(Classified)ESTIMATED COSTS OF CONSTRUCTION AND EQUIPMENT FOR THE NATIONAL INDICATIONS CENTER
Document Type:
Collection:
Document Number (FOIA) /ESDN (CREST):
CIA-RDP93T01468R000100100039-6
Release Decision:
RIPPUB
Original Classification:
K
Document Page Count:
2
Document Creation Date:
December 9, 2016
Document Release Date:
July 28, 1998
Sequence Number:
39
Case Number:
Publication Date:
November 8, 1954
Content Type:
MEMO
File:
Attachment | Size |
---|---|
![]() | 184.13 KB |
Body:
a
a Approved For Release 2001/03/07 : CIA-RDP93TO1468R00010010
25X1A1a
add
it ) no
tofu
I3&Dgip. DA PnVWWUM Zor t1a con Almct
25X1 Al a t" in * dv n
t a coat OSUMI " totau
25X 1 Al NIMPIMW ar It a 0-
WOWUAU am saw=
i~, ) as vw 4=c for the
reftbas
25X1Ala OF s tt tai, ~T b
; 77
' '
I&Ort,
meat
V~ to 0 170 Wit, to
at 20 test ~ bo buM cc t+t ; & fire v IPC4W and sound or
p A llug t const t st
2 4 f o tat no= d it 32 reato r or
thr- apamw int+ VWUUAuc t oong to a of
32 t to a totem at " revt in jeacth. -
jIm 7C 6 #
-VAX
to rat tbj- a ----s_ --- -_ 4w - ..,sumbmaum
..pdmrwmww^* 4"wIM The *a it a w
on INII x4 i *U*ti Of
ducts
?
4fx a n4it ,Rg owrto*c . e C t c iz to
MWO tom Of OWVWWU= in tjn t
eft with the ~~ 4thM& Cwt Of SQsatw4t
mmift
Approved For Release 2001/03/07 : CIA-RDP93TO1468R000100100039-6
Approved For ease 2001/03/07 : CIA-RDP93T?468R000100100039-6
?
b. Because the estimate of costs for the construction of the 25X1 Al a
Center in the B t area now exceeds the aaa aunt of - to be
provided by CIA and the Departments of the Army., Navy and Air Force,
even without the inclusion= of a margin for unforeseen contingencies,
and because construction or equipment of the ieuter might be delayed
while supplemental allocations were sought,, it might be advisable to
provide for a total construction and equipment allocation of
by requesting each of the four contributing aencies to provi 25X1 Al a
25X 1 Al ainastead of toward the construction and equipment fund. I
understand that the Air Force plans to proceed with construction and
eq+.di.ent of the Center on a cost-reimbursable basis, billing CIA,
Army and Navy for their pro rata shares u n completion. Since the
bill for each is likely to exceed theeach is directed to pr?-25X1 Ala
vide by the version of the directive at Tab C, I would recur end that
a revised directive (See Tab D) be .adopted in its plane. If construe..
tion costs are ultimately less than presently estimated, a portion of
the individual allocations would in effect be returned to the con-
tributors.
25X1A9a
Director
National Indications Center