OUTLOOK FOR THE SIBERIA-TO-WESTERN EUROPE NATURAL GAS PIPELINE

Document Type: 
Collection: 
Document Number (FOIA) /ESDN (CREST): 
CIA-RDP83T00853R000100100005-0
Release Decision: 
RIPPUB
Original Classification: 
S
Document Page Count: 
20
Document Creation Date: 
December 21, 2016
Document Release Date: 
October 6, 2008
Sequence Number: 
5
Case Number: 
Publication Date: 
August 1, 1982
Content Type: 
REPORT
File: 
AttachmentSize
PDF icon CIA-RDP83T00853R000100100005-0.pdf1.04 MB
Body: 
Approved For Release 2008/10/06: CIA-RDP83T00853R000100100005-0 Directorate of Secret Intelligence Natural Gas Pipeline Outlook for the Siberia-to-Western Europe State Dept. review completed Secret SOV 82-10120 EUR 82-10078 August 1982 COPY 3 9C) I 1 Approved For Release 2008/10/06: CIA-RDP83T00853R000100100005-0 Approved For Release 2008/10/06: CIA-RDP83T00853R000100100005-0 Approved For Release 2008/10/06: CIA-RDP83T00853R000100100005-0 Approved For Release 2008/10/06: CIA-RDP83T00853R000100100005-0 Directorate of Secret Intelligence Outlook for the Siberia-to-Western Europe Natural Gas Pipeline This assessment was prepared by the Office of European Analysis and the Office of Soviet Analysis. Comments and queries are welcome and may be addressed to the Chief, Resources Branch, Soviet Economy Division, SOYA Secret SOV 82-10120 EUR 82-10078 August 1982 Approved For Release 2008/10/06: CIA-RDP83T00853R000100100005-0 Approved For Release 2008/10/06: CIA-RDP83T00853R000100100005-0 Secret Outlook for the Siberia-to-Western Europe Natural Gas Pipeline Key Judgments We believe that the USSR will succeed in meeting its gas delivery commitments to Western Europe through the 1980s. Moscow has a wide range of options to accomplish this end: ? Deliveries could begin in late 1984, as scheduled, by using existing pipelines, which have excess capacity of at least 6 billion cubic meters (m') annually. ? Using some combination of Soviet and West European equipment, deliveries through the new export pipeline could probably begin in late 1985 and reach nearly full volume in 1987-about one year later than if the sanctions had not been imposed. ? At substantial cost to the domestic economy, the USSR could divert construction crews and compressor-station equipment from new domestic pipelines to the export pipeline or even dedicate a domestic pipeline for export use to ensure capacity adequate to meet contractual delivery LOA-1 The task confronting the Soviets is made easier by the nonlinear relation 25X1 between compressor power requirements and gas throughput in pipeline operations. Completion of the pipeline has become a top-priority objective for the Soviet leadership. On the economic side, they look forward to some $5 billion a year in new hard currency earnings from gas in the early 1990s (after repayment of pipeline borrowing) to partially offset declining oil export revenues. In their view, moreover, the United States' imposition of Information available as of 6 August 1982 was used in the preparation of this report. Secret SOV 82-10120 EUR 82-10078 August 1982 Approved For Release 2008/10/06: CIA-RDP83T00853R000100100005-0 Approved For Release 2008/10/06: CIA-RDP83T00853R000100100005-0 sanctions has made completion of the pipeline a matter of national prestige and has provided an opportunity to foment dissension in the Western alliance. The West Europeans see Soviet gas as a relatively low-priced substitute for uncertain Middle Eastern oil and also view the Soviet pipeline equipment orders as easing their substantial unemployment problems. In addition, they hold that increased East-West economic interdependence will lead to more responsible Soviet behavior. They are deeply angry about the US decision, especially the extraterritorial and retroactive features of the measures, which they regard as a serious infringement of their sovereignty. As a result, the West Europeans are seeking ways to defeat or circumvent the extended US sanctions. Paris has ordered French firms to honor their Soviet contracts, and London-acting under legislative authority-has required British firms to, do the same. Bonn clearly approves of the French action and has made known its position that the West German Government cannot stop the West German firm involved from delivering embargoed material to the USSR. Rome has said that pipeline contracts will be honored but has not yet ordered Italian firms to do so. Taking all this into account, we think the likely Soviet choices for completing the export pipeline-in descending order of probability-are: ? Production of the 40 GE-designed rotors by the French firm Alsthom- Atlantique under its existing contract with the Soviets-the move already announced by Paris. ? Western assistance in manufacturing.rotors for Soviet-designed 25- megawatt turbines. ? Soviet redesign of pipeline compressor stations, substituting a combina- tion of smaller turbines or other drivers of either foreign or Soviet design. Only the last outcome--primary reliance on their own resources-would cause the USSR much difficulty. The costs to them will be much higher if they have to build their own gas turbines and compressors for the export pipeline. Specifically, diverting from the domestic pipeline program Soviet equipment sufficient to equip the export line could reduce gas delivery to the domestic economy by as much as 30 billion m' annually for a year or two. Other Soviet equipment options would have considerably smaller impact on domestic gas supply. Approved For Release 2008/10/06: CIA-RDP83T00853R000100100005-0 Approved For Release 2008/10/06: CIA-RDP83T00853R000100100005-0 Secret The Export Pipeline's Place in Soviet Pipeline Plans 3 Importance of the Project for the USSR and Western Europe 3 Soviet Options 5 The West European Companies and Their Views 8 Nuovo Pignone 9 United Kingdom 11 Short-Term Outlook 11 Approved For Release 2008/10/06: CIA-RDP83T00853R000100100005-0 Approved For Release 2008/10/06: CIA-RDP83T00853R000100100005-0 Siberia-to-Western Europe Natural Gas Pipeline* The Pipeline at a Glance Length: 4,650 kilometers (Urengoy-Uzhgorod) year (net) Operating Pressure: 75 atmospheres Tarvisi Italy Figure 1 .