Approved for Release 2013/01/30: CIA-RDP90-000788000100040028-5
25X1
25X1
`s. On 12 July, OL awarded a contract in the amount of
$229,000 to JAK Construction, Incorporated, for renovations to the
Office of General Couns the South Tower of the New
Headquarters Building.
2. Significant Events Anticipated During the Coming Week:
OL reports that removal of ceiling the from the 6th floor
of the Key Building has been scheduled for the weekend of 23 July.
Procedures for removal have been revised to prevent the contractor
from failing to complete the removal on time. To date, the
contractor has met all new Virginia State training regulations
regarding asbestos removal and is presently removing asbestos Wipe
insulation from the penthouse area.
John M. Ray
S E C R E T
Declassified in Part - Sanitized Copy Approved for Release 2013/01/30: CIA-RDP90-000788000100040028-5