POWER STATION AND CEMENT FACTORY IN TALLINN
Document Type:
Collection:
Document Number (FOIA) /ESDN (CREST):
CIA-RDP82-00457R003200070007-9
Release Decision:
RIPPUB
Original Classification:
C
Document Page Count:
4
Document Creation Date:
December 14, 2016
Document Release Date:
December 20, 2001
Sequence Number:
7
Case Number:
Publication Date:
September 6, 1949
Content Type:
REPORT
File:
Attachment | Size |
---|---|
![]() | 295.8 KB |
Body:
Approved For R + ~ TMPjPZ-Q0457RO03
CEIif R ,L IIITELLIGENCE AGE- CY "7 L
25X1X
coast of the Gulf of Finland and about 500 meters west of the cement
factory,
ctf11Q.ttons-' Part of the plaint is = old nowar station apparently
soveral decr-dee old. Annexed to thc:. old building is a new rower station.
Vhoae construction was begun in J.`~ w:~? The new station Should be able to
produce at its full capacity in t:'it.3 course of 1949 if its second boiler
arrivea in time. the boiler still.
was not there.
Aecord.ing to Goren engine-fit tarii working there, the technical equipment.
in tha new olent c+erresraonds :.:;: .?omo measure to the requirements -f a
modern rower st:.iion. In the osc. part are housed a switch house and trap
fo* in ecluir~ er:: Thv two I.-r etc.,am turbo yjF;neratora here at the tarts
of the Gexrxarz c~ ': ?rpati oxa were: placed by three smaller turbo generators
after the .Y-- r took over.
The plant's boiic.x Inatal lat.:`~onr: are fired by oil shale, which is stacked
i great heaps In the area b t c?eu the plant and the coast. A cable
railway with f1 F, cars brine *uis shale into both the old and the now
power s'a'lons Railroad spurs uoanect the 1netall.ations in the area with..
' th. the harbor And the main railroad atoation.-
10. Production? Th% Three new renersitors to :sther do not produce as much as
one of -the ;eerie x-ators used under the Gernan administration. Although in
IV48 a new s ngie:e set in the new power plant was put into production,
tit certain tim*i, of the day t rwrr: ere stU1l disconnections of current in
p.att* of te ci ?i?~ It is ho!~ei: i.wever, ;.'aa.t after the second boiler Is
running in th=a i~;w plant, curr.l..t for the city will in some measure be
:assured, E:aet ;, roductiora are uuttliown to scurce.
P ae m o `ollo g the ,gat er4j in nicst or to ?ca eisos in Estonia,, the
~xm~er plant is c;irected by a r.
12, R~'aqurity AgpRgg~ e? 31711,3 the aovcT tai, jnt is, not fenc,=;d in guards are
F,tationed at als. the entrgr1c s i~~ta the braxldan y The oil shale
dump is also guarded,
c l ` J. key to ru p
1 leap
25X1A
Approved For Release 2002/01/16 : CIA-RDP82-00457R003200070007-9
Approved For Red 7516:
MMURAL N ELL GENGE AGENCY
TO jvAp IN AT`1AC NT 11
Cane r. 7285/2.
QQ457R003200070007-9
25X1A
0OI'
kpt?3