- Nizhnyaya Tura erm' Soviet Caspian Sea Aral Sea Yugoslavia not necessarily authoritative. ~~ j! hgored- Svalyava Approved For Release 2008/10/06: CIA-RDP83T00853R000100100005-0 Approved For Release 2008/10/06: CIA-RDP83T00853R000100100005-0 Secret Outlook for the Siberia-to-Western Europe Natural Gas Pipeline F_ The Siberia-to-Western Europe natural gas pipeline is the largest East-West trade project to date (see thumbnail description in figure 1). Under negotiation since 1979, the pipeline has a planned gross capacity of 35 billion cubic meters annually and could deliver nearly 30 billion m' to West Germany, France, Italy, Austria, and other countries for 25 years. Gas pur- chase agreements were signed in late 1981 with West German and French utilities and in June 1982 with Austria's Ferngas. Initial exports of 3 to 5 billion m3 per year are to start in 1984, and full deliveries are scheduled to begin in 1987. The USSR will be able to use a combination of the existing Soyuz export pipeline, domestic trunklines, and East European transit lines to begin initial deliv- eries in late 1984 or to supplement the initial through- put of the export pipeline. With the phasing-in of the new gas export pipeline, total Soviet gas deliveries to Western Europe-under older contracts as well as the new export pipeline contracts-could reach about 42 billion m' in 1985 and then rise to as much as 54 billion m' in 1987 (see table 1).' Annual gas deliveries to Eastern Europe would increase by several billion m' if 10 percent of the projected Soviet exports are delivered to Czechoslovakia and Hungary as transit Western Europe remains the primary market for additional Soviet natural gas exports. Although gas demand has softened in recent years, it is expected to bottom out this year and revive as economic recovery begins. Total West European gas demand is expected to grow from about 215 billion m' in 1980 to 245 billion m' in 1990, and perhaps to 270 to 300 billion m' by the year 2000. The Soviets are anxious to increase gas exports to Western Europe. With the completion of the export pipeline, deliveries would ' The information available on the deliveries under the new contracts is still extremely sketchy, so the timing depicted in table 1 should be considered a rough estimate of the delivery profile. F_ Existing contracts 10.9 12.0 12.0 12.0 24.3 30.8 42.1 54.1 a Excluding Finland; amounts of annual offtake under the new contracts are subject to reduction by up to 20 percent under scheduled semiannual negotiations with the Soviets. b Italy has not yet signed the new purchase contract. Excluding potential deliveries of 0.8 billion m' to West Berlin. 25X1 25X1 25X1 25X1 25X1 more than double by 1990, compared with the present level. At that time, West European countries could be relying on Soviet gas for nearly one-fourth of their gas requirements. Unless Western alternatives to Soviet gas are developed, the USSR could capture an even larger share of the West European gas market in the 1990s. Approved For Release 2008/10/06: CIA-RDP83T00853R000100100005-0 Approved For Release 2008/10/06: CIA-RDP83T00853R000100100005-0 Major Western Suppliers for Compressor-Station Equipment General contractors for Mannesmann-Creusot-Loire Nuovo Pignone compressor stations (22 stations-$940 million) (19 stations-$560 million) Gas turbines-Frame V 25-MW AEG-Kanis a (42 turbines) Nuovo Pignone a (57 turbines) John Brown a (21 turbines) Gasline compressors Creusot-Loire (42 compressors) Nuovo Pignone a (57 compressors) Dresser-France (21 compressors) Frame V turbine rotor sets General Electric (63 rotor sets) General Electric (57 rotor sets) Computer system for central control of export pipeline Thomson/CSF Thomson/CSF Soviet order (Nov. 1981) for 40 Frame V rotor sets (end use uncertain) Alsthom-Atlantique a Alsthom-Atlantique a While most of the new large-diameter lines being built in the Soviet Union will depend on domestically produced compressor-station equipment of less than optimum reliability and efficiency, the export line was planned to have a first-rate array of Western equip- ment. The added reliability of the system would benefit the Western purchasers of Soviet gas, and the supply of equipment financed by Western credits .would reduce investment burden on the Soviet economy. Deliveries of gas to Western Europe under the new supply contracts can begin in late 1984 using excess capacity in existing pipelines transiting Czechoslova- kia. As the volume of deliveries increases, however, Secret 2 Approved For Release 2008/10/06: CIA-RDP83T00853R000100100005-0 Approved For Release 2008/10/06: CIA-RDP83T00853R000100100005-0 Secret new transit pipeline capacity will be necessary. Some reports indicate one new transit pipeline will probably pass through Czechoslovakia to Waidhaus, West Ger- many, possibly with a branch through Baumgarten, Austria, to Italy. Other reports, however, suggest that Hungary will build the branch to Italy. Whichever decision is taken as to the route, a transit pipeline to cover the distance of roughly 800 km from the Soviet border to Waidhaus, West Germany, or Tarvisio, Italy, could be completed well before the added capacity is needed. If the Soviets want to provide transit capacity for future expansion of their gas export pipeline system, they could press Czechoslovakia to build a 1,420-mm (56-inch) line to Waidhaus and ask Hungary to build a 1,420-mm line to