NEW HEADQUARTERS BUILDING CONSTRUCTION MONTHLY REPORT OF OBLIGATIONS AND EXPENDITURES - FEBRUARY AND MARCH 1988
Document Type:
Collection:
Document Number (FOIA) /ESDN (CREST):
CIA-RDP91-00981R000100070018-9
Release Decision:
RIPPUB
Original Classification:
S
Document Page Count:
2
Document Creation Date:
December 27, 2016
Document Release Date:
March 5, 2013
Sequence Number:
18
Case Number:
Publication Date:
April 11, 1988
Content Type:
MEMO
File:
Attachment | Size |
---|---|
![]() | 92.17 KB |
Body:
Declassified in Part- Sanitized Copy Approved for Release 2013/03/05: CIA-RDP91-00981R000100070018-9
MEMORANDUM FOR:
Comptroller
FROM:
R. M. Huffstutler
Deputy Director for Administration
SUBJECT:
New Headquarters Building Construction
Monthly Report of Obligations and
25X1
Expenditures - February and March 1988
REFERENCE:
Memo for Comptroller fm DDA, dtd 30 Jan
Same Subject
85,
1. Attached is a summary of the obligations, commitments
and expenditures in FAN 81-2000, New Headquarters Building
(NHB) Construction for February and March 1988 (Attachment A).
For FY 84, three commitments totaling $59,307 were transferred
to FY 85. We obligated $4,637.42 and expended $5,091.68 for
Palmar blueprints. We expended $7,290 for a site survey of the
area between the northwest side of the NHB and the Printing &
Photography (PPD) Building and $9,253.80 for the numbering of
the offices in the NHP. We obligated $9,047.50 for tamper
resistant screws and $65,000 to provide additional electrical
poweni14r conditioning for the self-filter room in the
25X1 NHB.
25X1
25X1
2. For FY 85, we decommitted $12,000 for the truck wheel
washing station. We obligated $18,196 and committed an
additional $3,500 for modifications to the South Filter (B/B)
room. We committed $24,476 to test for leakage on the
southside chilled water line; obligated $9,777 to re-pipe the
main condensate lines; obligated $7,384 for repair of water
damage to the Office of Technical Service (OTS) area in the
NHB; and committed $6,000 for renovations to rooms 6D012 and
SECRET
Declassified in Part - Sanitized Copy Approved for Release 2013/03/05: CIA-RDP91-00981R000100070018-9
Declassified in Part- Sanitized Copy Approved for Release 2013/03/05: CIA-RDP91-00981R000100070018-9
SUBJECT: New Headquarters Building Construction Monthly
Report of Obligations and Ex enditures -
25X1 February and March 1988
6D011. We obligated $40,707 and committed an additional $7,439
for roof drains and water softeners for the Central Plant. We
committed $102,975.54 to install the partial height partitions;
$10,000 for completion of the "GB" corridor which leads from
the Old Headquarters Building (OHB) to the South Loading Dock;
$3,000 to install and connect fiber optic cable for the fire
alarm system; $60,126 for the PASS project and $3,000 to
provide power and cooling for room 3C076. We obligated
$378,200 and recommitted $71,800 for the OTS lab renovations.
We obligated $53,277 to install new floor grates in the
Powerhouse. We reduced our commitment for the RF Shield by
$43,238.36 and obligated the balance of $71,048. We expended
$12,880 for the extension of three conduit banks; $19,958.07
for the RF Shield; $84,599.46 for architectural and engineering
services for the cafeteria expansion; $473 for electrical and
chilled water service; and $775,334.87 for the Route 123
improvements. We reduced our obligation for interest penalty
125X1 by $349.72.
3. The monthly Open Obligation Activity Report (00AR) and
the Open Commitment Activity Report (OCAR) for this FAN as of
29 February and 31 March 1988 are provided as Attachment B.
The Status of Allotment R ort for the period ending 22 March
25X1 1988 is Attachment C.
4. Any questions regarding this report and the FAN 81-2000
transactions may be referred to the Chief, Budget and Fiscal
25X1 Branch, OL, on
125X1
Attachments: A-C
OL/BUE
(11 Apr 88)
Distribution:
Orig - Addressee (w/atts)
2 - DDA (w/atts)
tY- OL Files (w/o atts)
1 - OL/BUB Official (w/atts)
1 - OL/BUB Chrono (w/o atts)
SECRET
R. M. Huffstutler
Declassified in Part- Sanitized Copy Approved for Release 2013/03/05: CIA-RDP91-00981R000100070018-9