TRANSPORTATION OF U-2 AIRCRAFT FROM PALMDALE TO WASHINGTON

Document Type: 
Collection: 
Document Number (FOIA) /ESDN (CREST): 
CIA-RDP90B00170R000100040018-1
Release Decision: 
RIPPUB
Original Classification: 
K
Document Page Count: 
4
Document Creation Date: 
December 22, 2016
Document Release Date: 
September 29, 2011
Sequence Number: 
18
Case Number: 
Publication Date: 
February 1, 1982
Content Type: 
LETTER
File: 
AttachmentSize
PDF icon CIA-RDP90B00170R000100040018-1.pdf85.46 KB
Body: 
Lockheed Corporation Burbank, California 91520 C. L.Jobnson Senior Mvisor Subj: TRANSPORTATION OF U-2 AIRCRAFT FROM PAL14DALE TO WASHINGTON As I mentioned to you on the phone, we have completed a study on how to fly the U-2 Aircraft from Palmdale to Washington for installation in the Smithsonian Museum. After several check flights here, the airplane would be flown back with the J-75 engine installed. We would remove the canoe on top of the fuselage to return it to the U-2A configuration. After the flight to Washington we would propose installing a J-57 engine in the Aircraft. You will see information presented in the attachment to this letter for the cost of trucking compared to flying the aircraft back. I believe it would be much more desirable to fly the airplane. A list is appended on the support equipment required which we would have to send to Washington by truck to get the aircraft from wherever it lands to the Smithsonian museum. The total cost for flying the aircraft to Washington is $121,000. We have not included our normal overhead in administrative costs in that number. I do not know how much of the $121,000 Lockheed is prepared to contribute, but I am sure that I cannot get the total amount as I discussed with you on the phone. Schedule information is included on the attachment. Clarence Johnson Sanitized Copy Approved for Release 2011/09/29 : CIA-RDP90B00170R000100040018-1 SUPPORT EQUIPMENT REQUIREMENT FOR ASSEMBLY/DISASSEMBLY OF U-2C AIRCRAFT GH36 Hoist Sling-Fin GH67 Sling-Stabilizer Hoisting GH81 Sling Assembly - Aft Fuselage GH93 Sling Assembly - Wing Hoist GH122 Aft Fuselage Dolly GH126 Transportation Cart - Wings, Aft Fuselage, Tail Pipe, Stabilizer, Fin and Pogos GH194-25 Wing Installation Cart GH194-26 Wing Installation Cart 75GH114-1 Track Assembly - Engine Installation 75GH109-100 Model 4160C (or) J75 Engine Transportation Cart Assembly Model 4160D J75 Engine Installation Trailer Model 4100 J57 Engine Installation Trailer Model 3000 J57 Engine Transportation Trailer Sanitized Copy Approved for Release 2011/09/29: CIA-RDP90B00170R000100040018-1 to 1 TRANSPORTATION OF U-2 AIRCRAFT FROM PALMDALE TO WASHINGTON D.C. BUDGETARY COST BREAKDOWN FLY TRUCK LABOR (See Page 2) 2,100 Hours 1,400 Hours TRUCKING One Truck Two Trucks AIRFARE 8 Men Round Trip 7 Men Round Trip LODGING AND PER DIEM 139 Man Days 49 Man Days $52,000 24,000 4,500 5,000 AUTO RENTAL 2 Autos for 19 Days 2 Autos for 7 Days OVERTIME PREMIUM 6 Men for 1-Saturday and 1-Sunday -0- 1,000 TOTAL BUDGETARY COST $110,000 $87,000 Additional Amount Required For SCHEDULE: 357 Engine Installation $ 11,000 $11,000 Perform labor effort to prepare aircraft for flight from Palmdale Site 2 to East Coast . . . . . . . . . 2 Weeks Receive aircraft, disassemble and load on truck unload and reassemble at museum. . . . . . . . . . . 3 Weeks Perform labor effort to prepare aircraft for truck shipment from Palmdale Site 2 to East Coast and load onto truck . . . . . . . . . . . . . . . . . . . 2 Weeks Truck aircraft to East Coast, unload and reassemble aircraft at museum. . . . . . . . . . . . 2 Weeks NOTE: Add an additional 3 weeks to above schedules for J57 Engine Installation. Sanitized Copy Approved for Release 2011/09/29: CIA-RDP90B00170R000100040018-1 Sanitized Copy Approved for Release 2011/09/29: CIA-RDP90B00170R000100040018_1 3e 2 TRANSPORTATION OF U-2 AIRCRAFT FROM PALMDALE TO WASHINGTON D.C. BUDGETARY LABOR COST BREAKDOWN PALMDALE SITE 2 Strip Paint $ 8,000 $ 8,000 Repaint or A cid Etch 4,000 4,000 Canoe Struct ure Rework 8,000 Misc. Rework Flight Prepa , Install Engine and ration or Load on Truck 16,000 8,000 $47,000 EAST COAST Receive, Disassemble and Load on Truck $15,000 -0- Unload Truck and Reassemble 12,000 12,000 Travel Time 7,000 6,000 $18,000 $52,000 Crew Required on East Coast: 1-Supervisor 1-Electrician 5-Mechanics 1-P.E. Man (required only if we fly)