Tarvisio. Compressor-station power could be supplied by GE-design Frame V 25- MW gas turbines or by any of a wide selection of smaller equipment, including 12-MW or 16-MW electric motors. A number of Japanese and West European manufacturers of turbines, electric motors, and compressors appropriate for gas transmission service have been actively seeking contracts from Czechoslovakia and Hungary. The Export Pipeline's Place in Soviet Pipeline Plans The gas export pipeline project dominates Soviet energy export plans for the 1980s and will have a strong influence on the gas industry's pace of develop- ment. But the Siberia-to-Western Europe pipeline is only one of six 1,420-mm gas pipelines that the Soviets hope to complete in the current Five-Year Plan (1981-85).2 Two of the five domestic lines have already been laid. In addition to the export pipeline, Moscow hopes to lay by 1985 three more lines from the Urengoy gasfield to the European USSR, each 3,000 to 4,000 km long. The six new 1,420-mm trunklines from West Siberia account for roughly ' The new pipelines being constructed represent a major extension of the Soviet gas transmission system, which has grown rapidly, from only 5,000 km in 1955 to 132,000 km in 1980. A large share of the network transits territory where physical and environmental conditions are harsh and the infrastructural base is sparse. The major gas pipeline corridors of the USSR link the gas-rich regions of West Siberia, Central Asia, the Ukraine, and the southern Urals one-half of the total of 48,000 km of gas pipelines planned for construction in 1981-85. 25X1 25X1 By the end of 1980, about 17,000 km of the Soviet gas transmission pipeline system consisted of imported 1,420-mm pipe. The Soviet Union has not succeeded in mass producing 1,420-mm pipe of high quality and strength for gasline service at 75 atmospheres. Much of the pipeline system operates at lower pressures and, consequently, the throughput is below the maximum attainable. In addition, because of shortages of appro- priate equipment, Soviet pipelines often operate for extended periods with only a part of the designed compressor capacity installed. Running below capac- ity entails added costs per unit of gas delivered. Such costs might not be acceptable in Western market economies, but the Soviets are inured to the added burden of second-best solutions. Moscow plans to increase pipeline deliveries of gas by almost half from 1980 to 1985 despite prospective equipment shortages. 25X1 Importance of the Project for the USSR and Western Europe 25X1 The USSR Moscow wants the gas export project for three basic reasons. Most important, the pipeline will earn badly needed hard currency and aid development of the Soviet gas industry. These objectives are increasingly important to the troubled Soviet and East European economies. At the same time, the USSR sees the project as a major step toward expanding its commercial and political ties with Western Europe at US expense. Hard Currency Earnings. The pipeline is vital to Moscow's prospects for earning sufficient hard cur- rency beyond the mid-1980s to avoid a major drop in its import capacity. Oil export revenues will probably fall substantially by 1985, and gas exports-under the export pipeline deal and preexisting contracts-will pick up much of the slack. Revenues from the pipeline Approved For Release 2008/10/06: CIA-RDP83T00853R000100100005-0 Approved For Release 2008/10/06: CIA-RDP83T00853R000100100005-0 deal alone should reach $5 billion (in 1981 dollars) annually in the early 1990s when all credits are repaid, and total gas earnings (including existing contracts) could be roughly $10 billion. The pipeline thus will support Moscow's purchases of Western goods and technology, which will be increasingly important to improving industrial productivity and to reducing agricultural shortfalls. The earnings from export deliveries of gas will also help the Soviets to maintain economic support to Eastern Europe, sup- port that is now threatened by the hard currency crunch and domestic requirements. Aid to Gas Production. Moscow almost certainly hopes that the pipeline project will establish reliable non-US sources of equipment for developing Siberian gas production, the key to Soviet energy plans through 1990. Gas output will provide almost all the growth in Soviet primary energy production and will be an increasingly important source of Soviet energy sup- plies to Eastern Europe. Because Western pipeline equipment will be critical to meeting plans for rapid gas production growth, the Soviets are now seeking to establish secure, non-US sources of supply-particu- larly for turbines, the technology most vulnerable to US sanctions. Moscow may see the turbine orders for the export pipeline as leading to further contracts, with the West Europeans possibly participating in the manufacture of a turbine of Soviet design. The Sovi- ets, at the least, expect the current deal to sustain West European business interest in future gas-for- equipment agreements. An assured non-US source of supply for pipelayers capable of handling 1,420-mm pipe is a critical consideration bearing on completion of the large pipelines planned. Because of the embargo on US equipment, the Soviets are obtaining large numbers of pipelayers from a Japanese manufacturer, Komatsu. The Komatsu deliveries, together with the pipelayers and associated equipment already in the USSR, ap- pear to ensure that there will be no large imbalance in availability between pipelayers and large-diameter pipe in the next year or so. Political Objectives. The Soviets almost certainly view the pipeline project as a means of increasing divisions between Western Europe and the United States, and the embargo has enhanced Moscow's ability to pursue that goal. The USSR