CABLE FROM(Sanitized)
Document Type:
Collection:
Document Number (FOIA) /ESDN (CREST):
CIA-RDP99B00048R000100270008-1
Release Decision:
RIPPUB
Original Classification:
S
Document Page Count:
2
Document Creation Date:
December 14, 2016
Document Release Date:
October 21, 2002
Sequence Number:
8
Case Number:
Publication Date:
September 20, 1968
Content Type:
CABLE
File:
Attachment | Size |
---|---|
![]() | 91.27 KB |
Body:
Approved For Rele"e 2002/10/31 : CIA-RDP99B00048R000400270008-1
S E C R E T
IN 2 895 T
TOR 20/2030 SEP 68 JMP
S E C R E T 2019292 SEP 68 CITE
w
1 25X1 A IMMEDIATE
'" SCOPE CROSS/ IDEALIST /R&D /MAT /OPS
25X1A REF As
mr
IN 28941
S 1 TELECOM BETWEEN
REF MESSAGE HAS BEEN STAFFED BETWEEN R&D, D/M AND
2? IT IS AGREED THAT INITIAL PROBLEMS NO DOUBT STEMMED
FROM INTERNAL MOISTURE, ASSUMING THE FOUR-HOUR BREATHING
EXERCISE AND ALL REQUIRED SERVICING AND OPERATIONAL CHECKS ARE
NORMAL PRIOR TO TAKEOFF, THE FIRST FLIGHT SHOULD BE
CONDUCTED WITH THE FOLLOWING RESTRICTIONSI
A. A CLEAR AIR MASS LEVEL-OFF FOR 15 TO 20 MINUTES SHOULD
BE PLANNED BETWEEN 25- 35#800 FT TO AFFORD PILOT AMPLE TIME TO
INSURE THAT BOTH SYSTEMS ARE PROPERLY OPERATING.
AS OUTLINE
OPS,s AND WE CONCUR WITH YOUR FLIGHT AND MAINTENANCE ACTIVITY,
THE SOMETIMES EXPERIENCED 120-130 PSI OVER-
DURING FLIGHT.
C. PILOT WILL BE RE-BRIEFED AS APPROPRIATE ON THE
PRESSURE WILL BE REASON FOR MISSION ABORT AT ANY TIME
Approved For Release 2002/10/31 : CIA-RDP99B00048R000100270008-1
25X1A
25X1A
IN 28957 SECRET PAGE I OF 2
Approved For Relea'Se 2002/10/31 : CIA-RDP99B00048R00000270008-1
PAGE 2
S E +C R E T
ENTIRE OXYGEN SYSTEM OPERATION TO INCLUDE THE EMERGENCY
GASEOUS SYSTEM.
MAINTENANCE TO OXYGEN SYSTEM, PURGING AND SERVICINGS
HAVE IN ALL PROBABILITY ELIMINATED MOSITURE PREVIOUSLY INTRODUCED INTO
SYSTEM, DESIRE YOU ESTABLISH MCCOY SERVICING AND MAINTENANCE ACTIONS
DOCUMENTATION WHICH MIGHT BE USEFUL IN FURTHER ANALYSIS SHOULD
PREVIOUS OR RELATED MALFUNCTION BE SUBSEQUENTLY DUPLICATED.
AND POST WILL SE MANNED DURING PERIODS OF FLYING
~TURDAY AND SUNDAY TO PERMIT MATERIEL, R&D OR OPERATIONAL
ASSISTANCE IF REQUIRED.
REALIZE THAT IT IS TOO EARLY TO FINALIZE NEW REDEPLOYMENT
DATE AT THIS TIME,, HOWEVER, CONSIDER NEXT WEDNESDAY A
NG DATE ASSUMING WE COMPLETE SCOPE CROSS OBJECTIVES BY
MONDAY,
END OF MSG
S I7oved For Release 2002/1%/11