OL/FMG WEEKLY REPORT PERIOD ENDING 16 NOVEMBER 1988

Document Type: 
Collection: 
Document Number (FOIA) /ESDN (CREST): 
CIA-RDP90-00078R000100080037-1
Release Decision: 
RIPPUB
Original Classification: 
S
Document Page Count: 
4
Document Creation Date: 
December 27, 2016
Document Release Date: 
April 26, 2013
Sequence Number: 
37
Case Number: 
Publication Date: 
November 16, 1988
Content Type: 
MISC
File: 
AttachmentSize
PDF icon CIA-RDP90-00078R000100080037-1.pdf224.88 KB
Body: 
Declassified in Part - Sanitized Copy Approved for Release 2013/04/26: CIA-RDP90-00078R000100080037-1 ILLEGIB 25X1 25X1 25X1 SECRET OL/FMG WEEKLY REPORT PERIOD ENDING 16 NOVEMBER 1988 1. Progress Reports on Tasks Assigned by or of Interest to enior M na ement: The Art-in-Architecture project members consisting of General Services Administration (GSA), National Endowment for the Arts appointees and Fine Art Commission appointees will meet on 29 November. Final designs for the_New Hes_aseutaaiNilaing_(NHB) exteapr sculptus_e will be reviewed and a senior Agency official will have to sign official approval at that time. In addition, the panel members will select an artist to create interior art, due to the withdrawal of the originally selected artist, Mat Mullican. 2. Major Events that Have Occurred During the Preceding Week: a. Status of South Side Chilled Water Lines: No change. b. New Headquarters Building (NHB): (1) On 10 November, 19 people from the Office of SIGINT Operations (OSO) were moved from the Original Headquarters Building into the second floor, North Tower of the New Headquarters Building. The move went extremely well and OSO is quite pleased with their new space. A post move walk-through held on 14 November revealed only one deficiency. Two Wang printer drops had been overlooked; however, the Office of Information Technology pledged to install these drops immediately. (2) Furniture Delivery: The Integrated Logistics Support Program (ILSP) Staff received five tractor trailer loads of CorryHiebert furniture for the New Headquarters Building during the week of 7 November. An additional four tractor trailer loads of furniture are scheduled for delivery the week of 21 November. (3) Wall Sound Proofing: An investigation into sound conduction problems through hollow walls in the NHB is in process. The concern is that conversations in one room can be overheard in adjacent areas. The Design and Engineering Branch, D/FMG/OL, has measured sound (decibel) levels in the IG office area, which will be used for a test. Ogden Allied is installing SECRET Declassified in Part - Sanitized Copy Approved for Release 2013/04/26: CIA-RDP90-00078R000100080037-1 Declassified in Part - Sanitized Copy Approved for Release 2013/04/26: CIA-RDP90-00078R000100080037-1 SECRET high density blown-in insulation inside the walls of the test area. After insulation, FMG will again measure sound levels to see what reduction is achieved. FMG has also changed the NHB construction standards to exclude all hollow partitions from all 25X1 new construction. (4) Security Trash Chutes: The North and South ower trash chutes have been tested successfully and will be placed 25X1 into service once accepted and approved by GSA and FMG. 25X1 (5) Direction and identification sign installation in the north tower and .Atrium of the NHB is now complete. Also expediegd werg-the manufacture and installation of elevator numbers, atrium glasq rnnm and P1PVAi- r telephone emergency 25X1 instruction signs. c. Backfill Project - GC03 Computer Center Renovation: Demolition work in GC03 is 95 percent complete and the contractor has requested a switch to the day shift for new construction work as per his contract. Because of a shortage of escorts during the day shift, the Headquarters Consolidation Branch, SPD/FMG/OL, has requested a cost from the contractor to continue working the 25X1 1600-2400 shift. d. Scattergood-Thorne Property-Renovation: A letter 0.dintended to solicit responses from interested architectural firms 46` for designing the conversion of the Main and Guest Houses at VieK,Scattergood into a conference center is being prepared. This letter, along with a list of firms, will be forwarded to FMG/Contracts Staff for processing. All responses to the letter will be evaluated, and a short list of qualified firms will be developed from which to make a final selection. 