probably believes that the West Europeans' increased depen- dence on Soviet gas deliveries by the late 1980s will become a permanent factor in their decisionmaking on East-West issues. In the past, the Soviets have used West European interest in expanding East-West com- merce to undercut US sanctions, and they believe a successful pipeline deal will reduce future European willingness to support a US disruption of East-West trade. West European Interests The West Europeans have several reasons for wanting the gas export pipeline, including diversification of energy sources, pipeline-related export contracts, the relatively low price of Soviet gas, and the hope that economic ties will contribute to detente. Diversification of Energy Sources. The West Europe- ans' prime reason for wanting the pipeline is to reduce their dependence on OPEC oil. Although that depen- dence has fallen substantially since 1973, Western Europe still imports more than half of its total energy requirements, and the bulk of those imports come from OPEC. Soviet gas, by contrast, would cover only about 3 percent of total energy needs once the pipeline is completed. Moreover, the West Europeans regard the USSR as a more reliable supplier than some OPEC countries. Given the absence of sufficient alternative gas supplies during the 1980s, they feel strongly that the pipeline will enhance their energy security rather than detract from it. They also believe that they could cope reasonably well with even a total cutoff of Soviet gas deliveries, through a combination of conservation, fuel-switching, temporary increases in domestic gas production, and drawdown of gas stocks. Although projections of West European demand for gas have been cut sharply over the last few years, we estimate that consumption in 1990 will nonetheless be Approved For Release 2008/10/06: CIA-RDP83T00853R000100100005-0 Approved For Release 2008/10/06: CIA-RDP83T00853R000100100005-0 Secret some 30 billion m' higher than in 1980-equivalent to the maximum delivery capacity of the new export pipeline. Moreover, domestic production-mostly in the Netherlands-is expected to begin a steep decline within a few years. Should gas consumption fall well below expectations later in the decade, the West Europeans could respond by temporarily reducing domestic production. Any surplus probably would disappear within a few years, as Western Europe now appears to be facing a gas shortfall in the 1990s. Employment. The West Europeans prize the jobs provided by pipeline-related export contracts. While the actual number of jobs involved is rather low- perhaps several tens of thousands total for the four countries involved-they tend to be concentrated in depressed industries and depressed regions. Moreover, unemployment is at or near post-1930s records in most of these countries, making any jobs-related issue a sensitive matter. Prices. Soviet gas also looks attractive to the West Europeans because it is relatively cheap in comparison either with OPEC oil or with gas from other potential suppliers such as Norway or Algeria. Detente. Finally, the West Europeans regard trade with the Soviet Union as a stabilizing element in East- West relations and consequently as a factor enhancing their national security. They have been unwilling to give up detente in Europe because of Soviet expan- sionism in other parts of the world, and they do not appear to give the United States much credit for shouldering the burden of protecting their interests in other areas, especially the Middle East. Moscow has a wide range of options available to meet its gas delivery commitments to Western Europe under the contracts recently negotiated or still under negotiation. The most important options relate to sources and types of equipment, use of other pipelines, and adjustment of gas delivery schedules. Alternative Sources of Equipment 25X1 25X1 25X1 25X1 25X1 Moscow can try to convince Western suppliers to deliver the equipment now on order, equip the pipeline with Soviet turbine-compressors, or work out a combi- nation of these approaches. Some of the technical options are listed in table 3. In most cases these options individually would provide adequate compres- sor power for a substantial flow of gas through the export pipeline in 1984. Equipping all compressor stations with the planned array of equipment (both on line and standby) would extend final completion of the export pipeline to around 1987-88. 25X1 throughput is not linearly related to compressor power (see figure 2), the export pipeline could deliver about 25 billion m' per year, about 85 percent of designed capacity. Annual deliveries at this rate would exceed the total volume of gas that the West Europeans have contracted for or are likely to buy in the late 1980s.LI 25X1 Moscow's attempts to improve the availability, capac- ity, and reliability of the Soviet gas turbines manufac- tured for gas pipeline service have been meeting with some success, according to recent reports. Soviet-25X1 made gas turbines, which account for the bulk of compressor power installed on Soviet gas pipelines, have up to this time been produced mainly in 6-MW and 10-MW sizes-considerably smaller than the 25- MW unit desirable for the most efficient performance on 1,420-mm pipelines. 