INSTALLATION OF LASERFAX REPLACEMENT SYSTEM PROTOTYPE
Document Type:
Collection:
Document Number (FOIA) /ESDN (CREST):
CIA-RDP90G00993R000100160005-4
Release Decision:
RIPPUB
Original Classification:
S
Document Page Count:
5
Document Creation Date:
December 23, 2016
Document Release Date:
October 1, 2012
Sequence Number:
5
Case Number:
Publication Date:
August 29, 1986
Content Type:
MEMO
File:
Attachment | Size |
---|---|
![]() | 137.52 KB |
Body:
Declassified in Part - Sanitized Copy Approved for Release 2012/10/02 : CIA-RbP90G0099314600100160005-4
???
OD&E-0290-86
2 9 AUG 1986
MEMORANDUM FOR: Director of Information Technology
VIA: C/TCD/MSG/OD&E
FROM:
SUBJECT:
Director of Development and Engineering
Installation of LASERFAX Replacement System
Prototype
1. Your assistance is requested for the installation of
the Headquarters communications required for a demonstration of
the LASERFAX Replacement System (LxR) Prototype. The prototype
will demonstrate the feasibility of replacing the existing
LASERFAX imagery transmission system with work stations capable
of receiving, displaying, manipulating, and transmitting
imagery with enhanced speed and quality. The installation and
operation of the prototype is a highly visible, time critical
project funded by the DDI with OD&E serving as the executive
agent.
2. The Headquarters work station will be installed in
DI/OIR space in Room GH44. The installation of communications
for the LxR prototype within the Headquarters building should
be complete by 20 October 1986. The work station components
are listed in Attachment 1 and the power and cooling
requirements are listed in Attachment 2. An inspection of the
proposed location was conducted with ESG/OIT personnel on 18
August and the facility appears to have adequate power and
cooling. OD&E will provide a Ti microwave link, a KG-81, and
the required modems in addition to the communication items
listed in Attachment 1. The known support required from OIT is:
a. A location within a communications center for a
KG-81 and two modems.
b. A line from the microwave termination point to the
KG-81.
C.
25X1 GH-44.
ne from the KG-81 location to workstation in
Declassified in Part - Sanitized Copy Approved for Release 2012/10/02 : CIA-RDP90G00993R000100160005-4
25X1
25X1
25X1
G.J/V I
Declassified in Part - Sanitized Copy Approved for Release 2012/10/02 : CIA-RDP90G00993R000100160005-4
25X1
SECRET
SUBJECT: Installation of LASERFAX Replacement System Prototype
3. The Headquarters installation is being coordinated with
ESG/OIT and preliminary discussions h n held with
(communication issues) and (COMSEC
issues). ADP Security Procedures are being coordinated with
Information Systems Security Division, Office of Security
(ISSD/OS).
4. Point of contact for the LxR prototype installation is
Attachments:
As stated
CONCUR:
unier, Telecommunications Division, OD&E Date
SEC2RET
OD&E-0290-86
Declassified in Part - Sanitized Copy Approved for Release 2012/10/02 : CIA-RDP90G00993R000100160005-4
25X1
25X1
25X1
25X1
Declassified in Part - Sanitized Copy Approved for Release 2012/10/02 : CIA-RDP90G00993R000100160005-4
SECRET
SUBJECT: Installation
of LASERFAX
Replacement System Prototype
ODE/CSG/GED
(21 Aug 86)
25X1
Distribution:
Orig --Addressee. w/atts
25X1
1 - w/o atts
1 - TCD/MSG/OD&R, w/atts
1 - GED/CSG, w/atts
25X1
1 - GED Chrono, w/o atts
OD&E-0290-86
3
SECRET
Declassified in Part - Sanitized Copy Approved for Release 2012/10/02 : CIA-RDP90G00993R000100160005-4
Declassified in Part - Sanitized Copy Approved for Release 2012/10/02 : CIA-RDP90G00993R000100160005-4
UNCLASSIFIED
'LASERFAX REPLACEMENT SYSTEM
PROTOTYPE CONFIGURATION
1. LxR Prototype: - Work Station Components
a. SUN 2/160 Microcomputr with 71 MB disk
b. 19 inch Landscape Color monitor (SUN equipment)
c. Fujitsu Eagle 380 MB disk drive
d. SORO Visor-D Continuous Tone printer
e. MITEK 100T Laser Printer
f. Imagitex 1085 Optical Scanner
g. Eiconix Optical Scanner
h. VME/Multibus Adapter, SUN 2/160-OPT-17
i. Systek Datacom DCP8804-512, Communication
Processor Board
j. Coastcom D/I Multiplexer
(1) 30036-003 Synchronous Data Channel Unit
(2) 30012-001 Synchronous Data Channel Unit
k. Avanti TS-2300 Interface Converter
1. KG-81 Encryption Device, T-1 compatible
2. LxR Prototype will consist of 2 work stations. Each
workstation will have one of each of the above components. The
components occupy 40 sq. ft. including programmer's desk and equipment
rack.
3. Approved open shelf storage will be available at both sites.
Declassified in Part - Sanitized Copy Approved for lie7a-se2.0715/1-176T/02 : CIA-RDP90G00993R000100160005-4
Declassified in Part - Sanitized Copy Approved for Release 2012/10/02 : CIA-RDP90G00993R000100160005-4
UNCLASSIFIED
LASERFAX REPLACEMENT SYSTEM (LxR)
POWER AND COOLING REQUIREMENTS
1. Based on the data received from the contractors, the
power requirements and heat production for an LxR work station
are:
DEVICE
AMPS
POWER
HEAT
(watts)
(BTU/hr)
MONITOR
3
250*
850*
CPU
6
600*
2040*
IMAGE PRINTER
4
440*
1496*
DISK DRIVE
6
636*
2162*
SCANNER
5
575*
1955*
LASER PRINTER
8
850*
2890*
MULTIPLEXER
2
100*
340*
TOTAL
34
3451*
11733*
*estimate
2. The requirements assume single phase, 120 volt, 60
hertz power. The contractor suggests that two isolated, 20 amp
circuits with single 20 amp locking plugs be provided. The
equipment would then be plugged into power strips which would
be provided by the contractor.
UNCLASSIFIED
Declassified in Part - Sanitized Copy Approved for Release 2012/10/02 : CIA-RDP90G00993R000100160005-4