TEMPORARY SPACE IN THE NEW HEADQUARTERS BUILDING

Document Type: 
Collection: 
Document Number (FOIA) /ESDN (CREST): 
CIA-RDP91B00060R000100210008-4
Release Decision: 
RIPPUB
Original Classification: 
C
Document Page Count: 
3
Document Creation Date: 
December 27, 2016
Document Release Date: 
February 4, 2013
Sequence Number: 
8
Case Number: 
Publication Date: 
October 17, 1988
Content Type: 
MEMO
File: 
AttachmentSize
PDF icon CIA-RDP91B00060R000100210008-4.pdf105.21 KB
Body: 
r Declassified in Part- Sanitized Copy Approved for Release 2013/02/05: CIA-RDP91B00060R000100210008-4 CONFIDENTIAL OIT 0971-88 17 OCT iggg' MEMORANDUM FOR: Director of Logistics FROM: Edward J. Maloney Director of Information Technology SUBJECT: Temporary Space in the New Headquarters Building REFERENCES: A. Memo for D/OL, from D/OIT, dtd 23 August 1988, Same Subject B. Memo for D/OIT, from D/OL, dtd 21 July 1988, Same Subject 1. It has come to our attention that the office space made available for 25X1 occupancy of people in the OIT Engineering Services Group (ESG) is not adequate. Your offer of the Polygraph Division space on the fourth floor of the north tower of the New Headquarters Building (NHB) appeared to satisfy our needs. In reviewing the 35 and 100 per cent drawings, we see that an area of 25X1 only square feet has actually been designated for our use instead of the 25X1 expected square feet. Unfortunately, such an unexpected reduction in 25X1 work area for our employees and their equipment, even in the as is condition to which we agreed, would leave us with a serious and unmanageable 25X1 shortfall. Not only do we need office space for employees and their supplies, but also adequate space for the group chief and his deputies to conduct their managerial and leadership tasks with employees as well as their meetings, and those of their employees, with ESG's numerous contractors. 25X1 2. We now understand that the balance of the sq. ft. is being reserved to store office furniture. We request that this contiguous space 25X1 also be made available for occupancy of the ESG employees being relocated during the 1 to 7 February timeframe as part of the backfill and renovation of the CCB. If this space cannot be made available to accommodate this 25X1 DOWNGRADED to UNCLASSIFIED WHEN SEPARATED FROM ATTACHMENT CONFIDENTIAL Declassified in Part- Sanitized Copy Approved for Release 2013/02/05: CIA-RDP91B00060R000100210008-4 Declassified in Part- Sanitized Copy Approved for Release 2013/02/05: CIA-RDP91B00060R000100210008-4 CONFIDENTIAL 25X1 requirement, it will be necessary for OIT to continue to occupy 1C14 Building to accommodate the overflow that cannot be housed in the NHB. 25X1 4. We are sure you share our concern that these employees be suitably housed so that they can get to the work at hand. Since their reprieve from the planned move this month, we now have until early February to provide the needed, connectivity and wiring required to accommodate either of the above alternatives. Please let us know if the additional office space in the NHB can be made available affording ESG the amount of working space upon which we based our 'ready acceptance of your offer and that we have been anticipating for our employees. LUWaLrA maionex_ CONFIDENTIAL L Declassified in Part - Sanitized Copy Approved for Release 2013/02/05: CIA-RDP91B00060R000100210008-4 Declassified in Part - Sanitized Copy Approved for Release 2013/02/05 : CIA-RDP91B00060R000100210008-4 CONFIDENTIAL MEMORANDUM FOR: Director of Logistics VIA: 01T-0813-88 2 3 AUG 1988 Deputy Director for Administration FROM: Edward J. Maloney Director of Information Technology SUBJECT: Space REFERENCE: Memo for D/OIT, from D/OL, dtd 21 July 1988, Subject: Space _1,-. TE-e temporary solution you propose in paragraph four of the reference ).2---6Minently acceptable as an interim measure to satisfy the. space 25X1 requirements of the Engineering Group employees. Additionally, we agree to take the space Ras is, including the use of the 60 inch screens.' Moreover, we will be happy to work with your people to ensure that sufficient phones and connectivity are made available as economically as possible. Toward this end, OIT will do its best to work the wiring of phones, computers and associated .equipment into our schedule so as not to impinge on the overall scheduling of the preparation of the New Headquarters Balding. With respect to the caveat on the style of furniture permitted in the New Building, as soon as we have the office layouts from your Facilities Management Division design people, we will order the appropriate Corey-Heibert furniture. 25X1 2. I very much appreciate your assistance in resolving this matter and look forward to working with your people to facilitate the preparation of the area. Downgraded UNCLASSIFIED when Separated From Attachment cowar.a7u-; MatbrAoy C Declassified in Part- Sanitized Copy Approved for Release 2013/02/05: CIA-RDP91B00060R000100210008-4