25X1 The Soviets may be close to a breakthrough in 25X1 development of larger turbines, however. After a decade of development, prototypes of the Soviet GTN-16 (16-MW) and GTN-25 (25-MW) units have been built and tested. According to Soviet reports, serial production of these units is beginning. If even 10 25X1 Approved For Release 2008/10/06: CIA-RDP83T00853R000100100005-0 Approved For Release 2008/10/06: CIA-RDP83T00853R000100100005-0 Soviet Technical Options To Counter the US Embargo Soviet Technical Options To Obtain Compressors for the Export Pipeline Use of 20 GE-manufactured rotor sets already in Europe and the 40 Alsthom- Atlantique rotors (ordered in Novem- ber 1981) in 25-MW Frame V turbines Accelerated introduction of the Soviet 16-MW and 25-MW turbines Use of smaller (e.g., 10-MW) Soviet- built turbines Soviet-designed rotors manufactured in Western Europe Use of Soviet 25-MW turbines with a Initial export delivery volumes of at least 7 billion m'/yr, excluding d Output of GTK- 10 turbines would suffice for export line and all other options listed. some-but not all-planned domestic pipelines. b Full capacity of pipeline (using gas from the pipeline as fuel for e A mix of Western variable speed turbines such as those made by turbines and delivering about 30 billion m'/yr to Czech border), Sulzer or Stal-Laval. excluding all other options listed. e Additional turbines supplying a total of 1,500-MW would be required to reach 100 percent of planned throughput capacity and provide for installation of all standby units by 1988. to 15 turbines in each of these series could be produced annually, Moscow's capacity to equip the export pipeline at minimum cost to the domestic economy would be considerably enhanced. But Soviet turbines have a service life between major overhauls that is only a small fraction of that offered by Western equipment. The Soviet units, moreover, have been chronically in short supply, causing long delays in bringing domestic pipelines up to full throughput. For the new larger turbines-as yet untried under Soviet pipeline operating conditions-the question of reliability and service life is undoubtedly worrisome to Soviet gas industry officials and reinforces their basic preference for Western equipment on the export pipeline. Alternative Types of Equipment While 25-MW gas turbines are the best power source, the Soviets could turn to smaller gas turbines, other power sources such as electric motors, or some combi- nation of equipment. Although Moscow probably would not mix different types of compressor drive equipment in any one compressor station for reasons related to pipeline control and maintenance, it is considering an option to equip some stations with Western equipment and others with Soviet equipment. This is technically feasible and offers a way of, accelerating completion of the pipeline. For example, Moscow might combine options such as the first and second options listed in table 3. The Soviet Gas Ministry has a strong preference for powering gasline compressors with gas turbines fueled from the pipe- line, in part because this mode of operation achieves independence from reliance on outside energy sources Approved For Release 2008/10/06: CIA-RDP83T00853R000100100005-0 Probability of Realization Cost to Soviets Initial Substantial Volume a Full Throughput Capacity b Probable Reliability of Pipeline Operation Very High Low _ Very High High _ High Moderate Moderate Low Approved For Release 2008/10/06: CIA-RDP83T00853R000100100005-0 Secret Figure 2 Relation Between Compressor Power and Gas Throughput on Large Pipelines (in Percent) 40 20 0 0 20 40 60 80 100 Power Input and does not reduce local energy supply in the regions transited. We believe that the use of electric motors would be avoided by the Soviets because of the need for new powerlines in Siberia, the drain it would impose on already heavily taxed power grids in the western USSR, and the possible difficulties associated with variable speed control on 12-MW or 16-MW motors. Use of Other Pipelines Moscow may elect to supply some of the gas called for under the new contracts with West European pur- chasers through excess capacity in the existing gas transmission system to Western Europe, and it could also utilize pipelines in the rapidly expanding domes- tic trunkline system carrying gas from the huge Urengoy field to the western USSR. By the end of 1982, the Soviets will have laid three new 1,420-mm pipelines from Urengoy into the western USSR, ac- counting for 7,000 km of the 14,000 km of domestic gas trunklines planned for 1981-85. Through inter- connections with the existing gas transmission pipe- line network, or by extending one of the new pipelines (for example, some 1,300 km from Novopskov to Uzhgorod), sufficient gas could be diverted from the domestic system to meet the new export delivery commitments. This course of action, however, would result in a somewhat higher shortfall in domestic gas deliveries than would diversion of Soviet equipment to the export pipeline. Adjustment of Gas Delivery Schedules 25X1 West European gas requirements through 1987 are likely to fall well below the full volume specified in the contracts. Moscow therefore may be able to adjust the phasing-in of gas deliveries to some or all of the West European customers. Such adjustments would in turn permit stretching out equipment delivery and installation schedules. 25X1 Implications for the Soviet Economy 25X1 Since the USSR apparently can meet its commit- ments for delivering gas to Western Europe despite the expanded US sanctions, we believe that there will be little or no effect on the Soviet hard currency position in the 1980s. The qualifications to this judg- ment are: 25X1 ? Some of the options imply higher hard currency costs of obtaining Western equipment. West Ger- man and British turbine manufacturers, for exam- ple, professed reluctance to rely on Alsthom-Atlan- tique for rotors because they would be too expensive. But the added cost would be trivial in comparison with anticipated revenues from Soviet gas exports, and Moscow would probably pick up the tab for some increase in project costs. 