25X1 25X1 125X1 25X1 25X1 0 e. Jogging Track Project: This project is on hold pending a decision from FMG management. Alternatives were forwarded to FMG management on 8 November for consideration. A meeting has been scheduled with the Park Authority on 15 November to review the construction drawings. Other alternatives will be provided by Dewberry and Davis. f. Child Day Care Center (CDCC) Project: Grading work CDCC site continues. Contracts with SAIC Architect, Inc., designers of the project, for professional services during the construction effort, and with Professional Services Industries, Inc. for construction materials testing, are being processed. These services are essential at this point to continue the construction effort. Ogden Allied was also tasked to provide temporary electric power to the construction site. at 2 SECRET Declassified in Part - Sanitized Copy Approved for Release 2013/04/26: CIA-RDP90-00078R000100080037-1 Declassified in Part - Sanitized Copy Approved for Release 2013/04/26: CIA-RDP90-00078R000100080037-1 SECRET g. Central Plant Boiler: On 8 November, representatives of the Hartford Steam Boilers Inspection and Insurance Company performed a safety and operational inspection of Boiler No. 2. Hartford confirmed that the induced draft fan of this boiler is undersized for full load operation and recommended that the boiler should not be operated above approximately 50 percent of its rated 25X1 capacity until the boiler modifications project is completed. 25X1 25X1 h. DCI Tunnel: Construction of the guardhouse for the DCI Tunnel Entrance was delayed due to the discovery of unsuitable subsurface conditions. Geotechnical engineers were brought to the site, but were unable to make a definitive assessment without testing to determine specific information about the soil composition. Based on inspection, there was a loose fill material to a depth of at least six feet. The Facilities Operations Branch project officer in consultation with Design and Engineering Branch will determine how to proceed. The solution suggested by the geotechnical engineer is to excavate to firm ground and provide compacted fill up to the required level. Design and Engineering Branch has asked for a written assessment from the engineer so that a final determination can be made. 5X1 25X1 25X1 25X1 25X1 K. Renovation activities at the E-Street complex continue. The Office of Training and Education has confirmed plans to OCCUPY East and South Buildings on or about 12 January 1989. 1. UPS Installation for 0 A 10 KVA and a 30 KVA UPS system has been delivered to the Office of Security and electrical installation is now in progress. This installation is expected to be complete on or about 28 November. 3 SECRET Declassified in Part - Sanitized Copy Approved for Release 2013/04/26: CIA-RDP90-00078R000100080037-1 Declassified in Part - Sanitized Copy Approved for Release 2013/04/26: CIA-RDP90-00078R000100080037-1 25X1 25X1 25X1 25X1 25X1 25X1 25X1 12 SECRET m. Renovation of Space for OSO: Representatives from External Buildings Division, FMG/OL, met with representatives from OSO to discuss the installation of a screen room on the second floor The installation of a large computer room on the first floor was also discussed. Preliminary drawings have been started and will be completed by the 1 December. n. Asbestos Removal agreed between the contractor, asbestos removal will begin the completion should be circa It is mutually and the Agency that the on 21 November and 16 December. 5X1 25X1 25X1 3. Upcoming Events: None 4. Management Activities and Concerns: Escort Problems: Allied custodial continues to find it increasingly difficult to perform their assigned duties due to lack of escorts. The lack of escorts is affecting their ability to clean our buildings. Following are recent statistics: Date Requirement Received Shortage 11/04 54 27 27 11/07 57 27 30 11/08 53 22 31 11/09 46 22 24 11/10 48 25 23 Chief Facilities Management Group 4 SECRET Declassified in Part - Sanitized Copy Approved for Release 2013/04/26: CIA-RDP90-00078R000100080037-1