25X1 ? If project delays were to lead the USSR to ask for a stretched-out buildup of deliveries through the ex- port pipeline, the loss of hard currency earnings could amount to roughly $1.5 billion annually for a year or two. Approved For Release 2008/10/06: CIA-RDP83T00853R000100100005-0 Approved For Release 2008/10/06: CIA-RDP83T00853R000100100005-0 ? Should the.USSR push some gas intended for domestic use through existing pipelines before the new export pipeline is ready, it might have to use oil internally where it had hoped to use gas. The oil might have to be held back from export to hard currency countries, resulting in an earnings loss of almost $200 million for the oil equivalent of each billion m' of gas displaced. The principal impact of the sanctions on the Soviet Union would be added strain on an extremely taut domestic economy. The diversion of Soviet-made compressor equipment from the domestic gas trans- mission system would increase the real cost of the export pipeline project to the Soviet economy and would decrease the reliability of the export pipeline. In the extreme case-denial of all Western compres- sor equipment coupled with a crash Soviet effort on the export pipeline-the USSR could lose roughly 30 billion m' of gas production in 1985 because of reduced compressor power on the domestic transmis- sion lines. The forgone production would represent about 5 percent of planned output of gas in 1985 and somewhat less than 2 percent of planned energy production. Moscow clearly would prefer to avoid the disruption in domestic energy plans that would result from diversion of equipment to the export pipeline. Some of the increase in supply of Urengoy gas to the domestic economy is needed to offset declining gas availability from the older Ukraine and Caucasus gasfields. The planners cannot be sure that domestic production capacity can be geared up quickly enough to supply compressors for both the export pipeline and the equivalent of even four of the five domestic lines planned for 1981-85. If necessary, however, the Sovi- ets would accept the costs entailed in order to ensure the expected hard currency revenues from the new gas sales beginning in 1984. Facing a tight supply of energy in the mid-1980s, Moscow might be forced to reduce delivery of fuels to Eastern Europe more rapidly than it now deems politically feasible. It would also have to make internal adjustments in planned gas consumption that could: ? Curb efforts to substitute gas for oil and coal. ? Reduce industrial efficiency, especially in metals and petrochemicals. ? Intensify competition between sectors of the econo- my for scarce resources. The West European Companies and Their Views The four West European companies at the center of the storm-those supplying compressor-station equip- ment for the pipeline-have all been put in a difficult position by the extended US sanctions. To varying degrees, they need the sales and jobs offered by the Soviet contracts, but they also have important dependencies on the United States. In the absence of government intervention, most of the firms probably would obey the sanctions. Alsthom-Atlantique. Alsthom's role is particularly important because it is the only West European company licensed to produce the GE rotors. It is also subject to rather direct government control because its maiority shareholder is a state-owned firm. can produce the rotors without any assistance from General Electric. When it purchased the technology in 1980, GE provided all the necessary engineering drawings and specifications. Alsthom could in fact produce rotors at an increased rate, but this would require a fairly costly plant expansion. If Paris had not ordered it to honor the Soviet contract, Alsthom-because of reluctance to damage its 20-year relationship with GE-probably would 25X1 25X1 Approved For Release 2008/10/06: CIA-RDP83T00853R000100100005-0 Approved For Release 2008/10/06: CIA-RDP83T00853R000100100005-0 Secret have complied with the sanctions. However, company officials clearly think the sanctions are unenforceable. They argue that the licensing agreement with GE only restricts Alsthom from selling the technology- not the products-to third parties, and they claim that the US prohibition cannot be applied retroactively in any case. The Soviet contract is not essential for Alsthom. The company is relatively sound financially, posting a $36 million profit last year. Moreover, the $60 million contract equals less than 3 percent of the firm's 1981 sales. AEG-Kanis. As of early August, company officials had not yet decided whether to supply pipeline tur- The US sanctions put AEG in a difficult position. It needs the Soviet contract but is reluctant to jeopar- dize its US interests. The $250 million turbine contract is important to AEG-Kanis-which has 2,900 employees and about $130 million in annual sales-because its parent company, AEG-Telefunken, is virtually bankrupt. In- deed, the parent company cannot survive in its present form, with or without the pipeline order. Although it is West Germany's eighth-largest employer (with 96,000 workers), AEG has been on a downhill path 25X1 25X1 25X1 25X1 since the late 1960s. During 1979-81 the parent firm lost close to $800 million, and a deficit of $225 million is projected for this year. Loss of the turbine contract apparently would add about $40 million to this figure. AEG's directors are currently trying to avert bank- ruptcy with a complicated restructuring plan that includes major sacrifices by the banks, the closing of some facilities and the selling of others, and a large injection of foreign equity capital. Perhaps in part because of the sanctions issue, Bonn is deviating from its free-market principles by providing loan guaran- tees to assist the rescue effort. 25X1 25X1 Nuovo Pignone. Nuovo Pignone-the general con- tractor for 19 of the 41 compressor stations and 57 of the 125 turbines-is still unsure how to proceed. The firm wants to maintain good relations with GE but 25X1 knows that refusal to meet delivery schedules could result in substantial penalties. Despite healthy profits in recent years ($24 million 25X1 during 1978-81), the firm probably cannot afford the loss of a contract that represents up to one and a half years' sales. Without the contract the firm would be stuck with a large pipeline-related inventory, estimat- government bail-out under a worst-case situation is possible but, given Italy's massive budget problems, is far from assured. 25X1 25X1 25X1 Secret 25X1 25X1 Approved For Release 2008/10/06: CIA-RDP83T00853R000100100005-0 Approved For Release 2008/10/06: CIA-RDP83T00853R000100100005-0 John Brown. In response to London's order, the British firm has announced that it will begin shipping this month the six turbines with GE rotors that it has onhand. The extended sanctions have put the compa- ny in a desperate position, and we believe it ultimately would have shipped the turbines anyway. Failure to honor the Soviet contract apparently. would cause a loss of about $250 million. This would force John Brown Engineering-the turbine manufacturing sub- sidiary-into bankruptcy, putting 1,700 people out of work. It also would seriously threaten the survival of the parent firm, John Brown Ltd., whose net worth is Rome will sit on the fence as long as possible but if forced to decide probably will follow the French and British example. France. Among the West European leaders, President Mitterrand has been the most outspoken in declaring that France will not engage in economic warfare against the Soviets;, he believes that acquiescing in the new US sanctions would be a move in that direction. Paris is convinced that the US claims of extraterri- toriality and retroactivity are weak. The French also insist that contracts already concluded must be car- only slightly greater than $250 million. On the other hand, violating the US sanctions may also lead to bankruptcy. John Brown Engineering relies exclusively on GE components for its turbines, and US blacklisting could force the company to cancel non-Soviet orders for turbines stretching out over the next two years. Company officials had been playing for time by seeking a further extension in delivery dates. They believed that the firm had until the end of August to begin shipment or face damage claims. The officials probably still hope for US authorization to ship the six turbines with GE rotors, in which case they believe Moscow would let the company renege on providing the remaining 15 turbines. The order from London to honor the Soviet contract is the second-best outcome, in company eyes, because it may open the door for damage claims against the British Government. F_ The four West European governments reacted to the sanctions extension with varying degrees of surprise and anger. They question the extraterritorial and retroactive nature of the sanctions, which are viewed as infringing on West European sovereignty. Other common themes are that the sanctions are inappropri- ate and will not affect Soviet behavior, that contracts must be honored, and that the pipeline will be built. Paris and London have ordered firms in their coun- tries to fulfill their Soviet contracts, and Bonn has at least tacitly encouraged AEG-Kanis to do the same. Secret ried out. Paris has ordered Alsthom to proceed with the 40 rotors already under contract. 25X1 25X1 French officials arsine to see the pipeline completed. If they 25X1 had not ordered Alsthom to go ahead, they would have pursued some other option, such as joint efforts with the Soviets to develop separate technology or revival of the alternate European projects that had been advanced earlier but rejected by the Soviets in favor of GE. West Germany. Government officials have stated that Bonn cannot allow the US sanctions to force West German firms to break contracts. that the government has no authority to force AEG to move in either direction, but that it would welcome completion of the contract. West German leaders were shocked and dismayed by the sanctions extension, which they regard as a com- pletely unacceptable intrusion on West European sovereignty. They are adamant that the pipeline will 25X1 25X1 25X1 25X1 25X1 25X1 Approved For Release 2008/10/06: CIA-RDP83T00853R000100100005-0 Approved For Release 2008/10/06: CIA-RDP83T00853R000100100005-0 Secret be completed and have expressed approval of France's decision to produce the rotors as scheduled. Because of the traditional West German respect for the sancti- ty of contracts, they are particularly upset at the retroactive aspect of the sanctions, and of course they are concerned about the added problems that may be caused for the effort to rescue AEG. 25X1 regulations in Britain, and on 2 August London announced that it would order firms in Britain- 25X1 including three subsidiaries of US firms-to fulfill 25X1 their contracts in direct contravention of the sanc- tions. 25X1 Bonn officials are worried about the impact on US- West European relations and thus have downplayed the sanctions issue in public. For example, Economics Minister Lambsdorff recently characterized it as nothin more than a family dispute. Publicly, the West European govern- Italy. After some hesitation, Rome finally joined its European partners in condemning the US action. We believe that partisan differences within the Spadolini coalition on the wisdom of buying more Soviet gas and subsidizing pipeline contracts account for the initial hesitation and the persistent fuzziness of Italian positions. After the Foreign Ministry publicly stated on 24 July that signed pipeline contracts would be honored, Italian diplomats rushed to assure US offi- cials that Rome had not yet instructed Nuovo Pignone to disobey US sanctions. Given domestic political constraints, Italian officials probably will try to main- tain an ambiguous position as long as possible. If Rome is forced to take a clear-cut stand, we believe the government will follow in the French and British footsteps. United Kingdom. London strongly opposes what it sees as questionable extraterritorial and retroactive application of US law. Prime Minister Thatcher has described the US decision as "wrong and ultimately harmful to US interests." The government has said that it will not accept the extension of US jurisdiction and will use whatever countermeasures are available, including trade restrictions on US firms. Existing legislation allows it to block applicability of US trade ments have expressed determination to proceed with the project, and decisions to go ahead may be made at any time. 25X1 The Soviets have continued their hardline approach involving threats of contract cancellation and imposi- tion of severe penalties against the financially shaky firms. The Soviet media have also become increasing- ly vocal in recent weeks. Soviet officials are claiming that they can equip the export pipeline themselves by accelerating development and production of their own 25-MW turbine. Such an effort has been endorsed by the Communist Party and the Council of Ministers. A joint resolution was adopted on 12 July stating that gas will be supplied for domestic users in quantities determined by the Five-Year Plan and for export in accordance with signed contracts beginning in 1984. Overcoming the US embargo continues to be seen in Moscow as a matter of national pride, and workers are being saturated with patriotic slogans. We do not believe the Soviets will abandon their West European equipment connections so quickly, however, given the current friction between the West Europe- ans and the United States, their strong preference for the reliability offered by Western equipment, and the costs to the Soviet economy of going it alone. The Soviets probably are confident that a joint Soviet- 25X1 Approved For Release 2008/10/06: CIA-RDP83T00853R000100100005-0 Approved For Release 2008/10/06: CIA-RDP83T00853R000100100005-0 West European solution can still be worked out; their deadlines have been'set in the past and extended or ignored; The Soviets may be planning for the remote contin- gency that the expanded US embargo will be success- ful, but they almost certainly do not believe that the GTN-25 is by itself a viable, short-term alternative. Despite the risk to domestic gas supply that would be entailed by shifting smaller turbines from domestic pipelines to equip the export line, the importance of substantially increased hard currency earnings could prompt Moscow to take such a step. The availability of some Frame V turbines built with the GE rotors and/or West Euro- pean manufacturing help with the GTN-25 would ease the internal burden of any turbine switching. The West Europeans are beginning to act. Paris and London have ordered companies in their countries to honor their pipeline contracts, while Bonn has at least hinted to AEG-Kanis that it should do the same. West German banks also have formally signed the $1.1- billion credit agreement for the pipeline. In addition to continued attempts to get the United States to soften or withdraw its sanctions, the West Europeans appear increasingly ready to take the final= step in direct defiance of the sanctions and/or to take other actions' against the United States. Incoming EC Am- zbassador to the United States, Sir Roy Denman, has already compiled, a list of possible retaliatory ac- tions-including legal challenges, withdrawal of sup- port for US initiatives to liberalize trade in banking and insurance and to ease the international flow of investment and dividends, and the imposition of duties on US agricultural exports to the Community. The French Government has drawn up its own list as well, largely involving nontariff restrictions on US exports Despite the current acrimony, a point of no return has not yet been reached. The British, West Germans, and Italians have not yet shipped anything to the are still working to find a compromise. Moreover, there still seems to be lingering hope that West European outcries over the issue will force the US to lift the embargo. Final disposition of the rotors will determine the winner and loser in this political tug of war. The Soviets undoubtedly feel that if the West Europe- an contractors can be persuaded to deliver the rotors, additional petroleum equipment embodying US tech- nology will pour forth from Free World producers outside the United States. Many US patents already have expired, or soon will, and the economic advan- tage to be gained from copying US equipment and taking over US markets will not be ignored in West- ern Europe and Japan. In fact; this form of competi- tion is already encouraged-and in many cases subsi- dized-by governments through. provision of investment capital and concessionary financing for export sales. Foreign governments and firms will be reluctant to disturb historic trade relationships with the United States. But if corporate survival and national interests conflict sharply enough with US policy, the legality of the US sanctions will probably be challenged directly by legislative or administrative measures or by actions in unfriendly foreign courts. Should business and economic conditions become worse, for the West Euro- pean pipeline contractors, the flood gates holding back equipment affected by the US embargo would be opened much sooner. Approved For Release 2008/10/06: CIA-RDP83T00853R000100100005-0 25X1 25X1 25X1 25X1 25X1 25X1 25X1 25X1 Secret Approved For Release 2008/10/06: CIA-RDP83T00853R000100100005-0 Secret Approved For Release 2008/10/06: CIA-RDP83T00853R000100100005-0